TenderDekho Logo
GEM

Nlc Tamil Nadu Power Limited Metso Slurry Pump Components Tender 2026 Tamil Nadu - IS 550/ISI Compliance 2026

Bid Publish Date

16-Jul-2026, 10:21 am

Bid End Date

27-Jul-2026, 11:00 am

Location

TUTICORIN , TAMIL NADU

Progress

Issue16-Jul-2026, 10:21 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

103

Category

ST030040092 METSO SLURRY PUMP CASING ITEM 8 PART NO-PDCH2176

Bid Type

Two Packet Bid

Key Highlights

  • Interchangeability certificate required for all Metso slurry pump components
  • Interchangeable with NTPL site equipment; free replacement if non-interchangeable
  • 25% quantity uplift option during/after contract, at contracted rates
  • 45 days payment terms from delivery; TReDS payments for MSMEs
  • Pre-dispatch inspection at seller site or post-receipt inspection at NTPL stores
  • Supply-only scope; no service components; OEM-specific Metso parts
  • GSTIN, PAN, cancelled cheque and EFT mandate required with bid
  • Part numbers list includes PDCH2176, PDCH2178, PD721041, 507094-S5, 236580-1, 289.3X5.7, 380.37X6.99, 236575-3, 501476-1, etc.

Categories 55

Tender Overview

Nlc Tamil Nadu Power Limited invites bids for a focused package of Metso slurry pump components including Casing (PDCH2176), Impeller (PDCH2178), Back Liner VSMM 200 L150 (PD721041), BOLT KIT FR400 ISO4014-M20X100 8.8 (507094-S5), Gaskets and O-Rings (236580-1, 289.3X5.7; 380.37X6.99 NBR70), Shaft (VSHM-HR150 L150 1.1191), and related accessories with 19 total items. Estimated value and quantity are not disclosed. Deliverables are solely Goods supply for NTPL stores, with an option to increase up to 25% of bid quantity during or after ordering. The contract requires Interchangeability Certificate and 45-day payment terms post-delivery. Location/facility: NTPL stores, Tamil Nadu. Unique terms include pre-dispatch/post-receipt inspection and extended delivery time calculations. This procurement targets OEM-specific Metso parts and mandates ISI/IS 550-compliant or equivalent standards if specified.

Technical Specifications & Requirements

  • Items cover Metso slurry pump spare parts (casing, impeller, back liners, packing, O-rings, seals, bolts, spacers, V-ring, bearings, shafts, housings, and covers).
  • Documents require Interchangeability Certificate with evidence of compatibility with existing NTPL equipment.
  • Buyer terms specify delivery scheduling, with option-based quantity adjustments and a minimum 30-day extension rule when calculating added time.
  • Payment on e-payment within specified terms; MSME payments via TReDS platform. Inspection options include pre-dispatch (seller premises) or post-receipt at NTPL stores.
  • Scope is strictly the supply of goods (no services).
  • Quality/standards mention is implicit; bidders should verify IS/ISO requirements for pump components.

Terms, Conditions & Eligibility

  • EMD/Bid security: Not explicitly disclosed in data; bidders should confirm at ATC stage.
  • Payment terms: 45 days from delivery/appraisal; MSME payments via TReDS.
  • Delivery: Option to increase quantity up to 25%; delivery period linked to last original delivery order; extended time formula provided.
  • Documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate; vendor code creation required.
  • Inspection: Pre-dispatch or post-receipt inspection as per ATC; interchangeability certificate mandatory.
  • Warranty/Guarantee: General warranty guarantees may apply; specifics not fully listed.
  • Interchangeability: Must be interchangeable with NTPL site items or replacement free of cost.
  • ATC Clauses: Standard buyer terms apply; adherence to option clause and delivery schedule mandatory.

Key Specifications

  • Metso slurry pump components list by part numbers (PDCH2176, PDCH2178, PD721041, 501476-1, 507094-S5, 236580-1, 289.3X5.7, 380.37X6.99, 236575-3, VSHM-HR150 L150, V-85S NBR70, etc.)

