Progress
Organization: Indian Army (Department Of Military Affairs). Procurement: supply of electrical components including Panel Board, MCB 32 AMP 3 Pile, Switch Rotary, BTY Terminal, and Insulation Tape. Scope: purely the supply of goods; no installation services indicated. Location: not specified in the data; bidders should verify site details. Estimated value: not disclosed. Unique aspect lies in the inclusion of an option clause allowing quantity adjustments up to ±25% during contract execution, with extended delivery timelines calculated per formula. Acknowledgement of pre-dispatch sample submission required for technical bid evaluation. This tender emphasizes non-obsolete items with at least 1 year of residual market life as a consideration for bid viability.
Product names: Panel Board; MCB 32 AMP 3 PILE; Rotary Switch; BTY Terminal; Insulation Tape
No explicit quantitative BOQ items; no estimated value disclosed
Pre-dispatch sample requirement: 01 sample submitted one day prior to technical bid opening
Inspection: post-receipt site inspection for bulk supply against approved sample
Quality/obsolescence: items must have at least 1 year residual market life
Quantity may vary by ±25% with revised delivery timelines
Only supply of goods; no installation services included
Submit PAN, GSTN, cancelled cheque, and EFT mandate with bid
GST will be reimbursed per actuals or lower applicable rate; bidder covers GST under quoted percentage
Delivery period linked to option clause; original and extended periods defined by quantity variation formula
Details not provided; contract may include LDs per standard government terms; refer ATC for specifics
No liquidation or bankruptcy proceedings; provide undertaking
Items offered must be not end-of-life with 1 year residual market life
GST registration and PAN compliance required; GST must align with applicable rates
Quantity
36
Category
PANEL BOARD
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PANEL BOARD , MCB 32 AMP 3 PILE , SWITCH ROTARY , BTY TERMINAL , INSULATION TAPE
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Dimapur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Dimapur | Dimapur | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate (bank-certified) copy
Undertaking on financial standing (non-liquidation/bankruptcy)
Evidence of not end-of-life status for offered items
Any OEM authorization or product certificates if applicable
Key insights about NAGALAND tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and bank-certified EFT Mandate with bid. Provide undertaking of financial stability and ensure offered items have at least 1 year residual market life. Include pre-dispatch sample and align with option clause allowing ±25% quantity changes.
Required documents include PAN card copy, GSTIN copy, cancelled cheque, EFT Mandate, financial stability undertaking, OEM authorizations if applicable, and evidence of not being under liquidation. Ensure items are not end-of-life and provide relevant product certifications if available.
The tender specifies the goods: Panel Board, MCB 32 AMP 3 PILE, Rotary Switch, BTY Terminal, and Insulation Tape. No explicit performance metrics or IS standards are listed; bidders should confirm OEM data sheets and ensure conformity with Army procurement requirements.
Delivery timelines are tied to the original and extended periods via the option clause. If quantity increases, the additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; the purchaser may extend to the original delivery period.
Inspection includes a pre-dispatch sample submission (1 sample, 1 day before technical bid opening) and post-receipt inspection at the consignee site for bulk supply, with acceptance based on the approved sample.
Bidders must determine GST applicability themselves; reimbursement will be at actuals or the lower applicable rate, capped by the quoted GST percentage. Ensure GSTIN is active and matches bid documentation.
Eligibility requires no liquidation, 1 year residual life for offered items, GST and PAN compliance, and submission of EFT Mandate. Also, maintain product availability and avoid end-of-life status per OEM guidance.
A pre-dispatch sample (one unit) must be submitted before technical bid opening. The bulk order will be evaluated against this sample; failure to supply an approved sample can disqualify the bid.