TenderDekho Logo
Closed GEM

Bids are Invited For Input Output Box,Cat 6 A cable UTP,Gang box with face plate Dual Port,Cable manager Panel,UTP Patch in CENTRAL DELHI, DELHI

Bid Publish Date

19-Mar-2026, 12:55 pm

Bid End Date

10-Apr-2026, 2:00 pm

EMD

₹3,30,000

Generate Docs

Progress

RA
Issue19-Mar-2026, 12:55 pm
Reverse Auction09-Jul-2026, 3:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

117974

Category

Cat 6 A cable UTP

Bid Type

Two Packet Bid

Categories 41

Public procurement opportunity for Indian Air Force Input Output Box, Cat 6 A cable UTP, Gang box with face plate Dual Port, Cable manager Panel, UTP Patch cord 3M, UTP Patch cord 1M, Fiber junction box TJB box 24 core, Fiber junction Box 48 Core, LIU 24 Port FDF, LIU 48 Port FDF, Optical fibre cable Single Mode, PVC Conduit pipe 40 mm, GI Pipe 40mm, HDPE Pipe, RJ 45cat VI connectors 2000pcs, Batteries stands 17 inch x 9inch, Jack panel 24port cat 6a, Open rack 42U, LC LC OFC patch cord, LC LC patch cord, FDF Rack, Laying of cat6A UTP cable and associate fixtures, Jack panel 24 port Cat 6 A loaded with dust cover input out fixing, Digging and laying of 24 Core OFC and fixing LIU splicing and testing, Laying of OFC 24 core OFC and fixing of Fiber TJB 24 48, Casing and capping 25mm batten in CENTRAL DELHI, DELHI. Quantity: 117974 issued by. Submission Deadline: 10-04-2026 14: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Input Output Box , Cat 6 A cable UTP , Gang box with face plate Dual Port , Cable manager Panel , UTP Patch cord 3M , UTP Patch cord 1M , Fiber junction box TJB box 24 core , Fiber junction Box 48 Core , LIU 24 Port FDF , LIU 48 Port FDF , Optical fibre cable Single Mode , PVC Conduit pipe 40 mm , GI Pipe 40mm , HDPE Pipe , RJ 45cat VI connectors 2000pcs , Batteries stands 17 inch x 9inch , Jack panel 24port cat 6a , Open rack 42U , LC LC OFC patch cord , LC LC patch cord , FDF Rack , Laying of cat6A UTP cable and associate fixtures , Jack panel 24 port Cat 6 A loaded with dust cover input out fixing , Digging and laying of 24 Core OFC and fixing LIU splicing and testing , Laying of OFC 24 core OFC and fixing of Fiber TJB 24 48 , Casing and capping 25mm batten

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9102425.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 26 Items Sign in for GEM prices

#1

Input Output Box

ABS PVC mounting surfce flush port single dual dimn 80x 80mm labeling yes flame retardant

600 each Delivery: 15 days
#2

Cat 6 A cable UTP

4pairs 23 awg solid copper u utp unshielded 500mhz high purity copper service life 20years

30,000 meter Delivery: 15 days
#3

Gang box with face plate Dual Port

ABS PVC 2 ports 120 x 80mm flame retardant

600 each Delivery: 15 days
#4

Cable manager Panel

rank mount 19 inch CRCA steel plastic rings 6 12 slots duarbility 5yrs

50 each Delivery: 15 days
#5

UTP Patch cord 3M

cat 6a utp 3m length rj45 8p8c 24awg stranded 10gbps

600 each Delivery: 15 days
#6

UTP Patch cord 1M

cat 6a utp 1m length rj45 8p8c 24awg stranded 10gbps

600 each Delivery: 15 days
#7

Fiber junction box TJB box 24 core

24fibers CRCA ABS material 24 fibers

30 each Delivery: 15 days
#8

Fiber junction Box 48 Core

24fibers CRCA ABS material 48 fibers

7 each Delivery: 15 days
#9

LIU 24 Port FDF

19inch 1U 24 LC or SC 1tray and 24 fibers CRCA steel

30 each Delivery: 15 days
#10

LIU 48 Port FDF

19inch 1U 24 LC or SC 1tray and 48 fibers CRCA steel

12 each Delivery: 15 days
#11

Optical fibre cable Single Mode

Fiber G652D or G657A1 9 125um intsl duct or tray

6,000 meter Delivery: 15 days
#12

PVC Conduit pipe 40 mm

PVC conduit pipe 25mm with assemling accessories Rigid PVC 25mm wall thcknes 3mm

5,000 meter Delivery: 15 days
#13

GI Pipe 40mm

Mild steel hot dip galvanized 3mm 6m length

500 meter Delivery: 15 days
#14

HDPE Pipe

PE100 20 to 1200mm 6 to 12m lenth

5,500 meter Delivery: 15 days
#15

RJ 45cat VI connectors 2000pcs

type 8P8C modular plug Cat 6A or 6

2,000 each Delivery: 15 days
#16

Batteries stands 17 inch x 9inch

Mild steel made of iron for placing of batteries

30 each Delivery: 15 days
#17

Jack panel 24port cat 6a

19 inch 1U ports 24RJ45 cat 6A Fixing of jack panel 24 port and punching of cat 6 A UTP with Input Output boxes

30 each Delivery: 90 days
#18

Open rack 42U

Open frame 4post rack ht 42U width 19inch Depth 600to 122 mm CRCA steel

1 each Delivery: 15 days
#19

LC LC OFC patch cord

Duplex Lc LC fiber single mode G652D

150 each Delivery: 15 days
#20

LC LC patch cord

Tpe Duplex LC LC

200 each Delivery: 15 days
#21

FDF Rack

rack type 19 inch CRCA steel 24 or 48 or 96 ports

2 each Delivery: 15 days
#22

Laying of cat6A UTP cable and associate fixtures

Laying of OFC 24 core throgh PVC conduit, fixing and lableing

30,000 meter Delivery: 90 days
#23

Jack panel 24 port Cat 6 A loaded with dust cover input out fixing

Jack Panel 24 port cat 6 A fully loaded with dust cover

32 each Delivery: 90 days
#24

Digging and laying of 24 Core OFC and fixing LIU splicing and testing

digging and laying of OFC 24 core through HDPE pipe in hard and soft soil

1,500 meter Delivery: 90 days
#25

Laying of OFC 24 core OFC and fixing of Fiber TJB 24 48

Laying of OFC 24 core throgh PVC conduit, fixing and lableing

4,500 meter Delivery: 90 days
#26

Casing and capping 25mm batten

all the items reqd for same

30,000 meter Delivery: 90 days

Corrigendum Updates

1 Update
#1

Update

07-Apr-2026

Extended Deadline

10-Apr-2026, 2:00 pm

Opening Date

10-Apr-2026, 2:30 pm

Reverse Auction Schedule

Completed

Start

09-Jul-2026, 3:00 pm

End

11-Jul-2026, 3:00 pm

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-10-04-2026 01:35:05
2
**********   Under PMA
-21-03-2026 16:09:44
3
**********   Under PMA
-07-04-2026 17:00:07
4
**********   Under PMA
-10-04-2026 12:06:21
5
**********   Under PMA
-08-04-2026 12:18:41
6
**********   Under PMA
-08-04-2026 23:07:15
7
**********   Under PMA
-09-04-2026 11:51:39
8
**********   Under PMA
-05-04-2026 15:43:41
9
**********   Under PMA
-07-04-2026 17:37:51
10
**********   Under PMA
-10-04-2026 10:25:31
11
**********   Under PMA
-10-04-2026 12:45:05
12
**********   Under PMA
-07-04-2026 19:38:07
13
**********   Under PMA
-04-04-2026 12:35:41
14
**********   Under PMA
-04-04-2026 12:52:37
15
**********   Under PMA
-09-04-2026 12:06:58
16
**********   Under PMA
-02-04-2026 18:52:41
17
**********   Under PMA
-03-04-2026 14:08:03
18
**********   Under PMA
-09-04-2026 11:23:41
19
**********   Under PMA
-07-04-2026 12:50:10
20
**********   Under PMA
-10-04-2026 00:01:46