Procurement Opportunity: Removing of existing compactor storage unit and related works,3 Work station on the Right Side in t in CHENNAI, TAMIL NADU

Bid Publish Date

23-Jun-2025, 3:30 pm

Bid End Date

14-Jul-2025, 4:00 pm

EMD

₹40,000

Value

₹8,00,000

Progress

Issue23-Jun-2025, 3:30 pm
Technical07-Jan-2025, 8:00 pm
Financial
Award19-Aug-2025, 12:49 am
Explore all 4 tabs to view complete tender details

Quantity

812

Category

Removing of existing compactor storage unit and related works

Bid Type

Two Packet Bid

Categories 46

Central Board Of Excise And Customs (cbec) announces a tender for Removing of existing compactor storage unit and related works, 3 Work station on the Right Side in the 8th Floor Corridor, 4 work station on the Left Side in the 8th Floor Corridor, 5th Floor - Alternation of cubicle number 5AC -02, Work station in Compactor room 5A-12, Work station near storage room, Alternation of cubical 5AC-06, Alternation of cubical 5AC-07, Alternation of cubical 5AC-08 in CHENNAI, TAMIL NADU. Quantity: 812. Submission Deadline: 14-07-2025 16: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Removing of existing compactor storage unit and related works , 3 Work station on the Right Side in the 8th Floor Corridor , 4 work station on the Left Side in the 8th Floor Corridor , 5th Floor - Alternation of cubicle number 5AC -02 , Work station in Compactor room 5A-12 , Work station near storage room , Alternation of cubical 5AC-06 , Alternation of cubical 5AC-07 , Alternation of cubical 5AC-08

Authority Records

MINISTRY OF FINANCEREVENUE DEPARTMENTCENTRAL BOARD OF EXCISE AND CUSTOMS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7999845.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 32 Items Sign in for GEM prices

#1

Removing of existing compactor storage unit and related works

Removing of exisiting compactor storage unit with proper manner and transport the unit at officer instruction and reassemble the entire unit with proper plum, moving cupboards, allignment with all related works and necessary hardwares etc.

1 ls Delivery: 15 days
#2

3 Work station on the Right Side in the 8th Floor Corridor

Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with all related works etc. 5-15 Amps socket 3 5amps socket along with control - 2 sets, 15 amps master switch-1 nos,

3 numbers Delivery: 15 days
#3

3 Work station on the Right Side in the 8th Floor Corridor

Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. Schneider make

6 numbers Delivery: 15 days
#4

3 Work station on the Right Side in the 8th Floor Corridor

Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make

3 numbers Delivery: 15 days
#5

3 Work station on the Right Side in the 8th Floor Corridor

Partition work - Supply of 2.5 inch by inch heavy duty powder coated aluminium channel frame work top of that 12mm plywood finishing with laminate 6mm Tf glass fixing both the side along with frosted sticker support from true slab alter the grid ceiling changed damaged ceiling tiles with all related works etc.

95 sqft Delivery: 15 days
#6

3 Work station on the Right Side in the 8th Floor Corridor

Supply of running type work station. Using of 3 inch partition 2 by 2 aluminium frame work top of that 12mm ply with laminate finish along with running table 5 feet 0 by 2.5 feet by 2.5 feet 19mm ply and all related works etc.as per specification of required fixtures

3 numbers Delivery: 15 days
#7

4 work station on the Left Side in the 8th Floor Corridor

Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures

12 numbers Delivery: 15 days
#8

4 work station on the Left Side in the 8th Floor Corridor

Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc.-Schneider make

8 numbers Delivery: 15 days
#9

4 work station on the Left Side in the 8th Floor Corridor

Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make

4 numbers Delivery: 15 days
#10

4 work station on the Left Side in the 8th Floor Corridor

Light fixtures Supply of 2feet by 2feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling

4 numbers Delivery: 15 days
#11

4 work station on the Left Side in the 8th Floor Corridor

Partition work Supply of 2.5 inch by 2inch heavy duty powder coated aluminium channel frame work all related works etc.as per specification of required fixtures

70 sqft Delivery: 15 days
#12

4 work station on the Left Side in the 8th Floor Corridor

Supply of Cubical type work station. and all related works etc.as per specification of required fixtures

4 numbers Delivery: 15 days
#13

5th Floor - Alternation of cubicle number 5AC -02

Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures

2 numbers Delivery: 15 days
#14

5th Floor - Alternation of cubicle number 5AC -02

Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. - Schneider make

4 numbers Delivery: 15 days
#15

5th Floor - Alternation of cubicle number 5AC -02

Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. - Schneider make

2 numbers Delivery: 15 days
#16

5th Floor - Alternation of cubicle number 5AC -02

Xerox machine Point relocation- Supply of 3 runs 2.5 sqmm cable from Ups DB and relocate xerox machine location 15 amps 2 nos plug point along with proper earth work with and all related works etc.as per specification of required fixtures

2 numbers Delivery: 15 days
#17

5th Floor - Alternation of cubicle number 5AC -02

Table work Providing and fixing of 6 feet 0 inch table along with one pedestal unit and all related works etc.as per specification of required fixtures

2 numbers Delivery: 15 days
#18

Work station in Compactor room 5A-12

Work station Supply of cubical type work station. and all related works etc.as per specification of required fixtures

7 numbers Delivery: 15 days
#19

Work station in Compactor room 5A-12

Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same with and all related works etc.as per specification of required fixtures

15 numbers Delivery: 15 days
#20

Work station in Compactor room 5A-12

Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. -Schneider make

14 numbers Delivery: 15 days
#21

Work station in Compactor room 5A-12

Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. - Schneider make

7 numbers Delivery: 15 days
#22

Work station in Compactor room 5A-12

Light fixtures Supply of 2 feet by 2 feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling etc

5 numbers Delivery: 15 days
#23

Work station in Compactor room 5A-12

Painting work Scrap and removing of existing painting and apply 2 coats wall putty one coat primer 2 or more coats Asian Royal emulsion with all related works etc.

200 sqft Delivery: 15 days
#24

Work station near storage room

Work station Supply of cubical type work station. Using of 3 inch partition 2 by 2 aluminium frame work top of that 12mm ply with laminate finish along with running table 5 feet by 2 feet by 2 feet inch 19mm ply and all related works etc.as per specification of required fixtures

2 numbers Delivery: 15 days
#25

Work station near storage room

Electrical work Supply and laying of 3 runs 2.5 sqmm and 1 run 1 sqmm electrical points from UPS db and Power DB in various cabin with cutting of walls, partitions and false ceiling redoing the same and all related works etc.as per specification of required fixtures

6 numbers Delivery: 15 days
#26

Work station near storage room

Data work Supply and laying of CAT-6 cable from server room in various cabins with cutting of walls, partition and false ceiling redoing the same with all related works etc. Schneider make

4 numbers Delivery: 15 days
#27

Work station near storage room

Voice Port work Supply of telephone cable from server room to various cabins with cutting of walls, partition and false ceiling and redoing the same with all related works etc. Schneider make

2 numbers Delivery: 15 days
#28

Work station near storage room

Light fixtures Supply of 2 feet by 2 feet ceiling lights with separate control switches for Ups and Raw power. Lights 2 years warranty. Rate includes of cutting and redoing the partition, wall and false ceiling etc

2 numbers Delivery: 15 days
#29

Work station near storage room

Painting work Scrap and removing of existing painting and apply 2 coats wall putty one coat primer 2 or more coats Asian Royal emulsion with all related works etc.

250 sqft Delivery: 15 days
#30

Alternation of cubical 5AC-06

Table work Providing and fixing of 5 feet table along with one pedestal unit and all related works etc.as per specification of required fixtures

2 numbers Delivery: 15 days
#31

Alternation of cubical 5AC-07

Partition work Supply of 2. inch by inch heavy duty powder coated aluminium channel frame work top of that 12mm plywood finishing with laminate 6mm Tf glass and all related works etc.

70 sqft Delivery: 15 days
#32

Alternation of cubical 5AC-08

Alter for electrical, data & voice port based on the new layout with all related works etc.

1 ls Delivery: 15 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
SIGN STAR   Under PMA
-01-07-2025 20:00:17
2
WAVES INTERIORS   Under PMA
-03-07-2025 14:57:53

Financial Results

Rank Seller Price Item
L1
WAVES INTERIORS(MII)   Under PMA
Item Categories : Removing of existing compactor storage unit and related works,3 Work station on the Right Side in t
L2
SIGN STAR (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Removing of existing compactor storage unit and related works,3 Work station on the Right Side in t

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about TAMIL NADU tender market

What are the eligibility requirements for the OFFICE PARTITION AND ALTERATION tender?

The eligibility requirements include being a registered entity capable of undertaking construction services, possession of relevant certifications for providing renovation and alteration services, and having experience in executing similar projects under government contracts. This ensures that only qualified bidders can participate, thereby promoting quality work and regulatory compliance.

What technical specifications must be met for the OFFICE PARTITION AND ALTERATION tender?

Bidders need to adhere to strict technical specifications, which include compliance with current safety standards, submission of comprehensive project methodologies, and detailed work plans. The materials proposed for the project must demonstrate durability and utility, ensuring that the final installations meet the industry's quality benchmarks.

Are there any specific payment terms associated with the OFFICE PARTITION AND ALTERATION tender?

Yes, participants must outline their proposed payment terms in their financial submissions, specifying the acceptable modes and any scheduled payment milestones linked to project completion stages, thereby ensuring that financial transactions are clear and mutually agreeable between issued and contractors.

What benefits are available for MSEs participating in the OFFICE PARTITION AND ALTERATION tender?

The tender offers specific benefits for Micro, Small, and Medium Enterprises (MSEs), including financial concessions such as lower earnest money deposits and additional points during the evaluation phase, aimed at encouraging their participation and competitiveness in government contracts.

What submission methods are accepted for the OFFICE PARTITION AND ALTERATION tender?

Bids must be submitted electronically via the specified platform for government procurement. All associated documents should be formatted correctly and provide a comprehensive overview of the financial and technical proposals to ensure compliance with submission protocols.