Progress
The opportunity is issued by the Indian Air Force, operating under the Department of Military Affairs. The procurement category is TENSIONOMETER, with no BOQ items or explicit technical specifications published. The tender lacks start/end dates and an estimated value in the available data, and no EMD amount is shown. The ATC document referenced by the buyer should be reviewed for completeness, terms, and any special conditions. A firm must verify the exact product scope, delivery location, and eligibility criteria from the ATC to proceed. The absence of quantified quantities and delivery timelines requires bidders to obtain clarification before bid submission. The tender context suggests a compliance-driven procurement with potential quality or calibration standards implied by a tensionometer requirement.
Product/service: TENSIONOMETER (no model/brand specified in data)
Estimated value: Not published; verify in ATC
Standards/Compliance: Not specified; confirm calibration/accuracy standards in ATC
Delivery location: Not disclosed; obtain from ATC
Warranty/AMC: Not disclosed; confirm via ATC
EMD amount and payment terms not disclosed; confirm in ATC
Delivery schedule and location to be clarified in ATC
Technical specifications and calibration standards to be obtained from ATC
Terms are not published; bidders must verify payment schedule and milestones in the ATC
Delivery timelines to be clarified in ATC; confirm lead times and installation requirements
Penalty details and LD rates will be specified in ATC; bidders should await exact figures
Must submit GST registration and PAN details
Experience in supplying or calibrating tension measuring instruments
Financial capability evidenced by turnover in line with ATC (to be confirmed)
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TENSIOMETER
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Jorhat
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Jorhat | Jorhat | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates in similar equipment procurement
Financial statements or turnover proof
EMD payment receipt or exemption proof
Technical bid documents as per ATC
OEM authorization or dealership certificate (if required by ATC)
Key insights about ASSAM tender market
Bidders should first obtain and review the ATC document from the Indian Air Force procurement portal. Verify required documents (GST, PAN, experience), EMD amount, and submission deadlines. Ensure compliance with any calibration or standard requirements specified in the ATC before bid submission.
Submit GST registration, PAN card, and experience certificates for similar equipment. Include financial statements, EMD details, technical bid documents, and OEM authorizations if mandated by the ATC. Ensure all documents align with the exact ATC checklist.
No explicit specifications are published in the available data. The ATC must be consulted to confirm model, calibration accuracy class, measurement range, and traceability. Vendors should wait for ATC details before finalizing technical bids.
Date details are not published here. Bidders must refer to the ATC and the procurement portal for the exact deadline, as the tender does not display start/end dates in the available information.
EMD specifics are not provided in the public data. Check the ATC for the exact EMD amount, acceptable payment method (DD/online), and any exemptions. Ensure the EMD is valid through the bid submission and evaluation period.
Delivery terms are not disclosed in the current data. The ATC will define delivery location, lead time, installation requirements, and any penalties for late delivery; bidders should await ATC guidance before submission.
Refer to the ATC for OEM authorization requirements and calibration standards. If OEM-specific credibility is required, ensure authorization letters are current and demonstrate calibration traceability to recognized standards prior to bid submission.