  • Interchangeability certificate from bidder

  • Delivery of all 19 items as scope; quantity up to +25% allowed

  • Post-delivery payment within 45 days

  • Pre-dispatch or post-receipt inspection arrangements

  • MSME payments via TReDS for eligible bidders

Terms & Conditions

  • Interchangeability certificate mandatory with supply

  • Delivery quantity may increase by up to 25%

  • 45-day payment terms post-delivery

  • Pre-dispatch or post-receipt inspection at NTPL stores

  • PAN, GSTIN, cancelled cheque and EFT mandate required

  • Supply of goods only; no service scope

Important Clauses

Payment Terms

All payments within 45 days from delivery; MSME payments via TReDS; EFT-based payment post-acceptance finalize

Delivery Schedule

Option to increase quantity by up to 25%; delivery time calculated as (additional/original) × original period with a minimum 30 days

Penalties/Liquidated Damages

Not explicitly detailed; likely governed by standard purchase terms; ensure compliance with interchangeability and delivery timelines

Bidder Eligibility

  • Must supply Metso slurry pump components or OEM-equivalent parts

  • Provide Interchangeability certification with NTPL interfaces

  • Possess PAN, GSTIN, and EFT mandate documentation; pass vendor code creation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

ST030040092 METSO SLURRY PUMP CASING ITEM 8 PART NO-PDCH2176 , ST030040096 METSO SLURRY PUMP IMPELLER ITEM 9 PART NO-PDCH2178 , ST030040953 METSO SLURRY PUMP VSMM 200 L150 BACK LINER ITEM 10 PART NO-PD721041 , ST030040996 METSO SLURRY PUMP BACK LINER T-BOLT FR400 ITEM 11 PART NO-501476-1 , ST030040954 METSO SLURRY PUMP VSMM 200 L150 CASE BOLT KIT FR400 ISO4014-M20X100 8.8 ITEM 12 PART NO- 507094-S5 , ST030040955 METSO SLURRY PUMP VSMM 200 L150 PACKING GASKET VASA G 150-100 ITEM 13 PART NO- 236580-1 , ST030040115 METSO SLURRY PUMP OUTLET GASKET ITEM 17 , ST030040956 METSO SLURRY PUMP VSMM 200 L150 O-RING NBR 289.3X5.7 ITEM 44 , ST030040957 METSO SLURRY PUMP VSMM 200 L150 O- RING NBR 380.37X6.99 NBR70 ITEM 45 PART NO-SA983300 , ST030040093 METSO SLURRY PUMP SHAFT VSHM-HR150 L150 1.1191 ITEM 202 PART NO-236575-3 , ST030040101 METSO SLURRY PUMP BEARING FLINGER VS200 ITEM 205 , ST030040958 METSO SLURRY PUMP VSMM 200 L150 SEAL RING-T NBR 160X180X15 ITEM 206 , ST030040959 METSO SLURRY PUMP VSMM 200 L150 SEAL RING-0 NBR 149.3X5.7 ITEM 207 , ST030040960 METSO SLURRY PUMP VSMM 200 L150 KEY ISO 2491B-22X14X120-KIL-T-100-MB20 ITEM 212 , ST030040961 METSO SLURRY PUMP VSMM 200 L150 BEARING HOUSING ITEM 213 , ST030040962 METSO SLURRY PUMP VSMM 200 L150 COVER DE ITEM 214 , ST030040952 METSO SLURRY PUMP VSMM 200 L150 COVER NDE ITEM 215 , ST030040964 METSO SLURRY PUMP VSMM 200 L150 SPACER VS 1.0038 ITEM 217 , ST030040963 METSO SLURRY PUMP VSMM 200 L150 V-RING V-85S NBR70 ITEM 220

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

23

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Tuticorin

Delivery Pincodes

628004

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manivannan Selvaraj628004,NLC TAMILNADU POWER LIMITED 2X500 MW THERMAL POWER PLANT HORBOUR ESTATE, TUTICORINTuticorinTamil Nadu628004190-

Authority Records

MINISTRY OF COAL

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9575358.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

ST030040092 METSO SLURRY PUMP CASING ITEM 8 PART NO-PDCH2176

METSO SLURRY PUMP CASING ITEM 8 PART NO-PDCH2176

1 nos Delivery: 90 days
#2

ST030040096 METSO SLURRY PUMP IMPELLER ITEM 9 PART NO-PDCH2178

METSO SLURRY PUMP IMPELLER ITEM 9 PART NO-PDCH2178

4 nos Delivery: 90 days
#3

ST030040953 METSO SLURRY PUMP VSMM 200 L150 BACK LINER ITEM 10 PART NO-PD721041

METSO SLURRY PUMP VSMM 200 L150 BACK LINER ITEM 10 PART NO-PD721041

4 nos Delivery: 90 days
#4

ST030040996 METSO SLURRY PUMP BACK LINER T-BOLT FR400 ITEM 11 PART NO-501476-1

METSO SLURRY PUMP BACK LINER T-BOLT FR400 ITEM 11 PART NO-501476-1

16 nos Delivery: 90 days
#5

ST030040954 METSO SLURRY PUMP VSMM 200 L150 CASE BOLT KIT FR400 ISO4014-M20X100 8.8 ITEM 12 PART NO-507094-S5

METSO SLURRY PUMP VSMM 200 L150 CASE BOLT KIT FR400 ISO4014-M20X100 8.8 ITEM 12 PART NO-507094-S5

32 nos Delivery: 90 days
#6

ST030040955 METSO SLURRY PUMP VSMM 200 L150 PACKING GASKET VASA G 150-100 ITEM 13 PART NO-236580-1

METSO SLURRY PUMP VSMM 200 L150 PACKING GASKET VASA G 150-100 ITEM 13 PART NO-236580-1

4 nos Delivery: 90 days
#7

ST030040115 METSO SLURRY PUMP OUTLET GASKET ITEM 17

METSO SLURRY PUMP OUTLET GASKET ITEM 17

4 nos Delivery: 90 days
#8

ST030040956 METSO SLURRY PUMP VSMM 200 L150 O-RING NBR 289.3X5.7 ITEM 44

METSO SLURRY PUMP VSMM 200 L150 O-RING NBR 289.3X5.7 ITEM 44

4 nos Delivery: 90 days
#9

ST030040957 METSO SLURRY PUMP VSMM 200 L150 O-RING NBR 380.37X6.99 NBR70 ITEM 45 PART NO-SA983300

METSO SLURRY PUMP VSMM 200 L150 O-RING NBR 380.37X6.99 NBR70 ITEM 45 PART NO-SA983300

4 nos Delivery: 90 days
#10

ST030040093 METSO SLURRY PUMP SHAFT VSHM-HR150 L150 1.1191 ITEM 202 PART NO-236575-3

METSO SLURRY PUMP SHAFT VSHM-HR150 L150 1.1191 ITEM 202 PART NO-236575-3

1 nos Delivery: 90 days
#11

ST030040101 METSO SLURRY PUMP BEARING FLINGER VS200 ITEM 205

METSO SLURRY PUMP BEARING FLINGER VS200 ITEM 205

4 nos Delivery: 90 days
#12

ST030040958 METSO SLURRY PUMP VSMM 200 L150 SEAL RING-T NBR 160X180X15 ITEM 206

METSO SLURRY PUMP VSMM 200 L150 SEAL RING-T NBR 160X180X15 ITEM 206

4 nos Delivery: 90 days
#13

ST030040959 METSO SLURRY PUMP VSMM 200 L150 SEAL RING-0 NBR 149.3X5.7 ITEM 207

METSO SLURRY PUMP VSMM 200 L150 SEAL RING-0 NBR 149.3X5.7 ITEM 207

4 nos Delivery: 90 days
#14

ST030040960 METSO SLURRY PUMP VSMM 200 L150 KEY ISO 2491B-22X14X120-KIL-T-100-MB20 ITEM 212

METSO SLURRY PUMP VSMM 200 L150 KEY ISO 2491B-22X14X120-KIL-T-100-MB20 ITEM 212

2 nos Delivery: 90 days
#15

ST030040961 METSO SLURRY PUMP VSMM 200 L150 BEARING HOUSING ITEM 213

METSO SLURRY PUMP VSMM 200 L150 BEARING HOUSING ITEM 213

1 nos Delivery: 90 days
#16

ST030040962 METSO SLURRY PUMP VSMM 200 L150 COVER DE ITEM 214

METSO SLURRY PUMP VSMM 200 L150 COVER DE ITEM 214

4 nos Delivery: 90 days
#17

ST030040952 METSO SLURRY PUMP VSMM 200 L150 COVER NDE ITEM 215

METSO SLURRY PUMP VSMM 200 L150 COVER NDE ITEM 215

4 nos Delivery: 90 days
#18

ST030040964 METSO SLURRY PUMP VSMM 200 L150 SPACER VS 1.0038 ITEM 217

METSO SLURRY PUMP VSMM 200 L150 SPACER VS 1.0038 ITEM 217

2 nos Delivery: 90 days
#19

ST030040963 METSO SLURRY PUMP VSMM 200 L150 V-RING V-85S NBR70 ITEM 220

METSO SLURRY PUMP VSMM 200 L150 V-RING V-85S NBR70 ITEM 220

4 nos Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

Vendor code creation documents

6

Interchangeability certificate (at supply time)

7

Technical bid documents confirming product alignment with listed part numbers

8

OEM authorization (if required for Metso parts)

Frequently Asked Questions

How to bid for Metso slurry pump components tender in Tamil Nadu 2026

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate along with bid; provide Interchangeability certificate, OEM authorization if required, and technical compliance for listed part numbers (PDCH2176, PDCH2178, PD721041, 501476-1, 507094-S5, etc.). Ensure supply-only scope and adherence to NTPL inspection terms.

What documents are required for NTPL Metso pump parts procurement in 2026

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and vendor code creation documents; also submit Interchangeability certificate and OEM authorizations for Metso parts where applicable, plus technical bids covering part numbers.

What are the delivery terms for NTPL slurry pump components tender in Tamil Nadu

Delivery terms allow up to 25% quantity increase; delivery period starts from the last date of original delivery order. Extended time applies per (additional/ original) × original period, minimum 30 days. Ensure on-time delivery to NTPL stores with pre/post-inspection as applicable.

Which standards or certifications are required for Metso parts supply

Interchangeability certificate is mandatory; ensure components meet OEM specifications and any IS/ISO compliance applicable to Metso slurry pump spare parts. Confirm IS 550 or equivalent standards with suppliers' documentation and quality certificates.

What is the payment timeline for NTPL pump spare parts bid

Payments are due within 45 days from the appointed delivery/acceptance date. MSME payments should be routed via the TReDS platform; ensure all required guarantees, such as performance and warranty, are in place prior to payment processing.

How to verify interchangeability for Metso pump components in NTPL project

Submit an Interchangeability Certificate proving compatibility with NTPL’s existing pump assemblies. If the parts fail interchangeability, the supplier must replace at no cost. Include part numbers like PDCH2176, PDCH2178, PD721041 in the certificate.

What is the scope of supply for the NTPL slurry pump procurement

The scope is strictly the supply of Goods for 19 items, including casings, impellers, back liners, gaskets, seals, bolts, spacers, shafts, and housings. No service contracts are included; components must be OEM-aligned with specified part numbers.

What is the role of pre-dispatch vs post-receipt inspection in this tender

Inspection can be either pre-dispatch at the seller premises or post-receipt at NTPL stores, as per ATC. Pre-dispatch inspection validates conformity before shipment; post-receipt checks ensure delivered items match orders and are in serviceable condition.