Indian Army Brake & Mechanical Parts Tender Jhansi Uttar Pradesh 2025 – IS 550/ISI/ISO Standards Req & 2-Year OEM Warranty
Indian Army
JHANSI, UTTAR PRADESH
Menu
Bid Publish Date
06-Dec-2025, 6:53 pm
Bid End Date
16-Dec-2025, 7:00 pm
Location
Progress
Quantity
39
Category
SHAFT
Bid Type
Two Packet Bid
Indian Army (Department Of Military Affairs) invites bids for a broad set of mechanical assemblies including SHAFT, HOSE JS 8X500 1111 ON 63, WIPER MOTOR, SPEEDOMETER ASSY, PUMP ASSY FUEL, ARM ASSY WIPER RH, and related components. The scope covers Supply, Installation, Testing and Commissioning of 23 items with delivery to a designated Indian facility (Babina Cantt). The contract specifies a 2-year OEM warranty and requires established service centers in each consignee state, with a 30-day window to establish centers post-award if not present. The bid may include option clauses for quantity variances up to 25%, with delivery timing linked to last date of original/extended orders. Unique aspects include the wide array of vehicle-related subsystems and the need for on-site installation and commissioning where applicable.
Total 23 items in BOQ; specific part numbers not disclosed
Products include: SHAFT, HOSE JS 8X500 1111 ON 63, WIPER MOTOR, SPEEDOMETER ASSY, PUMP ASSY FUEL, ARM ASSY WIPER RH, SELF STARTER ASSY, ALTERNATOR ASSY, HORN ASSY HIGH, SPIDER UNIVERSAL JOINT VEHICULAR, INSTRUMENT DRIVE HOUSING, PUMP COOLANT WATER PUMP, MASTER SLAVE CLUTCH, POWER UNIT CLUTCH MASTER, SWITCH PRESSURE, DIFF LOCK ROTARY SWITCH, HOSE, MAIN CYLINDER DIA 22, PROTECTIVE BAG, PIPE BENTMETALLIC 130 076 842 254, IGNITION CUM STEERING LOCK, FIELD COIL ASSY, ARMATURE
Delivery location: Babina Cantt
Warranty: 2 years from final acceptance or post-installation; OEM certificates required at delivery
Service requirement: Functional service centers in consignee states or establishment within 30 days
Delivery quantity may vary by ±25%; extended delivery timelines may apply
Mandatory on-site installation, testing and commissioning where scope includes such services
OEM warranty of 2 years; service centers must be established or demonstrated
Payment linked to delivery/acceptance milestones; service center evidence required for payment release; no explicit advance percentage stated
Delivery period commences from last date of order; option-based quantity changes may adjust delivery time with minimum 30 days
Not explicitly detailed; implications depend on acceptance and delivery milestones under option clause
Demonstrated capability to supply and install mechanical assemblies for defense equipment
Presence of OEM or authorized service network with at least 2-year warranty support
Compliance with PAN, GST, and EFT mandate submission; evidence of service center in consignee state
Indian Army
JHANSI, UTTAR PRADESH
Indian Army
HISAR, HARYANA
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
LUCKNOW, UTTAR PRADESH
Indian Army
TINSUKIA, ASSAM
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SHAFT | SHAFT | 3 | nos | nanda@74 | 15 |
| 2 | HOSE JS 8X500 1111 ON 63 544202 | HOSE JS 8X500 1111 ON 63 544202 | 3 | nos | nanda@74 | 15 |
| 3 | WIPER MOTOR | WIPER MOTOR | 1 | nos | nanda@74 | 15 |
| 4 | SPEEDOMETER ASSY | SPEEDOMETER ASSY | 1 | nos | nanda@74 | 15 |
| 5 | PUMP ASSY FUEL | PUMP ASSY FUEL | 2 | nos | nanda@74 | 15 |
| 6 | ARM ASSY WIPER RH | ARM ASSY WIPER RH | 1 | nos | nanda@74 | 15 |
| 7 | SELF STARTER ASSY | SELF STARTER ASSY | 1 | nos | nanda@74 | 15 |
| 8 | ALTERNATOR ASSY | ALTERNATOR ASSY | 1 | nos | nanda@74 | 15 |
| 9 | HORN ASSY HIGH | HORN ASSY HIGH | 1 | nos | nanda@74 | 15 |
| 10 | SPIDER UNIVERSAL JOINT VEHICULAR | SPIDER UNIVERSAL JOINT VEHICULAR | 4 | nos | nanda@74 | 15 |
| 11 | INSTRUMENT DRIVE HOUSING | INSTRUMENT DRIVE HOUSING | 1 | nos | nanda@74 | 15 |
| 12 | SA OF PUMP COOLANT WATER PUMP | SA OF PUMP COOLANT WATER PUMP | 2 | nos | nanda@74 | 15 |
| 13 | SLAVE CYL CLUTCH | SLAVE CYL CLUTCH | 1 | nos | nanda@74 | 15 |
| 14 | MASTER CYL POWER UNIT CLUTCH MASTER CYL | MASTER CYL POWER UNIT CLUTCH MASTER CYL | 3 | nos | nanda@74 | 15 |
| 15 | SWITCH PRESSURE | SWITCH PRESSURE | 2 | nos | nanda@74 | 15 |
| 16 | DIFF LOCK ROTARY SWITCH | DIFF LOCK ROTARY SWITCH | 1 | nos | nanda@74 | 15 |
| 17 | HOSE | HOSE | 1 | nos | nanda@74 | 15 |
| 18 | MAIN CYLINDER DIA 22 2 | MAIN CYLINDER DIA 22 2 | 1 | nos | nanda@74 | 15 |
| 19 | PROTECTIVE BAG | PROTECTIVE BAG | 3 | nos | nanda@74 | 15 |
| 20 | PIPE BENTMETALLIC 130 076 842 254 | PIPE BENTMETALLIC 130 076 842 254 | 3 | nos | nanda@74 | 15 |
| 21 | IGNISTION CUM STEERING LOCK | IGNISTION CUM STEERING LOCK | 1 | nos | nanda@74 | 15 |
| 22 | FIELD COIL ASSY | FIELD COIL ASSY | 1 | nos | nanda@74 | 15 |
| 23 | ARMATURE | ARMATURE | 1 | nos | nanda@74 | 15 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
OEM authorization certificates (if applicable)
Technical bid documents demonstrating capability for Installation, Testing & Commissioning
Evidence of functional Service Centre in the State of each consignee or plan to establish within 30 days
Certificate of warranty and post-sales support readiness
Any prior experience certificates related to similar mechanical assemblies
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | Gayatri Enterprises Under PMA | - | 09-12-2025 16:36:02 | Qualified |
| 2 | HINDUSTAN TRADING CORPORATION Under PMA | - | 10-12-2025 14:26:21 | Qualified |
| 3 | PRATEEK MOTORS Under PMA | - | 10-12-2025 17:09:10 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | PRATEEK MOTORS(MSE)( MSE Social Category:General ) Under PMA | ₹1,44,921 | Item Categories : SHAFT,HOSE JS 8X500 1111 ON 63 544202,WIPER MOTOR,SPEEDOMETER ASSY,PUMP ASSY FUEL,ARM ASSY WIPER RH |
| L2 | Gayatri Enterprises Under PMA | ₹1,68,047 | Item Categories : SHAFT,HOSE JS 8X500 1111 ON 63 544202,WIPER MOTOR,SPEEDOMETER ASSY,PUMP ASSY FUEL,ARM ASSY WIPER RH |
| L3 | HINDUSTAN TRADING CORPORATION Under PMA | ₹1,78,540 | Item Categories : SHAFT,HOSE JS 8X500 1111 ON 63 544202,WIPER MOTOR,SPEEDOMETER ASSY,PUMP ASSY FUEL,ARM ASSY WIPER RH |
Key insights about UTTAR PRADESH tender market
Bidders must submit PAN, GST, cancelled cheque, and EFT Mandate with their bid, plus OEM authorization if required. Ensure 2-year OEM warranty, and demonstrate service centers in each consignee state or a plan to establish within 30 days of award. Include evidence of capability for supply, installation, testing, and commissioning.
Required documents include PAN, GST certificate, cancelled cheque, EFT mandate, OEM authorization, installation and commissioning capability details, and proof of functional service centers or commitment to establish within 30 days. Also submit warranty certificates and prior similar project experience if available.
The scope covers Supply, Installation, Testing and Commissioning of 23 items, with delivery terms allowing ±25% quantity variation. Delivery period starts from the last date of the original order, with possible extension under the option clause. Babina Cantt is the delivery/installation site.
A 2-year OEM warranty is required from the date of final acceptance or after completion of installation and testing. OEM warranty certificates must be submitted at delivery, and the seller must have a service group capable of in-India maintenance and troubleshooting.
Nominated Inspection Agency will perform pre-dispatch inspections on behalf of the buyer. No specific agency is named here; ensure readiness to support inspection processes and provide all testing reports and compliance certificates as required.
Eligibility includes having a valid PAN and GST, bank EFT mandate, OEM authorization where applicable, proven capability for installation and commissioning, and establishing or proving existing service centers in consignee states. Compliance with security and warranty provisions is mandatory.
Quantity can be increased or decreased by up to 25% at contract placement and during the currency of the contract at contracted rates. Extended delivery time is calculated as (Increase in quantity / Original quantity) × Original delivery period, with a minimum of 30 days.
Delivery, installation and commissioning are to be performed at Babina Cantt. Ensure logistics planning accounts for secure transport of mechanical assemblies and on-site setup as per contract scope.
Indian Army
📍 UDHAMPUR, JAMMU & KASHMIR
Indian Army
📍 BARDHAMAN, WEST BENGAL
Indian Army
📍 DHEMAJI, ASSAM
Indian Army
📍 BARDHAMAN, WEST BENGAL
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS