Bid Publish Date
21-Jan-2026, 9:27 am
Bid End Date
31-Jan-2026, 10:00 am
Location
Progress
Quantity
1760
Organization: Bharat Electronics Limited (BEL) under the Department of Defence Production. Procuring nine items including dual axis heavy duty tripod, AC to DC converter, two axis gimbal, portable drone detector jammer, integrated detector and jammer, directional antenna, omni directional antenna, STP Ethernet cable, and power cable with lockable connector. Location: not disclosed; tender scope targets defense electronics and comms hardware. Estimated value and EMD: not disclosed; scope indicates multi-item procurement for security and surveillance applications. Key differentiator: combination of detection, jamming, and stabilization hardware, with diverse RF/ICT components. Unique aspects: cross-domain equipment set spanning stabilization, power, cabling, and RF signaling.
EMD amount and payment schedule to be clarified in ATC
Delivery timeline and penalties to be confirmed with BEL
OEM authorizations may be required for each item in the BOQ
Exact payment terms and security deposit to be defined in the ATC; bidders should expect milestone-based payments post-delivery
Delivery timeline to be specified in ATC; bidders must confirm on-site handling, installation, and testing requirements
LD details will be provided in ATC; bidders should anticipate penalties for late delivery or non-compliance with technical specs
Defense procurement eligibility and compliance with BEL/DoDP requirements
Prior experience with deploying stabilization, RF sensing, or jamming equipment
Demonstrated OEM authorization or capability to supply integrated detector/jammer components
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | DUAL AXIS HEAVY DUTY TRIPOD | DUAL AXIS HEAVY DUTY TRIPOD | 55 | no | abthakur | 280 |
| 2 | AC TO DC CONVERTER | AC TO DC CONVERTER | 275 | no | abthakur | 280 |
| 3 | TWO AXIS GIMBAL | TWO AXIS GIMBAL | 55 | no | abthakur | 280 |
| 4 | PORTABLE DRONE DETECTOR JAMMER | PORTABLE DRONE DETECTOR & JAMMER SYSTEM | 55 | no | abthakur | 280 |
| 5 | INTEGRATED DETECTOR AND JAMMER | INTEGRATED DETECTOR AND JAMMER | 220 | no | abthakur | 280 |
| 6 | DIRECTIONAL ANTENNA | DIRECTIONAL ANTENNA | 275 | no | abthakur | 280 |
| 7 | OMNI DIRECTIONAL ANTENNA | OMNI DIRECTIONAL ANTENNA | 275 | no | abthakur | 280 |
| 8 | STP ETHERNET CABLE | STP ETHERNET CABLE | 275 | no | abthakur | 280 |
| 9 | POWER CABLE WITH LOCKABLE CONNECTOR | POWER CABLE WITH LOCKABLE CONNECTOR | 275 | no | abthakur | 280 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates from similar defense electronics deployments
Financial statements for last 3 years
EMD document or alternative security as per ATC
Technical bid documents demonstrating compliance with product categories
OEM authorization letters for each item (if required)
Key insights about MAHARASHTRA tender market
Bidders must submit GST registration, PAN, company registration, experience certificates for similar defense deployments, 3-year financial statements, EMD documents, OEM authorizations, and technical bid demonstrating compliance with product categories such as tripod, gimbal, drone jammer, and antennas.
Prepare OEM-supported technical proposals for each item, ensure compliance with any ATC standards, submit all required documents, provide installation and training capabilities, and await BEL’s ATC clarification on EMD, delivery timelines, and payment terms before submission.
Exact standards are not listed in the data; bidders should expect defense-grade certifications and OEM-specific compliance. Prepare IS/IEC style or equivalent defense sector standards, and ensure equipment interoperability with BEL system architectures as per ATC.
Delivery timeline will be specified in the ATC accompanying the buyer-added terms. Penalties or liquidated damages will also be detailed in ATC; bidders should plan for phased delivery and potential LD for delays after order placement.
EMD amount is not disclosed in the provided data and will be specified in the ATC. Bidders should be prepared to submit the indicated EMD via the prescribed method to qualify for technical evaluation.
An OEM authorization may be required for integrated detector and jammer items. Provide manufacturer confirmation, warranty terms, and service support commitments, along with standard-compliant technical documentation and installation capabilities.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS