Progress
Indian Army invites bids for Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessary fittings, Heavy duty MS pipe line of 40 mm dia approx 16 m long for boiler steam pipe line, Steam Fiberglass insulation for 40 mm dia MS pipe upto 16 mtr, Cutting of existing pipe and old flange welding grainding finishing, Replacement of MS flauge duly wilded across the valve, Steam stop valve thermo dynamic type for main line, Dismantling of unserviceable old sheets by removing screws and removal of unserviceable insulation from upper body of boiler in KHORDHA, ODISHA. Quantity: 24. Submission Deadline: 28-09-2026 12: 00: 00. Submit your proposal before the deadline.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M/S HARIHARA NAYAK Under PMA | - | 24-09-2026 17:11:09 | |
| 2 | M/S KAMAL KEE ENGINEERS WORK Under PMA | - | 23-09-2026 23:26:28 | |
| 3 | M/S PRADIPTA KUMAR PANI Under PMA | - | 24-09-2026 15:57:26 | |
| 4 | SMART ENERGY SOLUTIONS Under PMA | - | 26-09-2026 10:38:26 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | M/S HARIHARA NAYAK(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessar | |
| L2 | M/S PRADIPTA KUMAR PANI (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessar | |
| L3 | M/S KAMAL KEE ENGINEERS WORK (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessar | |
| L4 | SMART ENERGY SOLUTIONS (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessar |
Quantity
24
Category
Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessary fittings
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessary fittings , Heavy duty MS pipe line of 40 mm dia approx 16 m long for boiler steam pipe line , Steam Fiberglass insulation for 40 mm dia MS pipe upto 16 mtr , Cutting of existing pipe and old flange welding grainding finishing , Replacement of MS flauge duly wilded across the valve , Steam stop valve thermo dynamic type for main line , Dismantling of unserviceable old sheets by removing screws and removal of unserviceable insulation from upper body of boiler
Pre-Bid Date
14-09-2026 11:00:00
Pre-Bid Venue
GE Chilka
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Khurda (khordha)
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Khurda (khordha) | Khurda (khordha) | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessary fittings
Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessary fittings the technical officer of the station INS Chilka directed to replace the unservicable MS pipe and relocate the new pipe line to keep the distance from steam engine and tank etc The heavy grade MS pipe to be used approximate 16 mtr long This Ms heavy grade pipe line of 40 mm is covered with fibre glass insulation of suitable size to meet the existing insulation of suitable size to meet the existing insulation etc All the following items are included in the quoted rates by the contractor or vendor etc Dismantling and fixing of new
Heavy duty MS pipe line of 40 mm dia approx 16 m long for boiler steam pipe line
Heavy duty MS pipe line of 40 mm dia approx 16 m long for boiler steam pipe line
Steam Fiberglass insulation for 40 mm dia MS pipe upto 16 mtr
Steam Fiberglass insulation for 40 mm dia MS pipe upto 16 mtr including rope aluminium foil to give protection approx 16 m
Cutting of existing pipe and old flange welding grainding finishing
Cutting of existing pipe and old flange welding grainding finishing and reconnecting to existing stem pipe line and testing complete
Replacement of MS flauge duly wilded across the valve
Replacement of MS flauge duly wilded across the valve
Steam stop valve thermo dynamic type for main line
Steam stop valve thermo dynamic type for main line flange type 40 mm dia
Dismantling of unserviceable old sheets by removing screws and removal of unserviceable insulation from upper body of boiler
Dismantling of unserviceable old sheets by removing screws and removal of unserviceable insulation from upper body of boiler providing the new low pressure relief valve LRV GI oblique AL sheet heavy duty having zero point 6 mm thickness minimum 2 point zero sqm above as required cladding after a layer of mineral wool rock wool insulation as per existing the thickness 100-150 mm The job includes all the small material required for safety and fitting
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessary fittings | Material and Labour replacement of unserviceable steam line heavy duty black pipe with all necessary fittings the technical officer of the station INS Chilka directed to replace the unservicable MS pipe and relocate the new pipe line to keep the distance from steam engine and tank etc The heavy grade MS pipe to be used approximate 16 mtr long This Ms heavy grade pipe line of 40 mm is covered with fibre glass insulation of suitable size to meet the existing insulation of suitable size to meet the existing insulation etc All the following items are included in the quoted rates by the contractor or vendor etc Dismantling and fixing of new | 1 | each job | agebrchilka | 30 | |
| 2 | Heavy duty MS pipe line of 40 mm dia approx 16 m long for boiler steam pipe line | Heavy duty MS pipe line of 40 mm dia approx 16 m long for boiler steam pipe line | 1 | each job | agebrchilka | 30 | |
| 3 | Steam Fiberglass insulation for 40 mm dia MS pipe upto 16 mtr | Steam Fiberglass insulation for 40 mm dia MS pipe upto 16 mtr including rope aluminium foil to give protection approx 16 m | 16 | mtr | agebrchilka | 30 | |
| 4 | Cutting of existing pipe and old flange welding grainding finishing | Cutting of existing pipe and old flange welding grainding finishing and reconnecting to existing stem pipe line and testing complete | 1 | job | agebrchilka | 30 | |
| 5 | Replacement of MS flauge duly wilded across the valve | Replacement of MS flauge duly wilded across the valve | 2 | nos | agebrchilka | 30 | |
| 6 | Steam stop valve thermo dynamic type for main line | Steam stop valve thermo dynamic type for main line flange type 40 mm dia | 2 | nos | agebrchilka | 30 | |
| 7 | Dismantling of unserviceable old sheets by removing screws and removal of unserviceable insulation from upper body of boiler | Dismantling of unserviceable old sheets by removing screws and removal of unserviceable insulation from upper body of boiler providing the new low pressure relief valve LRV GI oblique AL sheet heavy duty having zero point 6 mm thickness minimum 2 point zero sqm above as required cladding after a layer of mineral wool rock wool insulation as per existing the thickness 100-150 mm The job includes all the small material required for safety and fitting | 1 | each job | agebrchilka | 30 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer