TenderDekho Logo
GEM

Indian Army Off-Grid Solar PV Power Plant Tender Ajmer Rajasthan 2026 – PCU Inverter, PV Module, 25% Quantity Variation

Bid Publish Date

17-Mar-2026, 8:40 pm

Bid End Date

20-Mar-2026, 9:00 pm

Value

₹1,00,000

Progress

Issue17-Mar-2026, 8:40 pm
Technical20-03-2026 17:24:07
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Categories 5

Tender Overview

The Indian Army, Department of Military Affairs, invites bids for an Off-Grid Solar Photovoltaic Power Plant (V2) in Ajmer, Rajasthan. Estimated value is ₹100,000.00, with no BOQ items reported. The procurement focuses on a complete solar power system comprising PV modules, a Power Conditioning Unit (PCU)/inverter, and associated charging technology. Location: Ajmer, Rajasthan 305001. Key evaluation factors include compliance with the required PV power plant capacity and module specifications, plus the supplier’s ability to deliver under the option clause for fluctuating quantities. This tender emphasizes reliable solar generation for field operations and can involve phased delivery subject to order variation. Unique aspect: absence of BOQ items suggests flexible, project-scoped equipment and integration.

Technical Specifications & Requirements

  • Category: PV Module – Type of Solar Module to be supplied
  • Category: PV Module – Rated power of PV module (in Wp) – minimum value specified in tender
  • Category: Power Conditioning Unit (PCU)/ Solar Inverter – Rated Power (in kVA; inverter rating)
  • Category: PCU – Charger technology to be used in the system
  • Capacity and exact specifications are to be defined per project scope and may be confirmed during contract finalization
  • All components must align with field-operable, off-grid solar configurations suitable for military use

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease order quantity up to 25% of bid quantity at contract placement and during currency at contracted rates
  • Delivery period adjustments apply as per the option clause, with minimum extension rules and calculations based on original quantities
  • EMD details are not specified in the available data; bidders should prepare standard bid security as per organization policy
  • Compliance with delivery timelines and performance commitments will be verified during contract execution
  • Bidders must adhere to security and procurement procedures typical for defense-related solar installations

Key Specifications

    • Product/service category: Off-Grid Solar Photovoltaic Power Plant (V2) for Army use
    • Key components: PV modules, PCU/inverter, charger technology
    • Capacity indicators: capacity of power plant (kVA) to be defined per project scope
    • PV module indicators: type and minimum rated power (Wp) as specified by project
    • PCU indicators: rated power (kVA) and inverter specifications
    • Standards/certifications: not explicitly listed in available data; require confirmation during tender evaluation

Terms & Conditions

  • Option clause allows ±25% quantity fluctuation during contract period

  • Delivery period adjustments align with extended quantity orders and original delivery window

  • EMD and exact delivery timelines are not specified in the provided tender excerpt

Important Clauses

Payment Terms

Not detailed in provided data; standard defense procurement terms to apply; confirm with contract

Delivery Schedule

Delivery period linked to the last date of the original delivery order; extended delivery if quantity increases per option clause

Penalties/Liquidated Damages

Not specified in data; typical contract would include LD for delays; verify in final terms

Bidder Eligibility

  • Experience in supplying off-grid solar PV systems for government/defense entities

  • Financial stability with verifiable turnover and bid security readiness

  • Ability to meet delivery timelines and comply with option-variation provisions

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3)

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9135714.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Generic Capacity of power plant (kVA) 2
PV Module Type of Solar Module Crystalline Silicon Terrestrial Photovoltaic (PV) modules conforming to IS 14286 IS/IEC 61730 -1 IS/IEC 61730 -2
PV Module Rated power of PV module (in Wp) - Minimum 5000
Power Conditioning Unit (PCU)/ Solar Inverter Rated Power (in kVA) (Hint: Inverter Rating) 2.0
Power Conditioning Unit (PCU)/ Solar Inverter Charger technology MPPT

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar off-grid solar power plant deployments

4

Financial statements or annual turnover evidence

5

EMD/Security deposit documentation or alternative bid security as per policy

6

Technical bid documents outlining PV modules, PCU/inverter specifications, and charger technology

7

OEM authorizations or supplier certifications for solar components

8

Any security clearances or approvals required by the Indian Army procurement process

Technical Results

S.No Seller Item Date Status
1
JAGDAMBA ENTERPRISES   Under PMA
Make : NA Model : PGEPL/2025/2KW20-03-2026 17:24:07
2
OM SHRI JAI HANS NIRWAN ENTERPRISES   Under PMA
Make : NA Model : PGEPL/2025/2KW20-03-2026 20:07:37
3
Shri Mahalaxmi Enterprises   Under PMA
Make : NA Model : PGEPL/2025/2KW19-03-2026 21:47:27

Financial Results

Rank Seller Price Item
L1
JAGDAMBA ENTERPRISES   Under PMA
Item Categories : Off - Grid Solar Photovoltaic (PV) Power Plant (V2)
L2
OM SHRI JAI HANS NIRWAN ENTERPRISES   Under PMA
Item Categories : Off - Grid Solar Photovoltaic (PV) Power Plant (V2)
L3
Shri Mahalaxmi Enterprises   Under PMA
Item Categories : Off - Grid Solar Photovoltaic (PV) Power Plant (V2)

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for the Indian Army off-grid solar tender in Ajmer?

Bidders should prepare GST registration, PAN, experience certificates for similar projects, financial statements, EMD documents, and technical bids outlining PV modules, PCU ratings, and charger technology. Ensure compliance with the option clause for quantity fluctuations up to 25% and confirm delivery timelines during contract finalization.

What documents are required for the Ajmer solar bid in 2026?

Required documents include GST certificate, PAN card, experience certificates for off-grid solar deployments, financial statements, bid security/EMD, OEM authorizations, and detailed technical specifications for PV modules and PCU/inverter. Prepare OEM warranties and installation credentials where applicable.

What are the technical specifications for PV modules and PCU in this tender?

Tender specifies category: PV Module with specified Type and minimum Rated Power (Wp) and PCU with Rated Power in kVA plus charger technology. Exact wattage and inverter ratings are project-defined; bidders must submit compliant module types, inverters, and charger tech that meet field-operability for defense use.

When is delivery expected after contract award for the Ajmer plant?

Delivery timing follows the original delivery order date with possible extensions under the option clause; additional time is calculated as ( Increased quantity ÷ Original quantity ) × Original delivery period, with a minimum of 30 days.

What is the minimum scope for capacity in this off-grid solar tender?

The tender lists capacity of power plant (kVA) as a key metric, but the exact value is project-defined. Bidders should propose a complete off-grid solar system matching military needs, including modules and PCU ratings aligned to the required kVA capacity.

What are the penalty implications for delivery delays in this tender?

Penalties or liquidated damages are not explicitly specified in the available data. Prospective bidders should seek confirmation on LD terms, measurement milestones, and cure periods during contract finalization, and ensure their bids include realistic delivery schedules.