TenderDekho Logo
GEM

Contract Bidding Open For HMI,7 IN,SIEMENS,VFD,CPP,CT,HALL EFFCT,500A,SIEMENS,VFD,CPP,FAN,1.55KW,SIEMENS,VFD,CPP,FIELDBUS COU in VISAKHAPATNAM, ANDHRA PRADESH

Bid Publish Date

14-Feb-2026, 2:46 pm

Bid End Date

02-Mar-2026, 3:00 pm

Generate Docs

Progress

Issue14-Feb-2026, 2:46 pm
Technical26-02-2026 22:23:16
Financial
Award25-Apr-2026, 7:38 am
Explore all 4 tabs to view complete tender details

Quantity

109

Category

HMI,7 IN,SIEMENS,VFD,CPP

Bid Type

Two Packet Bid

Categories 36

Public procurement opportunity for Hindustan Petroleum Corporation Ltd HMI, 7 IN, SIEMENS, VFD, CPP, CT, HALL EFFCT, 500A, SIEMENS, VFD, CPP, FAN, 1. 55KW, SIEMENS, VFD, CPP, FIELDBUS COUPLER, MODBUS, SIEMENS, VFD, CPP, FAN, RADIAL FLOW, SIEMENS, VFD, CPP, RESISTOR MODULE, 11KV, SIEMENS, VFD, CPP, CARD, COMPACT FLASH, SIEMENS, VFD, CPP, FO CABLE, ASSY, 9. 5M, SIEMENS, VFD, CPP, CONF, WIRE, D SUB, 1520MM, SIEMENS, VFD, CPP, FILTER MAT, 345X140X8, SIEMENS, VFD, CPP, FILTER ASSY, SIEMENS, VFD, CPP, TRANSDUCR, CURR, 126. 27 OHM, SIEMNS, VFD, CPP, TRANSDUCER, CURR, 63. 13 OHM, SIEMNS, VFD, CPP, CAPACITOR, KIT, OUTPUT, SIEMENS, VFD, CPP, CAPACITOR, KIT, INPUT, SIEMENS, VFD, CPP, PSU, 264V, 15V, SIEMENS, VFD, CPP, WIRE HARNESS KIT, NXG PRO, SIEMENS, VFD, CPP, CT, 200 5A, SIEMENS, VFD, CPP, MODULE, DI, 16DI, 24VDC, ES72211BH320XB0, SMN, INSULATION MONITOR, 230V, 6SY81010AC01, SMN, SIGNAL CABLE, 6FX20021DC001DD0, SMNS, CUD-2 CARD, OPTN MDL TRMNL, 6RX1700-0AK00, BLOWER COOLING FAN, 6SR39000GM011A PLUS, SMNS, THYRISTOR GATEUNIT, 6SL39550TX001AA2, SMNS, PANEL, OPRTR, SNMCS, 6SL30550AA004CA5, SMNS in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 109 issued by. Submission Deadline: 02-03-2026 15: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

HMI,7 IN,SIEMENS,VFD,CPP , CT,HALL EFFCT,500A,SIEMENS,VFD,CPP , FAN,1.55KW,SIEMENS,VFD,CPP , FIELDBUS COUPLER,MODBUS,SIEMENS,VFD,CPP , FAN,RADIAL FLOW,SIEMENS,VFD,CPP , RESISTOR MODULE,11KV,SIEMENS,VFD,CPP , CARD,COMPACT FLASH,SIEMENS,VFD,CPP , FO CABLE,ASSY,9.5M,SIEMENS,VFD,CPP , CONF,WIRE, D SUB,1520MM,SIEMENS,VFD,CPP , FILTER MAT,345X140X8,SIEMENS,VFD,CPP , FILTER ASSY,SIEMENS,VFD,CPP , TRANSDUCR,CURR,126.27 OHM,SIEMNS,VFD,CPP , TRANSDUCER,CURR,63.13 OHM,SIEMNS,VFD,CPP , CAPACITOR,KIT,OUTPUT,SIEMENS,VFD,CPP , CAPACITOR,KIT,INPUT,SIEMENS,VFD,CPP , PSU,264V,15V,SIEMENS,VFD,CPP , WIRE HARNESS KIT,NXG PRO,SIEMENS,VFD,CPP , CT,200 5A,SIEMENS,VFD,CPP , MODULE,DI,16DI,24VDC,ES72211BH320XB0,SMN , INSULATION MONITOR,230V,6SY81010AC01,SMN , SIGNAL CABLE,6FX20021DC001DD0,SMNS , CUD-2 CARD,OPTN MDL TRMNL,6RX1700-0AK00 , BLOWER COOLING FAN,6SR39000GM011A PLUS,SMNS , THYRISTOR GATEUNIT,6SL39550TX001AA2,SMNS , PANEL,OPRTR,SNMCS,6SL30550AA004CA5,SMNS

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 9

GeM-Bidding-8979340.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 25 Items Sign in for GEM prices

#1

HMI,7 IN,SIEMENS,VFD,CPP

As per Specifications

1 each Delivery: 168 days
#2

CT,HALL EFFCT,500A,SIEMENS,VFD,CPP

As per Specifications

2 each Delivery: 168 days
#3

FAN,1.55KW,SIEMENS,VFD,CPP

As per Specifications

1 each Delivery: 168 days
#4

FIELDBUS COUPLER,MODBUS,SIEMENS,VFD,CPP

As per Specifications

1 each Delivery: 168 days
#5

FAN,RADIAL FLOW,SIEMENS,VFD,CPP

As per Specifications

1 each Delivery: 168 days
#6

RESISTOR MODULE,11KV,SIEMENS,VFD,CPP

As per Specifications

3 each Delivery: 168 days
#7

CARD,COMPACT FLASH,SIEMENS,VFD,CPP

As per Specifications

1 each Delivery: 168 days
#8

FO CABLE,ASSY,9.5M,SIEMENS,VFD,CPP

As per Specifications

3 each Delivery: 168 days
#9

CONF,WIRE, D SUB,1520MM,SIEMENS,VFD,CPP

As per Specifications

1 each Delivery: 168 days
#10

FILTER MAT,345X140X8,SIEMENS,VFD,CPP

As per Specifications

60 each Delivery: 168 days
#11

FILTER ASSY,SIEMENS,VFD,CPP

As per Specifications

10 each Delivery: 168 days
#12

TRANSDUCR,CURR,126.27 OHM,SIEMNS,VFD,CPP

As per Specifications

2 each Delivery: 168 days
#13

TRANSDUCER,CURR,63.13 OHM,SIEMNS,VFD,CPP

As per Specifications

2 each Delivery: 168 days
#14

CAPACITOR,KIT,OUTPUT,SIEMENS,VFD,CPP

As per Specifications

3 each Delivery: 168 days
#15

CAPACITOR,KIT,INPUT,SIEMENS,VFD,CPP

As per Specifications

3 each Delivery: 168 days
#16

PSU,264V,15V,SIEMENS,VFD,CPP

As per Specifications

1 each Delivery: 168 days
#17

WIRE HARNESS KIT,NXG PRO,SIEMENS,VFD,CPP

As per Specifications

3 each Delivery: 168 days
#18

CT,200 5A,SIEMENS,VFD,CPP

As per Specifications

2 each Delivery: 168 days
#19

MODULE,DI,16DI,24VDC,ES72211BH320XB0,SMN

As per Specifications

1 each Delivery: 168 days
#20

INSULATION MONITOR,230V,6SY81010AC01,SMN

As per Specifications

1 each Delivery: 168 days
#21

SIGNAL CABLE,6FX20021DC001DD0,SMNS

As per Specifications

2 each Delivery: 168 days
#22

CUD-2 CARD,OPTN MDL TRMNL,6RX1700-0AK00

As per Specifications

2 each Delivery: 168 days
#23

BLOWER COOLING FAN,6SR39000GM011A PLUS,SMNS

As per Specifications

1 each Delivery: 168 days
#24

THYRISTOR GATEUNIT,6SL39550TX001AA2,SMNS

As per Specifications

1 each Delivery: 168 days
#25

PANEL,OPRTR,SNMCS,6SL30550AA004CA5,SMNS

As per Specifications

1 each Delivery: 168 days

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

OEM Annual Turnover

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

24-Feb-2026

Extended Deadline

02-Mar-2026, 3:00 pm

Opening Date

02-Mar-2026, 3:30 pm

Technical Results

S.No Seller Item Date Status
1
INNOMOTICS INDIA PRIVATE LIMITED   Under PMA
-26-02-2026 22:23:16

Financial Results

Rank Seller Price Item
L1
INNOMOTICS INDIA PRIVATE LIMITED   Under PMA
Item Categories : HMI,7 IN,SIEMENS,VFD,CPP,CT,HALL EFFCT,500A,SIEMENS,VFD,CPP,FAN,1.55KW,SIEMENS,VFD,CPP,FIELDBUS COU

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.