BEL, a premier defense equipment organization under the Department of Defence Production, seeks a complete Water Purification System with UV or UV+UF process for Visakhapatnam, Andhra Pradesh. The procurement focuses on a turnkey solution including storage tank integration, water quality guarantees, mounting, and installation. The scope covers training, demonstration, and commissioning, with emphasis on standard-compliant performance and reliable output. The option clause allows quantity adjustments up to 25% during contract execution, at contracted rates.
Key Term 1: Option clause allows quantity variation up to 25% with contracted rates and adjusted delivery period.
Key Term 2: Mandatory bidder documents include PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization, and compliance sheets.
Key Term 3: Training and demonstration are required as part of installation and commissioning scope.
Not explicitly provided; bidders should refer to standard terms in contract and ATC for payment milestones and schedule.
Delivery period may extend with option clause; additional time is (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not stated here; bidders should consult Annexure-1 and contract terms for LD or penalties.
OEM Authorization certificate required
Experience with water purification systems using UV/UV+UF
Compliance with IS/IS standards as applicable to water treatment equipment and government procurement norms
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ****** Under PMA | Item Categories : Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Fil | |
| L2 | ****** Under PMA | Item Categories : Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Fil | |
| L3 | ****** Under PMA | Item Categories : Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Fil | |
| L4 | ****** Under PMA | Item Categories : Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Fil |
Quantity
2
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Features and Performance | Type of Water Purification Technology | Generally Conformity to IS 14724 for Ultraviolet (UV))+Ultrafiltration (UF) |
| Features and Performance | Rate of Flow (In LPH) of purified water | upto 100 LPH, upto 50 LPH |
| Features and Performance | Method of Mounting | Freestanding |
| Features and Performance | Input Water Source Connection | Plumber-In |
| Features and Performance | Additional Water Conditioning and Other Features | Sand Filter, Sediment Filter, Pre Carbon Filter, Post Carbon Filter, Mineral Filter, Micron Filter, Alkaline Filter, Flushing Mechanism, Reject Water Control Mechanism, Mineraliser/Taste Enhancer Media, Activated Carbon Media, Normal Water Dispensing, Cold Water Dispensing, Hot Water Dispensing |
| Features and Performance | Guaranteed output water quality | As per IS 10500 or better |
| Water Storage | Storage Tank (inclusive in the scope of supply) | Self Contained Water Cooler |
| Water Storage | Type of Water Tank / Location | Self Contained Water Cooler |
| Water Storage | Storage Tank Material | Self Contained Water Cooler |
| Water Storage | Storage Tank Capacity (in Ltr) | Self Contained Water Cooler |
| Water Storage | Self Contained Water Cooler | Self Contained Water Cooler as per IS 1475 (ISI Marked) of cooling capacity - 20 LPH at Rated conditions and Storage Capacity 40 Liters (I,e 20/40 water cooler.), Self Contained Water Cooler as per IS 1475 (ISI Marked) of cooling capacity - 40 LPH at Rated conditions and Storage Capacity 40 Liters (I,e 40/40 water cooler.), Self Contained Water Cooler as per IS 1475 (ISI Marked) of cooling capacity - 40 LPH at Rated conditions and Storage Capacity 150 Liters (I,e 40/150 water cooler.), Self Contained Water Cooler as per IS 1475 (ISI Marked) of cooling capacity - 60 LPH at Rated conditions and Storage Capacity 80 Liters (I,e 60/80 water cooler.), Self Contained Water Cooler as per IS 1475 (ISI Marked) of cooling capacity - 60 LPH at Rated conditions and Storage Capacity 120 Liters (I,e 60/120 water cooler.), Self Contained Water Cooler as per IS 1475 (ISI Marked) of cooling capacity - 150 LPH at Rated conditions and Storage Capacity 150 Liters (I,e 150/150 water cooler.) |
| Service, Warranty, Installation and Commissioning | Training and Demonstration | The installation and demonstration of the machine at the consignee place shall be carried out as part of installation and commissioning |
Key insights about ANDHRA PRADESH tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization, and compliance sheet per ATC. Annexure-2 and acceptance on Rs 100 stamp paper must be signed. Ensure alignment with Annexure-1 specifications for UV/UV+UF systems and training provisions.
Submit PAN, GSTIN, cancelled cheque, EFT Mandate certified by bank, OEM authorization, compliance sheet, Annexure-2 (declaration on standard terms), and acceptance of terms; ensure vendor code creation documents per T&C 2 and 3.
System must support UV or UV+UF purification with guaranteed output water quality; include water storage tank with specified capacity, mounting method, input water connection, and on-site training; details to be provided in Annexure-1 and Annexure-2.
Delivery period is flexible under the option clause: additional time equals (increased quantity/original quantity) × original period, with a minimum of 30 days; the base delivery date begins after the last delivery order date.
OEMs must provide valid authorization, demonstrate experience in water purification projects, and furnish compliance with standard procurement terms; ensure capability for training, installation, and ongoing maintenance as per annexed terms.
Vendor must deliver on-site training and product demonstration to end-users, followed by commissioning and acceptance testing as part of installation; documentation and handover will be completed after successful demonstration.