Bid Publish Date
07-Feb-2026, 10:10 am
Bid End Date
28-Feb-2026, 11:00 am
Location
Progress
Quantity
1000
Organization/Department: Government e-Marketplace (GEM) indicative buyer; Location: Tekanpur, Gwalior, Madhya Pradesh (BSF) address; Product Category: Central/State Govt category with OEM/authorized distributor eligibility; Estimated Value: Not disclosed; EMD: Not disclosed. The tender includes a flexible option clause allowing ±25% quantity variation at contracted rates and extended delivery time rules. A mandatory precondition requires Detailed Design Drawings to be approved within 10 days of award, with modification cycles if needed. Post-approval, supply must align to approved drawings; delayed approvals shift delivery timelines without LD. Bidders must verify GST obligations; GST reimbursement is capped to actuals or applicable rates, whichever is lower, within quoted GST %. Experience criterion mandates 3 years of regular supply to Govt/PSU bodies. OEM authorization or reseller arrangements are allowed. The BOQ shows zero items, indicating either a framework or Services-based requirement; bidders should anticipate integration with a central procurement workflow.
Product/service: Govt procurement in security/central govt category with OEM authorization
Quantity: up to 25% variation relative to bid quantity
Standards/Compliance: IS/ISO standards to be confirmed (not specified in data)
Delivery: To BSF Tekanpur, MP; installation if covered
Warranty/Service: Not specified in tender data; subject to drawings and approvals
Option clause allows ±25% quantity change and extended delivery time with calculation
Mandatory detailed design drawings approval within 10 days of award
Tax/GST handling and supplier verification of financial standing
GST payable by bidder; reimbursement capped to actuals or quoted rate; no explicit advance payment mentioned
Delivery commences from last date of original delivery order; option time extension formula used; minimum 30 days
No explicit LD terms stated; delays due to drawing approvals may shift delivery without LD
Not under liquidation or bankruptcy; formal undertaking required
3 years govt/PSU supply experience in similar category products
OEM authorization or authorized distributor arrangement allowed
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates showing 3 years of govt/PSU supply
Financial statements or proof of financial standing
OEM authorization or distributor appointment (if applicable)
Detailed Design Drawings submission with bid
Delivery/compliance certificates for similar category products
Undertaking not to be under liquidation or bankruptcy
Key insights about MADHYA PRADESH tender market
Bidders must confirm 3 years govt/PSU supply experience, provide OEM authorization if applicable, and submit Detailed Design Drawings within 10 days of award. Ensure GST compliance and address the delivery site in Tekanpur, MP. Include an undertaking confirming non-liquidity and supply capability for possible 25% quantity variation.
Required documents include GST certificate, PAN, experience certificates showing 3 years of govt/PSU supply, financial statements, OEM authorization, and the Detailed Design Drawings submission. An undertaking of non-liquidity is also needed. Ensure bidder qualifies for 25% quantity variation and approved delivery terms.
Delivery starts after the original delivery order date; if drawings take time, the extension applies with the formula (Increased quantity / Original quantity) × Original delivery period, minimum 30 days. Approval delays shift delivery without LD, so timely design approval is critical.
Eligible bidders must demonstrate 3 years of regular manufacture/supply to Central or State Govt Organizations or PSUs in the same product category; provide copies of relevant contracts showing yearly quantities shipped, with primary product meeting the criterion in multi-item bids.
GST is the bidder's responsibility; reimbursement, if any, will be at actuals or applicable rates, whichever is lower, capped at the quoted GST percentage. Ensure GST compliance before submitting the bid to avoid discrepancies during evaluation.
Submission within 10 days of award is mandatory; the buyer approves or lists modifications within 10 days. Supplying goods strictly as per approved drawings is required to avoid delivery delays and potential rejection of supplies or need for rework.
Manufacturer Authorization is required when using authorized distributors or service providers; OEM authorization or explicit distributor agreements are permissible. Ensure documentation accompanies the bid to verify product provenance and compliance.
If approval is delayed, the delivery period is reset without LD for the approval period; suppliers should plan for potential schedule shifts and maintain communication with the buyer to minimize impact on delivery deadlines.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS