COPPER WIRE 15 SQ MM,COPPER WIRE 075 SQ MM,HOLDER,BULB,CHANGER OVER S 100 AMP,CHANGER OVER S 200 AM
Indian Army
Bid Publish Date
21-Nov-2025, 12:38 pm
Bid End Date
01-Dec-2025, 6:00 pm
Bid Opening Date
01-Dec-2025, 6:30 pm
Location
Progress
Quantity
44
Category
Fabrication of Cade
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) seeks to procure a range of electrical and fabrication items, including 12A Battery, Copper Wire 1.5mm, LED Panel, LED Lamp, Welding Machine Wire, and Fabrication of Cade. The BOQ comprises 6 total items with delivery to an undisclosed location in India. The buyer’s terms grant a 25% quantity variation during contract execution at contracted rates and allow extension of delivery time proportionally, with a minimum extension of 30 days. Bidders must ensure GST compliance and bid with standard documentation as per buyer ATC clauses. The procurement emphasizes timely delivery, compliance with buyer technical specifications, and post-award replacement/defect handling.
• 12A Battery
• Copper Wire 1.5mm
• LED Panel
• LED Lamp
• Welding Machine Wire
• Fabrication of Cade
Must not be suspended by GeM in the recent year
Must provide PAN, GSTIN, and EFT mandate
Must have Experience Certificates and Past Performance Certificates
Indian Army
Indian Army
EAST SIKKIM, SIKKIM
Indian Army
JODHPUR, RAJASTHAN
Indian Army
DARJEELING, WEST BENGAL
Navodaya Vidyalaya Samiti
GADCHIROLI, MAHARASHTRA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 12A Battery | 12A Battery | 3 | nos | acct123456 | 15 |
| 2 | Copper Wire 1.5mm | Copper Wire 1.5mm | 1 | roll | acct123456 | 15 |
| 3 | LED Pannel | LED Pannel | 10 | nos | acct123456 | 15 |
| 4 | LED Lamp | LED Lamp | 6 | nos | acct123456 | 15 |
| 5 | Welding Machine Wire | Welding Machine Wire | 20 | mtr | acct123456 | 15 |
| 6 | Fabrication of Cade | Fabrication of Cade | 4 | nos | acct123456 | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN Card
Experience certificates
Financial statements / Turnover certificate
Past performance certificate
Vendor suspension status
Aadhar Card
Cancelled cheque
EFT Mandate
Confidentiality and Self Life certificates
ATC Certification/Declaration
Bid Security Declaration (if required by ATC)
Key insights about ARUNACHAL PRADESH tender market
To bid, compile PAN, GST certificate, and EFT mandate; attach Experience certificates and Past performance; provide confidentiality/self life certificates and ATC declarations. Ensure delivery timelines align with the 25% quantity option and GST terms. Submit all documents as per buyer ATC.
Required documents include PAN, GST No with certificate, Aadhar, Cancelled cheque, EFT Mandate, Experience certificates, Turnover certificates, Past performance, and Vendor status. Include confidentiality and ATC certifications; ensure replacement policy details are clear for defective items.
Delivery terms specify timelines per original order with extension via the 25% quantity option. Additional time is calculated as (increased quantity ÷ original quantity) × original period, minimum 30 days. Items must reach purchaser location in usable condition; replacements for defects are required as per ATC.
Bidder must determine applicable GST; reimbursement will be at actuals or applicable rates, whichever is lower, capped to the quoted GST percentage. Ensure GSTIN validity and proper invoicing aligned with purchaser’s GST treatment for final payment.
ATC requires compliance with specified certifications listed in the ATC docs (PAN, GST, EFT mandate). While no IS/ISO codes are explicitly stated in the data, bidders should verify and attach any organization-specific certifications requested in the ATC to avoid disqualification.
The BOQ comprises 6 total items including 12A Battery, Copper Wire 1.5mm, LED Panel, LED Lamp, Welding Machine Wire, and Fabrication of Cade. Exact quantities are not provided in the data; confirm during bid submission and align with delivery capabilities.
ATC specifies that defective items will not be accepted and replacement charges may be payable by the seller. Ensure internal QA checks and ready replacement logistics; document warranty and defect resolution terms clearly in the bid to avoid post-award disputes.
The 25% quantity variation can affect price, delivery schedules, and inventory planning. Bidders should price flexible scenarios, confirm lead times under extended quantities, and ensure a robust supply chain to meet potential fluctuations without compromising quality or timelines.
Indian Army
📍 RAJAURI, JAMMU & KASHMIR
Indian Army
📍 Rangareddi, TELANGANA
Power Grid Corporation Of India Limited
📍 GURGAON, HARYANA
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS