State Bank Of India Gold Purity Testing Meter Tender Coimbatore Tamil Nadu 2025 ISO/IS Standards
State Bank Of India (sbi)
COIMBATORE, TAMIL NADU
Bid Publish Date
05-Nov-2025, 4:40 pm
Bid End Date
10-Nov-2025, 5:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: State Bank of India (SBI) under the Department of Financial Services. Product: Gold purity testing meter / karat meter. Location: not specified. Estimated value and EMD: not disclosed; EMD specified at 0.5% of bid value via DD/FD; performance security 10% of bid value. Key differentiator: ATC requires OEM site visit, AERB certificate in OEM name, and MÂF authorization upload. Context: SBI seeks a compliant gold assaying solution with in-country OEM support, installation, and post-award compliance. Unique clause: option to increase/decrease quantity up to 25% during the contract with corresponding delivery-time adjustments.
Gold purity testing meter / karat meter
EMD: 0.5% of bid value via DD/FD
Performance security: 10% of bid value
In-country OEM with ISI/IEC/BIS-like compliance not specified but AERB-linked
25% quantity variation rights during/after contract
EMD must be submitted as DD/FD for 0.5% of bid value
Site visit mandatory; certificate to be attached in ATC
OEM authorization (MAF) required; in-country OEM
Performance security 10% of bid value after award
Option clause permits ±25% quantity variation
EMD DD/FD for 0.5% of bid value; subsequent payment as per contract terms; hard copy submission before bid closing
Delivery period linked to option clause; additional time equals (increased quantity / original quantity) × original delivery period with minimum 30 days
Not explicitly defined in provided data; penalties may apply per standard procurement terms
Indian OEM requirement with AERB certificate in OEM name
Site visit clearance certificate from buyer
MAF authorization and past performance proof
DD/FD for 0.5% bid value for EMD
Performance security 10% of bid value post-award
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
State Bank Of India (sbi)
COIMBATORE, TAMIL NADU
State Bank Of India (sbi)
COIMBATORE, TAMIL NADU
State Bank Of India (sbi)
COIMBATORE, TAMIL NADU
Punjab National Bank (pnb)
BANGALORE, KARNATAKA
Bank Of India
DHARWARD, KARNATAKA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
OEM authorization certificate (MAF) upload with ATC
AERB certificate in OEM name
Site visit certificate (obtained from buyer) to be attached
Past performance order copies as proof
EMD DD/FD for 0.5% of bid value; submit in hard copy
Proof of delivery capability and installation capacity
Key insights about MADHYA PRADESH tender market
To bid, secure in-country OEM authorization (MAF) and AERB certificate in the OEM name, perform a site visit and obtain a site-visit certificate, attach past performance orders, and submit EMD via DD/FD for 0.5% of bid value. Include performance security of 10% post-award and ensure 25% quantity variation rights.
Submit GST, PAN, OEM authorization (MAF), AERB certificate in OEM name, site-visit certificate, past performance orders, EMD DD/FD for 0.5% of bid value, and post-award performance security of 10% of bid value; include installation capacity proof.
Delivery follows the option clause: quantity changes up to 25% during or after contract at contracted rates; additional delivery time is calculated as (increased quantity / original quantity) × original delivery period, minimum 30 days.
AERB certificate in OEM name is required; MÂF authorization; in-country OEM; while ISI/ISO/BIS standards are implied for equipment compliance but not explicitly listed in tender data.
EMD is 0.5% of the bid value, payable via Demand Draft or Fixed Deposit; must be submitted physically before bid closing along with the hard copy submission.
Site visit is mandatory before bid submission; the site-visit certificate must be uploaded with the ATC and attached to the bid file for SBI procurement.
Performance security equals 10% of the bid value, payable after award; ensure arrangements to furnish the security deposit promptly to avoid bid disqualification.
Gold purity meter installation is required across different areas; ensure OEM-based on-site support, installation readiness, and post-installation service commitments as per ATC.
Sign up now to access all documents
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS