TenderDekho Logo
GEM

Government Tender Published for Carriage of PCC and STP poles 8.5, 11 and 13 Mtr,Carriage of line material,Erection of PCC and STP in ALIGARH, UTTAR PRADESH

Bid Publish Date

24-Apr-2026, 5:25 pm

Bid End Date

25-May-2026, 12:00 pm

EMD

₹20,000

Value

₹20,00,000

Generate Docs

Progress

RA
Issue24-Apr-2026, 5:25 pm
Reverse Auction09-Jun-2026, 4:00 pm
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

32394

Category

Carriage and Installation of 25 KVA Transformer

Bid Type

Two Packet Bid

Categories 93

Uttar Pradesh Power Corporation Limited (uppcl) has released a public tender for Carriage of PCC and STP poles 8. 5, 11 and 13 Mtr, Carriage of line material, Erection of PCC and STP poles 8. 5, 11 and 13 Mtr, Erection of Double poles 8. 5, 11 and 13 Mtr, Installation and fixing of 11 KV TPMO. , Erection and Grouting of stay set, Providing and fixing of insulator, Laying of ACSR Weasal, Rabbit and Dog Conductor. , Erection of ABC Conductor, Grouting of PCC and STP poles, Making of plinth, Fixing of earthing rod, Chopping of tree branches, Providing and Fixing of Clamps of LT, Providing and Fixing, Carriage and Installation of 25 KVA Transformer, Carriage and Installation of 63 KVA Transformer, Carriage and Installation of 100 KVA Transformer, Carriage and Installation of 400 KVA Transformer, Dismantling of old PCC and STP poles, Dismantling and removal of conductor, Erection of section Tee Pole, Carriage and Installation of LT Dist Box, Provding and Fixing, Filling cable joints, Safe carriage of cables, Laying of under ground cable, Laying of Overhead cable, Guarding of 11 KV Line by GI wire, Safe Carriage and Installation of metering unit, Safe carriage and Installation of metering cubicle, Provding and Fixing Wearing GI pipe in ALIGARH, UTTAR PRADESH. Quantity: 32394. Submission Deadline: 25-05-2026 12: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Carriage of PCC and STP poles 8.5, 11 and 13 Mtr , Carriage of line material , Erection of PCC and STP poles 8.5, 11 and 13 Mtr , Erection of Double poles 8.5, 11 and 13 Mtr , Installation and fixing of 11 KV TPMO. , Erection and Grouting of stay set , Providing and fixing of insulator , Laying of ACSR Weasal, Rabbit and Dog Conductor. , Erection of ABC Conductor , Grouting of PCC and STP poles , Making of plinth , Fixing of earthing rod , Chopping of tree branches , Providing and Fixing of Clamps of LT , Providing and Fixing , Carriage and Installation of 25 KVA Transformer , Carriage and Installation of 63 KVA Transformer , Carriage and Installation of 100 KVA Transformer , Carriage and Installation of 400 KVA Transformer , Dismantling of old PCC and STP poles , Dismantling and removal of conductor , Erection of section Tee Pole , Carriage and Installation of LT Dist Box , Provding and Fixing, Filling cable joints , Safe carriage of cables , Laying of under ground cable , Laying of Overhead cable , Guarding of 11 KV Line by GI wire , Safe Carriage and Installation of metering unit , Safe carriage and Installation of metering cubicle , Provding and Fixing Wearing GI pipe

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9246014.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 32 Items Sign in for GEM prices

#1

Carriage of PCC and STP poles 8.5, 11 and 13 Mtr

Carriage of PCC and STP poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms

270 nos Delivery: 21 days
#2

Carriage of line material

Carriage of line material viz LT Cable, Conductor, GI earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms

7,000 kg Delivery: 21 days
#3

Erection of PCC and STP poles 8.5, 11 and 13 Mtr

Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work

134 nos Delivery: 21 days
#4

Erection of Double poles 8.5, 11 and 13 Mtr

Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work

64 nos Delivery: 21 days
#5

Installation and fixing of 11 KV TPMO.

Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work

64 nos Delivery: 21 days
#6

Erection and Grouting of stay set

Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work

140 nos Delivery: 21 days
#7

Providing and fixing of insulator

Providing and fixing of stay insulator

140 nos Delivery: 21 days
#8

Laying of ACSR Weasal, Rabbit and Dog Conductor.

Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work

20,000 mtr Delivery: 21 days
#9

Erection of ABC Conductor

ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm

800 mtr Delivery: 21 days
#10

Grouting of PCC and STP poles

Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms

260 nos Delivery: 21 days
#11

Making of plinth

Making the plinth of Steel poles

12 nos Delivery: 21 days
#12

Fixing of earthing rod

Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer including the cost of labour, T and P etc Required for proper completion of work

270 nos Delivery: 21 days
#13

Chopping of tree branches

Chopping of tree branches which are touching to HT and LT lines

40 nos Delivery: 21 days
#14

Providing and Fixing of Clamps of LT

Providing and Fixing of Clamps of LT, Cross Arm Holding, F Clamp, Stay Clamp, Danger board clamp and all type clamps with Nut and Bolts as per actual site requirement

320 nos Delivery: 21 days
#15

Providing and Fixing

Providing and Fixing of LT shackle insulator

20 nos Delivery: 21 days
#16

Providing and Fixing

Providing and Fixing of missing Nut bolts and washer

120 kg Delivery: 21 days
#17

Carriage and Installation of 25 KVA Transformer

Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work

48 nos Delivery: 21 days
#18

Carriage and Installation of 63 KVA Transformer

Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work

12 nos Delivery: 21 days
#19

Carriage and Installation of 100 KVA Transformer

Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work

10 nos Delivery: 21 days
#20

Carriage and Installation of 400 KVA Transformer

Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work

4 nos Delivery: 21 days
#21

Dismantling of old PCC and STP poles

Dismentling of old PCC and STP poles for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T and P carrier etc required for proper completion of work

4 nos Delivery: 21 days
#22

Dismantling and removal of conductor

Dismantling and removal of existing conductor, cable, GI Wire from the various area preparing their coils and then stacking in the respective JEOs Store as per direction of Supervising Engineer It includes the work of cartage, cost of labour, T nad P carrier etc required for proper completion of work

200 mtr Delivery: 21 days
#23

Erection of section Tee Pole

Erection of section Tee pole including fixing of all fittings as per RESPO norms

8 nos Delivery: 21 days
#24

Carriage and Installation of LT Dist Box

Carriage and Installation of LT distribution box three phase distribution box from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESSPO norms

32 nos Delivery: 21 days
#25

Provding and Fixing, Filling cable joints

Provding and Fixing and Filling of 3x70,3x120,3X185 11 KV XLPE heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour T and P carrier etc for proper completion of work

10 nos Delivery: 21 days
#26

Safe carriage of cables

Safe carriage of 3x70,3x120,3X185,3x300 Sqmm 33 KV by 11 KV XLPE Cable from Store Center to respective site of work including loading and unloading at both ends for proper completion of work

800 mtr Delivery: 21 days
#27

Laying of under ground cable

Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling Spare cable shall be left and buried in the trench in the shape of rings at both ends All material except cable, labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost

800 mtr Delivery: 21 days
#28

Laying of Overhead cable

Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV Overhead cable work includes labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost

100 mtr Delivery: 21 days
#29

Guarding of 11 KV Line by GI wire

Guarding of 11 KV Line by laying two nos GI wire parallel and fixing of lacings tilli at a distance at 2 to 3 Mtr as per RESPO manual and also including the cost of arragement of labour, T and P etc required for proper completion of work

700 mtr Delivery: 21 days
#30

Safe Carriage and Installation of metering unit

Safe Carriage and Installation of 33KV by 11 KV CT and PT Pole Mounted metering unit on double pole after fixing of channel with M S Clamps and nuts bolts for holding the channel angle etc The unit body shall be earthed by connecting M S strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 KV line shall be connected to unit as per instructions of SDO and AE M The M S Strip and earth rod shall be included in the scope of work

4 nos Delivery: 21 days
#31

Safe carriage and Installation of metering cubicle

Safe carriage and Installation of 33KV by 11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work

4 nos Delivery: 21 days
#32

Provding and Fixing Wearing GI pipe

Provding and Fixing Wearing GI pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply

4 job Delivery: 21 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

21-May-2026

Extended Deadline

25-May-2026, 12:00 pm

Opening Date

25-May-2026, 12:30 pm

Reverse Auction Schedule

Completed

Start

09-Jun-2026, 4:00 pm

End

10-Jun-2026, 4:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
M/S RADHA KRISHAN CONTRACTOR   Under PMA
-24-05-2026 17:33:33
2
RAKSHA POWER INFRATECH   Under PMA
-22-05-2026 09:13:44
3
SANJAY ELECTRICALS   Under PMA
-23-05-2026 21:18:11

Financial Results

Rank Seller Price Item
L1
M/S RADHA KRISHAN CONTRACTOR   Under PMA
Item Categories : Carriage of PCC and STP poles 8.5, 11 and 13 Mtr,Carriage of line material,Erection of PCC and STP
L2
RAKSHA POWER INFRATECH   Under PMA
Item Categories : Carriage of PCC and STP poles 8.5, 11 and 13 Mtr,Carriage of line material,Erection of PCC and STP
L3
SANJAY ELECTRICALS   Under PMA
Item Categories : Carriage of PCC and STP poles 8.5, 11 and 13 Mtr,Carriage of line material,Erection of PCC and STP