Bharat Petroleum Corporation Ltd Pure Condensate DM Water Exchanger Tender Mumbai Maharashtra 2026

Bid Publish Date

19-Sep-2026, 1:50 pm

Bid End Date

21-Oct-2026, 2:00 pm

EMD

₹8,06,188

Generate Docs

Progress

Issue19-Sep-2026, 1:50 pm
Corrigendum13-Oct-2026
AwardPending

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for a range of equipment primarily comprising PURE CONDENSATE DM WATER EXCHANGERS, suspect condensate DM water exchangers, FUEL GAS HEATER, BLOWDOWN COOLER, LOW TEMP BLOWDOWN VAPORISER, MAIN COLUMN BOTTOMS EXCHANGERS, and various condensers and coolers across the refinery process train in Mumbai, Maharashtra. The procurement scope includes a 27-item BoQ with an estimated contract value not disclosed publicly; the tender requires a detailed price break-up format on the GeM portal. An EMD of ₹806,188 applies. The bid includes an option clause allowing up to 25% quantity variation during contract and extended delivery periods with a minimum 30-day extension, commencing from the last date of the original delivery order. The tender emphasizes compliance with portal-specific ATC, password-protected technical MR access, and Secrecy Declaration obligations for bidders.

Technical Specifications & Requirements

  • EMD: ₹806,188 (electronic deposit) and associated GeM submission validations.
  • Quantity variation: up to 25% increase/decrease at contract award and during currency; minimum delivery extension of 30 days.
  • Delivery terms: extension calculations based on (Increased quantity ÷ Original quantity) × Original delivery period; subject to a maximum of the original delivery period.
  • GeM portal requirements: price break-up format must be uploaded; unpriced bids must not contain price data; confidential MR access via Secrecy Declaration with EPCM; password sharing restricted.
  • BOQ: 27 items listed; item-wise details not disclosed in public data; cross-reference to NIT and SPC/GPC terms for item-level technicals.
  • Standards/Compliance: Not specified within available data; bidders must conform to tender terms and GeM ATC documents.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may adjust quantities by up to 25% and extend delivery time accordingly; minimum additional time is 30 days.
  • Confl ict resolution: In case of discrepancies between GeM portal and tender documents, tender terms prevail.
  • Document uploads: Mandatory price break-up in prescribed format; priced bid separate from unpriced bid; documents under buyer-added ATC & Spec docs are binding.
  • Secrecy: Access to confidential technical documents requires a signed Secrecy Declaration; password to be shared only with compliant bidders.
  • Delivery/Payment: No explicit payment terms provided; contract terms and delivery timelines tied to original and extended orders as per option clause.
  • Compliance: All bidders must comply with GeM portal ATC terms and EPCM confidentiality requirements; non-compliance may lead to rejection.

Key Specifications

    • Product/service names: PURE CONDENSATE DM WATER EXCHANGER, SUSPECT CONDENSATE DM WATER EXCHANGER, FUEL GAS HEATER, BLOWDOWN COOLER, LOW TEMP BLOWDOWN VAPORISER, LOW TEMPERATURE BLOWDOWN SUPERHEATER, C3 C4 LOW TEMP BLOWDOWN VAPORISER, C3 C4 LOW TEMP BLOWDOWN SUPERHEATER, 20 WT CAUSTIC SOLUTION COOLER, MAIN COLUMN BOTTOMS PRODUCT-RAW OIL EXCHANGERS, MAIN COLUMN BOTTOMS STEAM GENERATORS, CIRCULATING MAIN COLUMN BOTTOMS-RAW OIL EXCHANGER, LIGHT CYCLE OIL PRODUCT COOLER, MAIN COLUMN TRIM CONDENSER, INTERSTAGE COOLERS, HIGH PRESSURE TRIM CONDENser, PRIMARY ABSORBER UPPER INTERCOOLER, PRIMARY ABSORBER LOWER INTERCOOLER, SPONGE ABSORBER, LEAN OIL TRIM COOLER, LEAN GAS COOLER, DEBUTANIZER BOTTOMS COOLER, DEBUTANIZER REBOILERS, DEBUTANIZER TRIM CONDENSER, DEBUTANIZER NET OVERHEAD COOLER, HEAVY GASOLINE PRODUCT COOLER, GASOLINE PRODUCT COOLER.
    • Quantities/Capacities: Not disclosed in public data; 27 BOQ items exist; values to be derived from NIT/SPC documents.
    • EMD/Estimated value: EMD ₹806,188; estimated contract value not published.
    • Experience: Not specified in public data; refer to BPCL tender terms and EPCM/OEM requirements.
    • Quality/Standards: No explicit standard numbers provided in data; bidders must rely on GeM ATC and project-specific requirements.

Terms & Conditions

  • Key Term 1: Up to 25% quantity variation allowed with corresponding delivery extension, minimum 30 days.

  • Key Term 2: Mandatory price break-up upload; separate priced bid; avoid disclosing prices in unpriced bid.

  • Key Term 3: Secrecy Declaration required for technical documents; EPCM confidentiality and password access controls.

Important Clauses

Payment Terms

Not publicly specified; payment terms governed by GeM portal ATC and contract terms; price break-up must be submitted in the price bid section.

Delivery Schedule

Delivery period linked to initial delivery order; extended period calculations use (increased quantity/original quantity) × original delivery period; minimum 30 days extension.

Penalties/Liquidated Damages

Not disclosed in available data; penalties to be defined in tender documents under NIT/SPC/GPC terms.

Bidder Eligibility

  • Registered BPCL supplier or authorized bidder with relevant refinery equipment experience

  • Demonstrated capability in supplying condensate DM water exchangers and associated process equipment

  • Financial capacity to mobilize EMD and complete performance under contract terms

Advertisement

Tender Data

Bid Details

Quantity

82

Category

PURE CONDENSATE DM WATER EXCHANGER

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

PURE CONDENSATE DM WATER EXCHANGER , SUSPECT CONDENSATE DM WATER EXCHANGER , FUEL GAS HEATER , BLOWDOWN COOLER , LOW TEMP BLOWDOWN VAPORISER , LOW TEMPERATURE BLOWDOWN SUPERHEATER , C3 C4 LOW TEMP BLOWDOWN VAPORISER , C3 C4 LOW TEMP BLOWDOWN SUPERHEATER , 20 WT CAUSTIC SOLUTION COOLER , MAIN COLUMN BOTTOMS PRODUCT-RAW OIL EXCHANGERS , MAIN COLUMN BOTTOMS STEAM GENERATORS , CIRCULATING MAIN COLUMN BOTTOMS-RAW OIL EXCHANGER , LIGHT CYCLE OIL PRODUCT COOLER , MAIN COLUMN TRIM CONDENSER , COMPRESSOR INTERSTAGE COOLERS , HIGH PRESSURE TRIM CONDENSER , PRIMARY ABSORBER UPPER INTERCOOLER , PRIMARY ABSORBER LOWER INTERCOOLER , SPONGE ABSORBER LEAN OIL TRIM COOLER , LEAN GAS COOLER , DEBUTANIZER BOTTOMS COOLER , DEBUTANIZER REBOILERS , DEBUTANIZER TRIM CONDENSER , DEBUTANIZER NET OVERHEAD COOLER , HEAVY GASOLINE PRODUCT COOLER , GASOLINE PRODUCT COOLER

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

24

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

24-09-2026 15:00:00

Pre-Bid Venue

Technip Energies India Limited, A - 4, Institutional Area, Block A, Sector 1,Noida, Uttar Pradesh 201301 Online: Preferably Via MS Teams Meeting.

Delivery Details

Max Delivery Days

365

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400074

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vikram Ramkumar Gupta400074,BPCL Mumbai Refinery, Admin building, South block, Second floor, CPO RPP, Mahul, Mumbai - 400074Mumbai SuburbanMaharashtra4000741365-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9889076.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Projects Procurement Mr Mumbai

Grievance Contact

[email protected]

