TenderDekho Logo
GEM

Procurement Opportunity: Consultancy for structural drawings (Augmentation of perimeter and waterfront security surveillance

Bid Publish Date

28-Oct-2024, 8:48 am

Bid End Date

18-Nov-2024, 9:00 am

Progress

Issue28-Oct-2024, 8:48 am
Technical18-11-2024 00:58:51
Financial
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 3

Public procurement opportunity for Indian Army Consultancy for structural drawings (Augmentation of perimeter and waterfront security surveillance. Quantity: 1 issued by. Submission Deadline: 18-11-2024 09: 00: 00. View full details and respond.

Documents 5

GeM-Bidding-7031813.pdf

Main Document

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Consultancy Services for Structural Design and Drawings Tender 2025 Ladakh - Structural Design Standards & 25% Quantity Clause

Indian Army

LEH, JAMMU & KASHMIR

Posted: 14 November 2025
Closed: 24 November 2025
GEM

Custom Bid for Services - CONSULTANCY WORK FOR ARCHITECTURAL AND STRUCTURAL DESIGN DRAWINGS

Indian Army

LUCKNOW, UTTAR PRADESH

Posted: 31 January 2025
Closed: 21 February 2025
GEM

Consultancy Services lumpsum basis for preparation of structural design and drawings at Port Blair

Indian Army

SOUTH ANDAMAN, ANDAMAN & NICOBAR

Posted: 21 March 2025
Closed: 11 April 2025
GEM

Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY FOR PREPARATION AND SUPPLY OF ARC

Indian Army

JAIPUR, RAJASTHAN

Posted: 8 April 2025
Closed: 18 April 2025
GEM

Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR PREPARATION AND SUPP

Indian Army

JAIPUR, RAJASTHAN

Posted: 13 September 2025
Closed: 23 September 2025
GEM

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1EDGE CONSULTANTS   Under PMAMake : edge consultants Model : Consultancy For Structural Drawings (Augmentation Title : Consultancy for structural drawings (Augmentation of perimeter and waterfront security surveillance18-11-2024 00:58:51Qualified
2ENGINEERS & CONSULTANCY   Under PMAMake : engineers and consultancy Model : 2017 Title : Consultancy for structural drawings (Augmentation of perimeter and waterfront security surveillance16-11-2024 17:07:29Qualified
3PRISM INFRATECH   Under PMAMake : Prism Infratech Model : Structural design Title : Consultancy for structural drawings (Augmentation of perimeter and waterfront security surveillance15-11-2024 18:12:56Qualified

Financial Results

Rank Seller Price Item
L1EDGE CONSULTANTS(MSE)( MSE Social Category:OBC )    Under PMA₹35,000Item Categories : Consultancy for structural drawings (Augmentation of perimeter and waterfront security surveillance
L2ENGINEERS & CONSULTANCY   Under PMA₹59,000Item Categories : Consultancy for structural drawings (Augmentation of perimeter and waterfront security surveillance
L3PRISM INFRATECH (MSE)( MSE Social Category:General )    Under PMA₹5,40,000Item Categories : Consultancy for structural drawings (Augmentation of perimeter and waterfront security surveillance

Frequently Asked Questions

FAQs

Details are provided in the tender document.

## 1. What are the eligibility requirements for the consultancy tender?

The eligibility requirements include a minimum of 3 years of experience in delivering similar consultancy services. Bidders must also submit supporting documentation proving their experience, past performance, and bidder turnover.

## 2. What documents are required to fulfill the experience criteria?

Bidders must provide documents such as contract copies, invoicing, and certificates from previous clients to validate their past experience in providing similar services.

## 3. How can potential bidders register for this tender?

Interested bidders must follow the registration process through the GeM portal where they can create a seller account and view listed tenders.

## 4. What technical specifications are required in the submission?

Bidders need to demonstrate compliance with the specific technical specifications outlined in the Buyer Specification Document, detailing their ability to deliver structural drawings relevant to security surveillance.

## 5. What is the Earnest Money Deposit (EMD) requirement?

There is no requirement for an EMD in this tender as specified in the documentation.

## 6. Are there any performance security requirements for the bidder?

No performance security is required as per the current tender conditions. However, all submitted bids must adhere to the stipulated guidelines and criteria.

## 7. What are the payment terms for the successful bidder?

Payment terms will typically be specified in the contract after the bid is awarded, including possible milestone payments based on deliverable completion.

## 8. What criteria will be used for price evaluation?

The price evaluation will consider total value-wise assessments, ensuring bids meet the technical and financial criteria specified in the tender.

## 9. How can bidders submit their proposals?

Proposals must be submitted electronically through the GeM portal by the specified deadline, ensuring all required documents are included.

## 10. What are the key deadlines associated with the tender?

The submission deadline is 18 November 2024 at 09:00 AM. Bids will be opened at 09:30 AM on the same day.

## 11. What special provisions exist for MSEs?

While MSEs may typically receive purchase preferences, there is no exemption from the experience criteria or turnover requirements for this tender.

## 12. How will the evaluation and selection process be conducted?

Bids will be evaluated based on their compliance with technical and financial requirements, focusing on total value-wise evaluation during the assessment.

## 13. Is there a possibility for site visits?

Bidders are advised to conduct site visits to gather necessary information; however, any costs incurred during visits will be the responsibility of the bidders.

## 14. How will results be communicated to bidders?

Results of the evaluation and selections will be communicated to all participating bidders as per the contact details provided during submission.

## 15. What happens if the successful bidder fails to meet the terms?

Should a successful bidder fail to comply with the contract terms, the buyer may terminate the contract and seek redress through written notification detailing the reasons for termination.

Explore More Opportunities

Quick Access