Bid Publish Date
07-Aug-2026, 7:35 pm
Bid End Date
24-Aug-2026, 8:00 pm
Location
Progress
The Indian Army, Department of Military Affairs, invites bids from eligible vendors for a catalogue of automotive and mechanical components including items such as timing belts, bearings, clutch assemblies, regulator assemblies, water pumps, gaskets, piston rings, and wheel hubs. The procurement is located in CHAMOLI, UTTARAKHAND (PIN 246401) and encompasses a total of 20 items within the BOQ. The contract includes an option to adjust quantity by up to 25% during or after award at contracted rates, with delivery calculated by a specific formula and a minimum 30 days extension where applicable. A mandatory ISO 9001 certification and pre-approval of advance samples are required.
ISO 9001 certified bidder or OEM
1 year Govt/PSU supply experience in similar category
Pre-dispatch and post-receipt inspection options
Advance sample approval within 5 days of award
Delivery quantity flexibility up to 25%
Delivery quantity may change by up to 25% at contract time and during currency at contracted rates.
ISO 9001 certification required; advance sample approval within 5 days of award.
Submission must include PAN, GST, cancelled cheque, EFT mandate; govt/PSU experience proof required.
Advance sample approval required; bulk supply must follow approved sample; no LD details provided in current data.
Delivery period begins from last date of original delivery order; option quantity adjustments require recalculated delivery time with minimum 30 days.
Not specified in available terms; standard govt penalties may apply per contract but not disclosed here.
1 year minimum experience in supplying similar govt/PSU category products
ISO 9001 certification (bidder or OEM)
Evidence of prior contracts with central/state govt or PSU bodies
Pan, GST, and bank EFT mandate submitted with bid
Quantity
36
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Warranty Period
1 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
COVER TIMING BELT OUTSIDE , BEARING CLUTCH RELEASE , KNUCKLE BEARING , SPIDER BEARING CROSS , JOINT ASSY UNIVERSAL , HAND BRAKE CABLE , REGULATOR ASSY FUEL PRESSURE , BONNET SHOCKER , FAN BELT , CENTER BOLT , BIG END BRG SET , ASSY LINED SHOE ASSY , WHEEL CYL ASSY RH , SPRING , CABLE SPEEDOMETER , REAR HUB BEARING , BEARING TR REAR HUB , PISTON RING SE SET OF 6 PCS , GASKET CYL HEAD , BUSH C.R
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
Chamoli
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Chamoli | Chamoli | - | - | 1 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
COVER TIMING BELT OUTSIDE
COVER TIMING BELT OUTSIDE
BEARING CLUTCH RELEASE
BEARING CLUTCH RELEASE
KNUCKLE BEARING
KNUCKLE BEARING
SPIDER BEARING CROSS
SPIDER BEARING CROSS
JOINT ASSY UNIVERSAL
JOINT ASSY UNIVERSAL
HAND BRAKE CABLE
HAND BRAKE CABLE
REGULATOR ASSY FUEL PRESSURE
REGULATOR ASSY FUEL PRESSURE
BONNET SHOCKER
BONNET SHOCKER
FAN BELT
FAN BELT
CENTER BOLT
CENTER BOLT
BIG END BRG SET
BIG END BRG SET
ASSY LINED SHOE ASSY
ASSY LINED SHOE ASSY
WHEEL CYL ASSY RH
WHEEL CYL ASSY RH
SPRING
SPRING
CABLE SPEEDOMETER
CABLE SPEEDOMETER
REAR HUB BEARING
REAR HUB BEARING
BEARING TR REAR HUB
BEARING TR REAR HUB
PISTON RING SE SET OF 6 PCS
PISTON RING SE SET OF 6 PCS
GASKET CYL HEAD
GASKET CYL HEAD
BUSH C.R
BUSH C.R
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | COVER TIMING BELT OUTSIDE | COVER TIMING BELT OUTSIDE | 1 | nos | milangem | 21 | |