Corrigendum Updates

5 Updates
#1

Update

13-Oct-2026
#2

Update

09-Oct-2026
#3

Update

09-Oct-2026

Extended Deadline

21-Oct-2026, 8:30 am

Opening Date

22-Oct-2026, 8:30 am

#4

Update

06-Oct-2026
#5

Update

06-Oct-2026

Extended Deadline

13-Oct-2026, 8:30 am

Opening Date

14-Oct-2026, 8:30 am

Advertisement

Bill of Quantities (BOQ) 27 Items Sign in for GEM prices

#1

PURE CONDENSATE DM WATER EXCHANGER

As per MR

1 no Delivery: 365 days
#2

SUSPECT CONDENSATE DM WATER EXCHANGER

As per MR

1 no Delivery: 365 days
#3

FUEL GAS HEATER

As per MR

1 no Delivery: 365 days
#4

BLOWDOWN COOLER

As per MR

2 nos Delivery: 365 days
#5

LOW TEMP BLOWDOWN VAPORISER

As per MR

1 no Delivery: 365 days
#6

LOW TEMPERATURE BLOWDOWN SUPERHEATER

As per MR

1 no Delivery: 365 days
#7

C3 C4 LOW TEMP BLOWDOWN VAPORISER

As per MR

1 no Delivery: 365 days
#8

C3 C4 LOW TEMP BLOWDOWN SUPERHEATER

As per MR

1 no Delivery: 365 days
#9

20 WT CAUSTIC SOLUTION COOLER

As per MR

1 no Delivery: 365 days
#10

MAIN COLUMN BOTTOMS PRODUCT-RAW OIL EXCHANGERS

As per MR

4 nos Delivery: 365 days
#11

MAIN COLUMN BOTTOMS STEAM GENERATORS

As per MR

2 nos Delivery: 365 days
#12

CIRCULATING MAIN COLUMN BOTTOMS-RAW OIL EXCHANGER

As per MR

4 nos Delivery: 365 days
#13

LIGHT CYCLE OIL PRODUCT COOLER

As per MR

2 nos Delivery: 365 days
#14

LIGHT CYCLE OIL PRODUCT COOLER

As per MR

2 nos Delivery: 365 days
#15

MAIN COLUMN TRIM CONDENSER

As per MR

10 nos Delivery: 365 days
#16

COMPRESSOR INTERSTAGE COOLERS

As per MR

8 nos Delivery: 365 days
#17

HIGH PRESSURE TRIM CONDENSER

As per MR

10 nos Delivery: 365 days
#18

PRIMARY ABSORBER UPPER INTERCOOLER

As per MR

2 nos Delivery: 365 days
#19

PRIMARY ABSORBER LOWER INTERCOOLER

As per MR

2 nos Delivery: 365 days
#20

SPONGE ABSORBER LEAN OIL TRIM COOLER

As per MR

2 nos Delivery: 365 days
#21

LEAN GAS COOLER

As per MR

2 nos Delivery: 365 days
#22

DEBUTANIZER BOTTOMS COOLER

As per MR

2 nos Delivery: 365 days
#23

DEBUTANIZER REBOILERS

As per MR

2 nos Delivery: 365 days
#24

DEBUTANIZER TRIM CONDENSER

As per MR

12 nos Delivery: 365 days
#25

DEBUTANIZER NET OVERHEAD COOLER

As per MR

2 nos Delivery: 365 days
#26

HEAVY GASOLINE PRODUCT COOLER

As per MR

2 nos Delivery: 365 days
#27

GASOLINE PRODUCT COOLER

As per MR

2 nos Delivery: 365 days

Categories 18

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar condensate DM water exchanger projects

4

Financial statements and stability documents

5

EMD submission proof (₹806,188) as allowed by GeM portal

6

Technical bid documents aligned with NIT/SPC/GPC

7

OEM authorizations (if applicable)

8

Secrecy Declaration form for EPCM access

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid in BPCL tender for condensate exchangers in Mumbai 2026?

Bidders must register on GeM, upload a detailed price break-up in the prescribed format, provide an EMD of ₹806,188, and submit all required documents (GST, PAN, experience certificates, financials). Follow Secrecy Declaration and EPCM access procedures to view confidential MR documents.

What documents are required for Mumbai BPCL tender submission?

Required documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD proof (₹806,188), technical bid aligned with NIT/SPC/GPC, OEM authorizations if applicable, and Secrecy Declaration compliance for confidential materials.

What delivery terms apply to BPCL tender in Mumbai?

Delivery terms allow up to 25% quantity variation with a minimum 30-day extension, calculated as (increased quantity/original quantity) × original delivery period. The extension starts from the last date of the original delivery order and may extend to the full contracted period.

Which standards or certifications are required for BPCL refinery equipment?

Public data does not specify exact standards; bidders must comply with GeM ATC requirements, EPCM confidentiality, and project-specific SPC/NIT terms. Verify ISI/ISO certifications if referenced in updated tender documents.

What is the EMD amount for BPCL Mumbai tender?

The EMD amount is ₹806,188. Bid submissions must include an EMD as per GeM portal guidelines; ensure payment proof is attached in the bid package and referenced in the technical bid.

When is the bid submission deadline for BPCL Mumbai tender 2026?

Exact submission deadlines are not provided in public data; bidders should monitor GeM tender updates and BPCL NIT/SPC documents for the precise cut-off date and time, plus any password-protected access windows for technical MR.

What is the process to access confidential technical documents for BPCL tender?

Bidders must execute a Secrecy Declaration with EPCM; password access is granted only after compliance checks. Passwords must not be shared; access is limited to authorized signatories and must align with the tender's confidentiality terms.

Advertisement