Bid Publish Date
23-Jun-2025, 3:30 pm
Bid End Date
14-Jul-2025, 4:00 pm
EMD
₹40,000
Value
₹8,00,000
Location
Progress
Quantity
812
Category
Removing of existing compactor storage unit and related works
Bid Type
Two Packet Bid
Central Board Of Excise And Customs (cbec) announces a tender for Removing of existing compactor storage unit and related works, 3 Work station on the Right Side in the 8th Floor Corridor, 4 work station on the Left Side in the 8th Floor Corridor, 5th Floor - Alternation of cubicle number 5AC -02, Work station in Compactor room 5A-12, Work station near storage room, Alternation of cubical 5AC-06, Alternation of cubical 5AC-07, Alternation of cubical 5AC-08 in CHENNAI, TAMIL NADU. Quantity: 812. Submission Deadline: 14-07-2025 16: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Removing of existing compactor storage unit and related works , 3 Work station on the Right Side in the 8th Floor Corridor , 4 work station on the Left Side in the 8th Floor Corridor , 5th Floor - Alternation of cubicle number 5AC -02 , Work station in Compactor room 5A-12 , Work station near storage room , Alternation of cubical 5AC-06 , Alternation of cubical 5AC-07 , Alternation of cubical 5AC-08
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Removing of existing compactor storage unit and related works
Removing of exisiting compactor storage unit with proper manner and transport the unit at officer instruction and reassemble the entire unit with proper plum, moving cupboards, allignment with all related works and necessary hardwares etc.
3 Work station on the Right Side in the 8th Floor Corridor
Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with all related works etc. 5-15 Amps socket 3 5amps socket along with control - 2 sets, 15 amps master switch-1 nos,
3 Work station on the Right Side in the 8th Floor Corridor
Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. Schneider make
3 Work station on the Right Side in the 8th Floor Corridor
Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make
3 Work station on the Right Side in the 8th Floor Corridor
Partition work - Supply of 2.5 inch by inch heavy duty powder coated aluminium channel frame work top of that 12mm plywood finishing with laminate 6mm Tf glass fixing both the side along with frosted sticker support from true slab alter the grid ceiling changed damaged ceiling tiles with all related works etc.
3 Work station on the Right Side in the 8th Floor Corridor
Supply of running type work station. Using of 3 inch partition 2 by 2 aluminium frame work top of that 12mm ply with laminate finish along with running table 5 feet 0 by 2.5 feet by 2.5 feet 19mm ply and all related works etc.as per specification of required fixtures
4 work station on the Left Side in the 8th Floor Corridor
Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures
4 work station on the Left Side in the 8th Floor Corridor
Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc.-Schneider make
4 work station on the Left Side in the 8th Floor Corridor
Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make
4 work station on the Left Side in the 8th Floor Corridor
Light fixtures Supply of 2feet by 2feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling
4 work station on the Left Side in the 8th Floor Corridor
Partition work Supply of 2.5 inch by 2inch heavy duty powder coated aluminium channel frame work all related works etc.as per specification of required fixtures
4 work station on the Left Side in the 8th Floor Corridor
Supply of Cubical type work station. and all related works etc.as per specification of required fixtures
5th Floor - Alternation of cubicle number 5AC -02
Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures
5th Floor - Alternation of cubicle number 5AC -02
Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. - Schneider make
5th Floor - Alternation of cubicle number 5AC -02
Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. - Schneider make
5th Floor - Alternation of cubicle number 5AC -02
Xerox machine Point relocation- Supply of 3 runs 2.5 sqmm cable from Ups DB and relocate xerox machine location 15 amps 2 nos plug point along with proper earth work with and all related works etc.as per specification of required fixtures
5th Floor - Alternation of cubicle number 5AC -02
Table work Providing and fixing of 6 feet 0 inch table along with one pedestal unit and all related works etc.as per specification of required fixtures
Work station in Compactor room 5A-12
Work station Supply of cubical type work station. and all related works etc.as per specification of required fixtures
Work station in Compactor room 5A-12
Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures
Work station in Compactor room 5A-12
Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. -Schneider make
Work station in Compactor room 5A-12
Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. - Schneider make
Work station in Compactor room 5A-12
Light fixtures Supply of 2 feet by 2 feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling etc
Work station in Compactor room 5A-12
Painting work Scrap and removing of existing painting and apply 2 coats wall putty one coat primer 2 or more coats Asian Royal emulsion with all related works etc.
Work station near storage room
Work station Supply of cubical type work station. Using of 3 inch partition 2 by 2 aluminium frame work top of that 12mm ply with laminate finish along with running table 5 feet by 2 feet by 2 feet inch 19mm ply and all related works etc.as per specification of required fixtures
Work station near storage room
Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same and all related works etc.as per specification of required fixtures
Work station near storage room
Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. Schneider make
Work station near storage room
Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make
Work station near storage room
Light fixtures Supply of 2 feet by 2 feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling etc
Work station near storage room
Painting work Scrap and removing of existing painting and apply 2 coats wall putty one coat primer 2 or more coats Asian Royal emulsion with all related works etc.
Alternation of cubical 5AC-06
Table work Providing and fixing of 5 feet table along with one pedestal unit and all related works etc.as per specification of required fixtures
Alternation of cubical 5AC-07
Partition work Supply of 2. inch by inch heavy duty powder coated aluminium channel frame work top of that 12mm plywood finishing with laminate 6mm Tf glass and all related works etc.
Alternation of cubical 5AC-08
Alter for electrical, data & voice port based on the new layout with all related works etc.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Removing of existing compactor storage unit and related works | Removing of exisiting compactor storage unit with proper manner and transport the unit at officer instruction and reassemble the entire unit with proper plum, moving cupboards, allignment with all related works and necessary hardwares etc. | 1 | ls | dgceiczubuyer | 15 | |
| 2 | 3 Work station on the Right Side in the 8th Floor Corridor | Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with all related works etc. 5-15 Amps socket 3 5amps socket along with control - 2 sets, 15 amps master switch-1 nos, | 3 | numbers | dgceiczubuyer | 15 | |
| 3 | 3 Work station on the Right Side in the 8th Floor Corridor | Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. Schneider make | 6 | numbers | dgceiczubuyer | 15 | |
| 4 | 3 Work station on the Right Side in the 8th Floor Corridor | Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make | 3 | numbers | dgceiczubuyer | 15 | |
| 5 | 3 Work station on the Right Side in the 8th Floor Corridor | Partition work - Supply of 2.5 inch by inch heavy duty powder coated aluminium channel frame work top of that 12mm plywood finishing with laminate 6mm Tf glass fixing both the side along with frosted sticker support from true slab alter the grid ceiling changed damaged ceiling tiles with all related works etc. | 95 | sqft | dgceiczubuyer | 15 | |
| 6 | 3 Work station on the Right Side in the 8th Floor Corridor | Supply of running type work station. Using of 3 inch partition 2 by 2 aluminium frame work top of that 12mm ply with laminate finish along with running table 5 feet 0 by 2.5 feet by 2.5 feet 19mm ply and all related works etc.as per specification of required fixtures | 3 | numbers | dgceiczubuyer | 15 | |
| 7 | 4 work station on the Left Side in the 8th Floor Corridor | Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures | 12 | numbers | dgceiczubuyer | 15 | |
| 8 | 4 work station on the Left Side in the 8th Floor Corridor | Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc.-Schneider make | 8 | numbers | dgceiczubuyer | 15 | |
| 9 | 4 work station on the Left Side in the 8th Floor Corridor | Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make | 4 | numbers | dgceiczubuyer | 15 | |
| 10 | 4 work station on the Left Side in the 8th Floor Corridor | Light fixtures Supply of 2feet by 2feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling | 4 | numbers | dgceiczubuyer | 15 | |
| 11 | 4 work station on the Left Side in the 8th Floor Corridor | Partition work Supply of 2.5 inch by 2inch heavy duty powder coated aluminium channel frame work all related works etc.as per specification of required fixtures | 70 | sqft | dgceiczubuyer | 15 | |
| 12 | 4 work station on the Left Side in the 8th Floor Corridor | Supply of Cubical type work station. and all related works etc.as per specification of required fixtures | 4 | numbers | dgceiczubuyer | 15 | |
| 13 | 5th Floor - Alternation of cubicle number 5AC -02 | Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures | 2 | numbers | dgceiczubuyer | 15 | |
| 14 | 5th Floor - Alternation of cubicle number 5AC -02 | Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. - Schneider make | 4 | numbers | dgceiczubuyer | 15 | |
| 15 | 5th Floor - Alternation of cubicle number 5AC -02 | Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. - Schneider make | 2 | numbers | dgceiczubuyer | 15 | |
| 16 | 5th Floor - Alternation of cubicle number 5AC -02 | Xerox machine Point relocation- Supply of 3 runs 2.5 sqmm cable from Ups DB and relocate xerox machine location 15 amps 2 nos plug point along with proper earth work with and all related works etc.as per specification of required fixtures | 2 | numbers | dgceiczubuyer | 15 | |
| 17 | 5th Floor - Alternation of cubicle number 5AC -02 | Table work Providing and fixing of 6 feet 0 inch table along with one pedestal unit and all related works etc.as per specification of required fixtures | 2 | numbers | dgceiczubuyer | 15 | |
