Bid Publish Date
25-Apr-2026, 11:57 am
Bid End Date
02-Jun-2026, 1:00 pm
Value
₹1,76,225
Location
Progress
Quantity
7
Category
Load Cell for Leotronics make 60 Ton weighbridge System.
Bid Type
Two Packet Bid
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow, seeks procurement of a Load Cell for Leotronics make 60 Ton weighbridge System and a Junction Box for PVC Casing and Caping for installation at the Sonbhadra, Uttar Pradesh, 231205 site. Estimated value: ₹176,225. Quantity is subject to a 25% increase/decrease at contract placement and during the contract term at contracted rates. No BOQ items are listed, and delivery timing follows standard option clauses. This tender requires bidders to adhere to the option-based delivery extension rules and conform to internal UP electricity department procurement practices.
Key differentiator includes the explicit option clause for quantity variation up to 25% and the need to supply components compatible with a Leotronics 60 Ton weighbridge system. Tender lacks technical specifications in the data provided, signaling bidders must rely on specific Leotronics compatibility and site installation readiness.
This opportunity is positioned under the UP electricity sector’s equipment procurement for weighbridge instrumentation, with a focus on precise load-cell and junction box components suitable for heavy-vehicle weighing systems in a state-owned energy context.
Load Cell: Leotronics make, 60 Ton capacity
Junction Box: PVC Casing and Caping
Estimated value: ₹176,225
BOQ: 0 items listed
Delivery: option-based with up to 25% quantity variation
No technical standards listed in data; verify compatibility with Leotronics weighbridge system
Option clause allows ±25% quantity variation at contract placement and during currency
Delivery period adjustments follow specified formula with minimum 30 days
EMD and payment terms are not disclosed in data; refer to ATC document
Details not provided in tender data; verify in ATC/contract terms and alignment with UP electricity department norms
Delivery period to commence from the last date of original delivery order; extended time proportional to quantity variation with minimum 30 days
Not specified in data; confirm LD clauses in ATC or contract terms
Experience in supplying weighbridge instrumentation or related heavy-vehicle measurement systems
Financial capacity evidenced by balanced statements
OEM authorization for Leotronics components and capability to supply PVC junction boxes
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Load Cell for Leotronics make 60 Ton weighbridge System. , Junction Box for PVC Casing and Caping
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar weighbridge/industrial instrumentation
Financial statements to demonstrate solvency
EMD submission proof (if specified in ATC)
Technical bid/ compliance certificates for Load Cell and Junction Box
OEM authorization for Leotronics components
Delivery and installation capability documentation
Extended Deadline
02-Jun-2026, 1:00 pm
Opening Date
02-Jun-2026, 1:30 pm
Extended Deadline
28-May-2026, 1:00 pm
Opening Date
28-May-2026, 1:30 pm
Extended Deadline
21-May-2026, 1:00 pm
Opening Date
21-May-2026, 1:30 pm
Extended Deadline
16-May-2026, 1:00 pm
Opening Date
16-May-2026, 1:30 pm
Key insights about UTTAR PRADESH tender market
Bidders should submit the standard vendor documents (GST, PAN, experience, financials) along with OEM authorization for Leotronics components. Ensure compliance with the 25% quantity variation clause and reference the ATC for delivery and payment terms. Prepare installation readiness for a 60 Ton weighbridge system.
Required documents include GST certificate, PAN, experience certificates for similar weighbridge supplies, financial statements, EMD proof (if applicable), technical compliance certificates, OEM authorizations for Leotronics, and installation capability evidence for PVC junction boxes.
Scope covers a Leotronics-made load cell with 60 Ton capacity and a PVC junction box assembly for casing and caping, intended for integration with a Leotronics weighbridge system at the Sonbhadra site; no BOQ items listed in data.
Delivery can be extended by up to 25% of bid quantity during contract placement and currency. The additional time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Payment terms are not provided in the data; bidders must consult the ATC document to confirm milestones, interim payments, and any advance payment conditions tied to Leotronics components delivery.
The tender data does not specify IS/ISO standards; bidders should verify Leotronics compatibility and ensure welding, mounting, and electrical integration meet site-specific UP electricity department practices.