Bid Publish Date
12-Oct-2026, 7:11 pm
Bid End Date
26-Oct-2026, 8:00 pm
Location
Progress
The Indian Army (Department of Military Affairs) in Haridwar, Uttarakhand invites bidders for a comprehensive spare-parts procurement package covering multiple dozer and heavy-equipment components. The scope encompasses items such as seal kits, track links (RH/LH), regular pins and bushings, exhaust manifolds, fuel filters, piston rods, center joints, pipe assemblies, and related hardware. The operational delivery will occur at MT & Plant School, BEG & Centre, Roorkee (multiple addresses listed). The contract permits quantity variation up to 25% during order execution at contracted rates, with a minimum extension period of 30 days. The initiative targets OEMs or authorized resellers with proven government-supply experience and non-obsolete stock.
Key items span 26 BoQ entries with nomenclature including seal kits for cylinders, track components, adapters, castings, and associated fasteners. While explicit performance standards are not disclosed in the available data, the tender emphasizes OEM-level installation and commissioning by the original equipment manufacturer or authorized personnel. Deliverables must align with government procurement norms, non-obsolete product lifecycle with minimum 2 years residual market life, and adherence to security/compliance expectations. Delivery and commissioning readiness at Roorkee facilities, along with Malicious Code Certification for hardware/ software, are indicated prerequisites.
The tender includes an option clause enabling up to 25% quantity variation during contract and extended delivery based on calculated timeframes. The bidder must demonstrate 3 years of govt/PSU-supply experience for similar category products, with supporting contracts. Documentation requires PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorizations. Installation and commissioning should be performed by OEM-certified resources. Additional terms include non-liquidation status and avoidance of obsolete products, with mandatory Malicious Code Certification for hardware/software.
Option clause permits 25% quantity variation during contract and extended delivery with proportional time adjustments
Delivery and installation at Roorkee BEG & Centre facilities; multiple addresses listed
3 years govt/PSU supply experience required; evidence via contracts and annual reports
Not disclosed in data; bidders should await official tender terms for payment milestones and security deposits
Delivery period begins after original delivery order; additional time computed as (increased quantity / original quantity) × original period with minimum 30 days
Not explicitly stated; standard govt contracts apply LDs for delayed delivery and non-compliance per terms
3 years of government/PSU procurement experience for similar category products
Non-liquidation and no insolvency status; bid-undertaking required
OEM authorization or authorized reseller status; installation by OEM-certified personnel
Quantity
273
Category
Piston rod
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
16
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Seal kit dozer cyl , Pin , Seal kit bucket cylinder , Adapter , Track link RH , Track link LH , Regular pin , Regular bushing , Track seal , Bolt , Filter oil , Speed solenoid valve assembly , seal kit , Ring , Planetary , Exhaust manifold , Exhaust elbow , Fuel filter , Piston rod , Piston rod nut , Bush , Seal kit cylinder arm , Pipe , Centre joint body , Track bolt
Pre-Bid Date
16-10-2026 13:00:00
Pre-Bid Venue
MT & Plant School, BEG & Centre, Roorkee
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
HARIDWAR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | HARIDWAR | HARIDWAR | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Seal kit dozer cyl
As per specification and cat part no
Pin
As per specification and cat part no
Seal kit bucket cylinder
As per specification and cat part no
Adapter
As per specification and cat part no
Track link RH
As per specification and cat part no
Track link LH
As per specification and cat part no
Regular pin
As per specification and cat part no
Regular bushing
As per specification and cat part no
Track seal
As per specification and cat part no
Bolt
As per specification and cat part no
Filter oil
As per specification and cat part no
Speed solenoid valve assembly
As per specification and cat part no
seal kit
As per specification and cat part no
Ring
As per specification and cat part no
Planetary
As per specification and cat part no
Exhaust manifold
As per specification and cat part no
Exhaust elbow
As per specification and cat part no
Fuel filter
As per specification and cat part no
Piston rod
As per specification and cat part no
Piston rod nut
As per specification and cat part no
Bush
As per specification and cat part no
Seal kit cylinder arm
As per specification and cat part no
Pipe
As per specification and cat part no
Pipe
As per specification and cat part no
Centre joint body
As per specification and cat part no
Track bolt
As per specification and cat part no
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Seal kit dozer cyl | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 2 | Pin | As per specification and cat part no | 2 | nos | savyasanchi | 30 | |
| 3 | Seal kit bucket cylinder | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 4 | Adapter | As per specification and cat part no | 3 | nos | savyasanchi | 30 | |
| 5 | Track link RH | As per specification and cat part no | 23 | nos | savyasanchi | 30 | |
| 6 | Track link LH | As per specification and cat part no | 29 | nos | savyasanchi | 30 | |
| 7 | Regular pin | As per specification and cat part no | 29 | nos | savyasanchi | 30 | |
| 8 | Regular bushing | As per specification and cat part no | 25 | nos | savyasanchi | 30 | |
| 9 | Track seal | As per specification and cat part no | 48 | nos | savyasanchi | 30 | |
| 10 | Bolt | As per specification and cat part no | 14 | nos | savyasanchi | 30 | |
| 11 | Filter oil | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 12 | Speed solenoid valve assembly | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 13 | seal kit | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 14 | Ring | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 15 | Planetary | As per specification and cat part no | 3 | nos | savyasanchi | 30 | |
| 16 | Exhaust manifold | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 17 | Exhaust elbow | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 18 | Fuel filter | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 19 | Piston rod | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 20 | Piston rod nut | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 21 | Bush | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 22 | Seal kit cylinder arm | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 23 | Pipe | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 24 | Pipe | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 25 | Centre joint body | As per specification and cat part no | 1 | nos | savyasanchi | 30 | |
| 26 | Track bolt | As per specification and cat part no | 81 | nos | savyasanchi | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card copy
Cancelled cheque and EFT mandate
Experience certificates showing 3 years govt/PSU supply
OEM authorizations or reseller agreements
Proof of non-obsolescence and market-life statement
Malicious Code Certification for hardware/software
Technical bid documents and any installation/commissioning plans
Key insights about UTTARAKHAND tender market
Bidders must have 3 years govt/PSU supply experience, OEM authorizations, GSTIN, PAN, EFT mandate, and Malicious Code Certification. Submit installation/commissioning plans and non-obsolescence declarations. Follow option clause limits and deliver to Roorkee BEG & Centre facilities; payment terms to be disclosed in the official bid.
Required documents include GST registration, PAN copy, cancelled cheque, EFT mandate, 3-year govt/PSU supply experience proofs, OEM authorization, Malicious Code Certification, and technical bid documents. Ensure all contracts show ongoing or completed supply to govt entities within the last three years.
The BoQ includes seal kits for cylinders, track links RH/LH, regular pins/bushings, track bolts, fuel/oil filters, exhaust components, piston rods, centre joints, pipes, and related hardware. Each item requires OEM-level installation readiness and non-obsolescence assurances.
Delivery is to be made to MT & Plant School, BEG & Centre, Roorkee (multiple addresses). The option clause allows up to 25% quantity variation at contract, with delivery time calculated as (increased quantity/original quantity)×original period, minimum 30 days.
Yes, bidders must provide Malicious Code Certification for hardware and software offered, indicating secure integration with Army-grade systems; ensure OEM-certified installation practices accompany the bid.
Bidders or their OEMs must have manufactured and supplied similar category products to govt/PSU bodies for at least 3 years before bid opening; provide copies of relevant contracts showing yearly quantities.
Offerings must not be end-of-life within the next two years; bidders must certify at least 2 years residual market life for the proposed items to avoid obsolescence risk.
Risks include stringent OEM-authorship, delivery to Roorkee facilities, 25% quantity variation, and requirement for installation by OEM-certified staff; ensure timely supply chains and substantiation of govt contracts to mitigate penalties.