| 2 | BEARING CLUTCH RELEASE | BEARING CLUTCH RELEASE | 1 | nos | milangem | 21 | |
| 3 | KNUCKLE BEARING | KNUCKLE BEARING | 2 | nos | milangem | 21 | |
| 4 | SPIDER BEARING CROSS | SPIDER BEARING CROSS | 1 | nos | milangem | 21 | |
| 5 | JOINT ASSY UNIVERSAL | JOINT ASSY UNIVERSAL | 1 | nos | milangem | 21 | |
| 6 | HAND BRAKE CABLE | HAND BRAKE CABLE | 1 | nos | milangem | 21 | |
| 7 | REGULATOR ASSY FUEL PRESSURE | REGULATOR ASSY FUEL PRESSURE | 1 | nos | milangem | 21 | |
| 8 | BONNET SHOCKER | BONNET SHOCKER | 2 | nos | milangem | 21 | |
| 9 | FAN BELT | FAN BELT | 1 | nos | milangem | 21 | |
| 10 | CENTER BOLT | CENTER BOLT | 5 | nos | milangem | 21 | |
| 11 | BIG END BRG SET | BIG END BRG SET | 1 | nos | milangem | 21 | |
| 12 | ASSY LINED SHOE ASSY | ASSY LINED SHOE ASSY | 2 | nos | milangem | 21 | |
| 13 | WHEEL CYL ASSY RH | WHEEL CYL ASSY RH | 1 | nos | milangem | 21 | |
| 14 | SPRING | SPRING | 4 | nos | milangem | 21 | |
| 15 | CABLE SPEEDOMETER | CABLE SPEEDOMETER | 1 | nos | milangem | 21 | |
| 16 | REAR HUB BEARING | REAR HUB BEARING | 2 | nos | milangem | 21 | |
| 17 | BEARING TR REAR HUB | BEARING TR REAR HUB | 1 | nos | milangem | 21 | |
| 18 | PISTON RING SE SET OF 6 PCS | PISTON RING SE SET OF 6 PCS | 1 | nos | milangem | 21 | |
| 19 | GASKET CYL HEAD | GASKET CYL HEAD | 1 | nos | milangem | 21 | |
| 20 | BUSH C.R | BUSH C.R | 6 | nos | milangem | 21 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
ISO 9001 certification ( bidder or OEM )
Evidence of experience: contracts with govt/PSU for 1 year prior to bid opening
Advance sample submission within 5 days of award
Key insights about UTTARAKHAND tender market
Bidders must meet eligibility: 1 year Govt/PSU supply experience, ISO 9001 certification, and submit PAN, GST, cancelled cheque, and EFT mandate. Provide contracts showing quantity supplied yearly and ensure advance sample is approved within 5 days of award before bulk production.
Submit PAN, GSTIN, cancelled cheque, EFT mandate; demonstrate ISO 9001; provide evidence of 1 year govt/PSU experience with relevant contracts; include advance sample submission within 5 days of award and supporting OEM authorizations if applicable.
The purchaser may increase or decrease quantity up to 25% at contract formation and during currency. Delivery time is recalculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
Nominated Inspection Agencies conduct either pre-dispatch inspection at seller premises or post-receipt inspection at the consignee site, depending on ATC selections; officer commanding or board of officer oversee acceptance testing.
Mandatory ISO 9001 certification for bidder or OEM; no other specific standards are detailed in the available data; ensure all supplied items meet govt procurement quality expectations.
The successful bidder must submit advance samples within 5 days of award; buyer will approve or specify modifications within 5 days; any delay on the buyer side may extend the delivery period without LD.
BOQ lists 20 items including timing belts, bearings, clutch components, regulator assemblies, bonnet shocks, fuel-related parts, gaskets, piston rings, and related mechanical assemblies; exact quantities are not disclosed in the data.
In bunch bids, the primary product with the highest value must meet the supplier experience criterion (1 year Govt/PSU) and demonstrate related contract histories for similar items.