| 18 | Work station in Compactor room 5A-12 | Work station Supply of cubical type work station. and all related works etc.as per specification of required fixtures | 7 | numbers | dgceiczubuyer | 15 | |
| 19 | Work station in Compactor room 5A-12 | Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures | 15 | numbers | dgceiczubuyer | 15 | |
| 20 | Work station in Compactor room 5A-12 | Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. -Schneider make | 14 | numbers | dgceiczubuyer | 15 | |
| 21 | Work station in Compactor room 5A-12 | Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. - Schneider make | 7 | numbers | dgceiczubuyer | 15 | |
| 22 | Work station in Compactor room 5A-12 | Light fixtures Supply of 2 feet by 2 feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling etc | 5 | numbers | dgceiczubuyer | 15 | |
| 23 | Work station in Compactor room 5A-12 | Painting work Scrap and removing of existing painting and apply 2 coats wall putty one coat primer 2 or more coats Asian Royal emulsion with all related works etc. | 200 | sqft | dgceiczubuyer | 15 | |
| 24 | Work station near storage room | Work station Supply of cubical type work station. Using of 3 inch partition 2 by 2 aluminium frame work top of that 12mm ply with laminate finish along with running table 5 feet by 2 feet by 2 feet inch 19mm ply and all related works etc.as per specification of required fixtures | 2 | numbers | dgceiczubuyer | 15 | |
| 25 | Work station near storage room | Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same and all related works etc.as per specification of required fixtures | 6 | numbers | dgceiczubuyer | 15 | |
| 26 | Work station near storage room | Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. Schneider make | 4 | numbers | dgceiczubuyer | 15 | |
| 27 | Work station near storage room | Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make | 2 | numbers | dgceiczubuyer | 15 | |
| 28 | Work station near storage room | Light fixtures Supply of 2 feet by 2 feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling etc | 2 | numbers | dgceiczubuyer | 15 | |
| 29 | Work station near storage room | Painting work Scrap and removing of existing painting and apply 2 coats wall putty one coat primer 2 or more coats Asian Royal emulsion with all related works etc. | 250 | sqft | dgceiczubuyer | 15 | |
| 30 | Alternation of cubical 5AC-06 | Table work Providing and fixing of 5 feet table along with one pedestal unit and all related works etc.as per specification of required fixtures | 2 | numbers | dgceiczubuyer | 15 | |
| 31 | Alternation of cubical 5AC-07 | Partition work Supply of 2. inch by inch heavy duty powder coated aluminium channel frame work top of that 12mm plywood finishing with laminate 6mm Tf glass and all related works etc. | 70 | sqft | dgceiczubuyer | 15 | |
| 32 | Alternation of cubical 5AC-08 | Alter for electrical, data & voice port based on the new layout with all related works etc. | 1 | ls | dgceiczubuyer | 15 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | SIGN STAR Under PMA | - | 01-07-2025 20:00:17 | |
| 2 | WAVES INTERIORS Under PMA | - | 03-07-2025 14:57:53 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | WAVES INTERIORS(MII) Under PMA | Item Categories : Removing of existing compactor storage unit and related works,3 Work station on the Right Side in t | |
| L2 | SIGN STAR (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Removing of existing compactor storage unit and related works,3 Work station on the Right Side in t |
Please sign in or create an account to view contract details and download result documents.
Key insights about TAMIL NADU tender market
The eligibility requirements include being a registered entity capable of undertaking construction services, possession of relevant certifications for providing renovation and alteration services, and having experience in executing similar projects under government contracts. This ensures that only qualified bidders can participate, thereby promoting quality work and regulatory compliance.
Bidders need to adhere to strict technical specifications, which include compliance with current safety standards, submission of comprehensive project methodologies, and detailed work plans. The materials proposed for the project must demonstrate durability and utility, ensuring that the final installations meet the industry's quality benchmarks.
Yes, participants must outline their proposed payment terms in their financial submissions, specifying the acceptable modes and any scheduled payment milestones linked to project completion stages, thereby ensuring that financial transactions are clear and mutually agreeable between issued and contractors.
The tender offers specific benefits for Micro, Small, and Medium Enterprises (MSEs), including financial concessions such as lower earnest money deposits and additional points during the evaluation phase, aimed at encouraging their participation and competitiveness in government contracts.
Bids must be submitted electronically via the specified platform for government procurement. All associated documents should be formatted correctly and provide a comprehensive overview of the financial and technical proposals to ensure compliance with submission protocols.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS