Progress
Indian Air Force invites bids for the Repair, Maintenance & Installation of Multi-Purpose Water Pump systems at Air Force Station Tezpur, Sonitpur, Assam 784001. Scope covers 4 repair units with an estimated value of ₹59,944.00. Location-specific security protocols apply, including government ID verification and police clearance for all personnel. Final acceptance occurs after buyer inspection and functional testing. The contract emphasizes strict 100% scope adherence and verification before service delivery acceptance.
Security verification for all personnel with PVCs and Govt IDs
Final acceptance post on-site inspection and testing by buyer
Past performance and non-performance risk provisions apply
Not specified in data; likely subject to GeM terms and final acceptance
On-site service delivery at Air Force Station Tezpur; final acceptance after inspection
Not explicitly stated; GeM incident framework may be invoked for non-compliance
Experience in repair/maintenance of water pump systems
Capability to operate within defence/protected establishment requirements
Compliance with PVCs and police verification for personnel
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - DEFENCE; MULTI PURPOSE WATER PUMP; Service Provider
Delivery Locations
1
Delivery Cities
SONITPUR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SONITPUR | SONITPUR | - | - | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar pump repair/maintenance
Financial statements (latest audited if available)
EMD/Security deposit documents (as applicable by terms)
Technical bid documents showing scope conformity
OEM authorization or service partner certificates (if required)
Police Verification Certificates (PVCs) for all personnel
Identity documents for workers (Aadhar or govt IDs)
Key insights about ASSAM tender market
Bidders must meet security prerequisites, submit GST and PAN, provide experience in pump repairs, and furnish PVCs for all personnel. The on-site work requires final buyer inspection and 100% scope compliance to avoid GeM escalation. Ensure delivery at Air Force Station Tezpur within stipulated timelines.
Submit GST, PAN, financial statements, experience certificates for similar work, EMD documents, technical bid, OEM authorizations if applicable, and PVCs for every deployed worker. Also provide identity proofs and security clearance as requested by the Air Force at Tezpur.
Specific pump model details are not listed; the bidder must provide 4 units of repair scope, complete on-site maintenance, and ensure 100% scope compliance with final acceptance following buyer testing at Tezpur.
Final acceptance occurs after the designated buyer inspects and conducts functional testing on-site at Air Force Station Tezpur; approval is contingent on compliance with 100% scope of work and successful testing.
EMD information is not provided in the data; payment terms are typically linked to GeM and final acceptance; bidders should prepare for standard GeM payment processes post-acceptance.
All personnel must carry two government IDs; Aadhar is mandatory;Police Verification Certificates must be current (not older than 6 months) for site access and passes will be issued post-verification.
Any deviation from the defined scope may trigger rejection and initiation of a GeM Incident; suppliers should ensure full alignment with the agreed repair/maintenance scope before on-site work.
The designated buyer representative conducts the final functional testing after service delivery; failure to pass testing may impact acceptance and payment processing under GeM.