TenderDekho Logo
Closed GEM

Indian Army Fuel & Engine Spare Parts Tender DODA Jammu & Kashmir 2026 – 26 items including Fuel Filter/Oil Filter/Exhaust Gasket Set, ISI standards

Bid Publish Date

11-Aug-2026, 10:30 pm

Bid End Date

22-Aug-2026, 9:00 am

Progress

Issue11-Aug-2026, 10:30 pm
Technical15-08-2026 20:15:12
Financial
AwardCompleted

Tender Overview

The Indian Army invites bids for a broad range of mechanical spares in DODA, Jammu & Kashmir covering categories such as Fuel Filter, Oil Filter Element, Exhaust Gasket Set, Exhaust Stud, Fan Belt, Fuel Pipe, Oil Pressure Gauge, Inlet Manifold Hose, Piston Ring Set, Oil Pump Assembly, Governor Weight, Rocker Arm, AVR, Valve Spring, Crank Shaft Gear, and numerous related components. The BOQ lists 26 items with no explicit quantity or unit details disclosed in the provided data. Scope includes Supply, Installation, Testing and Commissioning of the Goods. The procurement uses a formal ATC with a right to adjust quantities by up to ±25% during or after award, and the delivery period rules reference the original and extended windows. Bidders must comply with the ATC terms and submit standard corporate documentation including PAN, GSTIN, and ** EFT Mandate**.

Key differentiators include the option Clause, mandatory financial turnover verification, and the requirement to provide audited or CA-certified turnover details for the last three financial years. The tender emphasizes a vendor-code creation process and enforces compliance with the buyer-specified terms. This procurement represents a wide-spread maintenance/upgrade opportunity for Indian Army equipment spares in the northern theater.

Technical Specifications & Requirements

  • Product categories: Fuel Filters, Oil Filters, Exhaust Gasket Sets, Belts, Pipes, Gauges, and associated engine/spares.
  • BOQ scope: 26 items; exact quantities not disclosed in the data; payment scope includes Supply, Installation, Testing, and Commissioning (SITC).
  • Standards/ certifications: Not specified in the provided data; ATC implies compliance with organization’s internal terms.
  • Delivery/ installation: Delivery period rules exist with option to increase quantity up to 25%, and extended delivery timelines, minimum 30 days, based on original delivery period.
  • Financials: No Estimated Value or EMD data provided; turnover criterion requires minimum average annual turnover for the last three years as per bid document.
  • Documentation: PAN, GSTIN,Cancelled Cheque, EFT Mandate; vendor code creation required.

Terms, Conditions & Eligibility

  • EMD/ security: Not specified in the data; ATC grants option to increase quantity by up to 25% and extend delivery period accordingly.
  • Turnover: Minimum average annual turnover over the last 3 financial years must be demonstrated via audited balance sheets or CA certificates.
  • Delivery: Original delivery period with extension rules; additional time formula: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days.
  • Documents: Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate; vendor-code creation documentation required.
  • Qualification: Bidders must meet ATC and provide turnover evidence; no explicit minimum years of experience are listed in the provided data.
  • Scope: Bid price must include all cost components for SITC of goods.

Key Specifications

  • Product/Service: Fuel Filter, Oil Filter Element, Exhaust Gasket Set, Exhaust Stud, Fan Belt, Fuel Pipe, Fuel Pipe Tank to Filter, Amp Meter, Volt Meter, Oil Pressure Gauge, Inlet Manifold Hose with Clamp, Push Tube Oil Seal, Head Gasket, Piston Ring Set, Anabond Tube, Piston Assembly Std, Oil Pump Assembly, Governor Weight, Rocker Arm, HP Line, AVR, Valve Spring, Crank Shaft Gear, Fuel Feed Pump, Fuel Pump Assembly, Cam Gear

  • Quantity/Value: 26 items listed; exact quantities not disclosed in available data

  • Delivery/Scope: SITC (Supply, Installation, Testing and Commissioning)

  • Standards/Compliance: Not specified in provided data

  • Documentation: PAN, GSTIN, EFT Mandate; turnover evidence for last 3 years

  • ATC parameters: Quantity variation up to 25% during contract; delivery extension rules with minimum 30 days

Terms & Conditions

  • Option clause allows ±25% quantity variation and corresponding delivery extension

  • SITC scope included; bidder must include all cost components in bid price

  • Turnover evidence required for last 3 financial years; audited or CA certificate

Important Clauses

Payment Terms

Not specified in provided data; payment terms to be as per buyer ATC and contract award

Delivery Schedule

Delivery period governed by original date; extension via option clause; additional time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in provided data; penalties, if any, to be defined in ATC/contract

Bidder Eligibility

  • Must meet turnover criteria for last 3 financial years with audited/certified evidence

  • Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate

  • Provide vendor-code creation documents as per Buyer Added ATC

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
AADI SHAKTI SALES   Under PMA
-15-08-2026 20:15:12
2
Kadam Karan Automobiles   Under PMA
-17-08-2026 18:33:17
3
SSTRADING   Under PMA
-15-08-2026 19:48:55

Financial Results

Rank Seller Price Item
L1
SSTRADING(MSE)( MSE Social Category:SC )    Under PMA
Item Categories : Fuel Filter,Oil Filter Element,Exhaust Gasket Set Complete,Exhaust Stud,Fan Belt,Fuel Pipe,Fuel Pip
L2
AADI SHAKTI SALES (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Fuel Filter,Oil Filter Element,Exhaust Gasket Set Complete,Exhaust Stud,Fan Belt,Fuel Pipe,Fuel Pip
L3
Kadam Karan Automobiles (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Fuel Filter,Oil Filter Element,Exhaust Gasket Set Complete,Exhaust Stud,Fan Belt,Fuel Pipe,Fuel Pip

Tender Data

Bid Details

Quantity

45

Category

Fuel Filter

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Fuel Filter , Oil Filter Element , Exhaust Gasket Set Complete , Exhaust Stud , Fan Belt , Fuel Pipe , Fuel Pipe Tank to Filter , Amp Meter , Volt Meter , Oil Pressure Gauge , Inlet Manifold Hose with Clamp , Push Tube Oil Seal , Head Gasket , Piston Ring Set , Anabond Tube , Piston Assy Std , Oil Pump Assy , Governor Weight , Rocker Arm , HP Line , AVR , Valve Spring , Crank Shaft Gear , Fuel Feed Pump , Fuel Pump Assy , Cam Gear

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Doda

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DodaDoda--190-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9742789.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 26 Items Sign in for GEM prices

#1

Fuel Filter

Fuel Filter

1 nos Delivery: 90 days
#2

Oil Filter Element

Oil Filter Element

1 nos Delivery: 90 days
#3

Exhaust Gasket Set Complete

Exhaust Gasket Set Complete

1 set Delivery: 90 days
#4

Exhaust Stud

Exhaust Stud

4 nos Delivery: 90 days
#5

Fan Belt

Fan Belt

1 nos Delivery: 90 days
#6

Fuel Pipe

Fuel Pipe

2 nos Delivery: 90 days
#7

Fuel Pipe Tank to Filter

Fuel Pipe Tank to Filter

1 nos Delivery: 90 days
#8

Amp Meter

Amp Meter

1 nos Delivery: 90 days
#9

Volt Meter

Volt Meter

1 nos Delivery: 90 days
#10

Oil Pressure Gauge

Oil Pressure Gauge

1 nos Delivery: 90 days
#11

Inlet Manifold Hose with Clamp

Inlet Manifold Hose with Clamp

2 nos Delivery: 90 days
#12

Push Tube Oil Seal

Push Tube Oil Seal

8 nos Delivery: 90 days
#13

Head Gasket

Head Gasket

2 nos Delivery: 90 days
#14

Piston Ring Set

Piston Ring Set

1 nos Delivery: 90 days
#15

Anabond Tube

Anabond Tube

1 nos Delivery: 90 days
#16

Piston Assy Std

Piston Assy Std

1 nos Delivery: 90 days
#17

Oil Pump Assy

Oil Pump Assy

1 nos Delivery: 90 days
#18

Governor Weight

Governor Weight

1 nos Delivery: 90 days
#19

Rocker Arm

Rocker Arm

2 nos Delivery: 90 days
#20

HP Line

HP Line

2 nos Delivery: 90 days
#21

AVR

AVR

1 nos Delivery: 90 days
#22

Valve Spring

Valve Spring

4 nos Delivery: 90 days
#23

Crank Shaft Gear

Crank Shaft Gear

1 nos Delivery: 90 days
#24

Fuel Feed Pump

Fuel Feed Pump

1 nos Delivery: 90 days
#25

Fuel Pump Assy

Fuel Pump Assy

2 nos Delivery: 90 days
#26

Cam Gear

Cam Gear

1 nos Delivery: 90 days

Categories 42

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque

4

EFT Mandate certified by Bank

5

Audited Balance Sheets or CA/CMA turnover certificate for last 3 financial years

6

Technical bid documents demonstrating compliance with SITC scope

7

OEM authorization (if applicable)

8

Vendor code creation documents as per ATC

9

Any other documents specified in Buyer Added ATC

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for DODA Jammu Kashmir army spares tender 2026?

Bidders must meet turnover criteria for the last 3 years, submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, and provide OEM/authorization documents if applicable. Ensure SITC scope is priced with all components included, and comply with the option clause allowing up to 25% quantity variation.

What documents are required for Indian Army spares tender in Kashmir?

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and turnover proofs (audited balance sheets or CA certificate) for the last 3 financial years, plus OEM authorizations if applicable and vendor-code creation documents per ATC.

What is SITC scope for Army spare parts tender in DODA?

SITC refers to Supply, Installation, Testing and Commissioning of the listed spare parts, including Fuel Filters, Oil Filters, Gaskets, Belts, Pipes, Gauges, and related items; the bid must include complete lifecycle costs for all 26 items.

What delivery terms apply to quantity variation in this army tender?

The purchaser may increase or decrease quantity by up to 25% at contract placement or during currency. Delivery extensions are calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days and subject to other ATC conditions.

What standards or certifications are required for engagement in this tender?

The tender data lists no explicit standards; bidders must comply with the buyer ATC terms and provide turnover and procurement documents. Ensure all submittals align with the organization’s internal SITC and vendor-code requirements.

When is the submission deadline for the Indian Army spares tender in JK?

Specific submission dates are not provided in the extracted data; bidders should monitor the tender portal for the ATC document and bid invitation timelines, and prepare all mandatory documents (PAN, GSTIN, EFT Mandate, turnover proofs) in advance.

What are the key eligibility criteria for army spare parts procurement in Kashmir?

Key criteria include meeting the last 3-year turnover threshold, providing audited financials, submitting PAN and GSTIN, furnishing EFT enrollment, and providing vendor-code and OEM authorizations as required by the ATC; the scope covers SITC of 26 listed items.

How to verify OEM authorization for quantity of 26 spare parts?

Submit OEM authorization or authorized distributor proof for the 26 items; ensure each item pairing with the OEM is documented; if not applicable, provide alternative supplier certifications as per ATC and bidding rules.