Progress
Quantity
239
Bid Type
Two Packet Bid
Organization: Armoured Vehicles Nigam Limited (Department of Defence Production). Procurement: Throw-away carbide milling inserts and WIDIA make special angle milling cutters (WIDIA order number context implied). Location: Not specified in tender data. Scope/Quantity: Bid to supply goods only; exact item count not disclosed; estimated value not provided. Key differentiator: Mandatory GeM Tech Compliance form, optional contract quantity adjustments up to 50% per option clause, and compulsory post-receipt inspection by CGM/OFMK or authorized representative. Warranty: 12 months from supply date with warranty certificate. Unique aspects: Open tender, packing and marking requirements, and pre-dispatch vs post-dispatch inspection pathways described.
Product category: carbide milling inserts
Product category: WIDIA make special angle milling cutters
Warranty: 12 months
Inspection: post-receipt inspection at consignee site by CGM/OFMK
Packing/marking: firm name, SO number, month/date clearly marked
Delivery: open-ended; quantity adjustment up to 50%
GeM compliance: mandatory form
GST handling: actuals or applicable rate, whichever is lower
Quantitative option: +/-50% during contract/extension period
Mandatory GeM Tech Compliance form submission
GST payable by bidder with reimbursement as actuals or as per applicable rate; no fixed GST amount guaranteed by buyer
Delivery period governed by option clause; additional time uses formula (increased quantity/original quantity) × original delivery period with minimum 30 days
Not explicitly stated; option-based delivery extension implies potential penalties as per contract terms
Must submit PAN, GSTIN, and EFT mandate
GeM Tech Compliance form completed and uploaded
Warranty documentation ready for 12-month claim
Post-receipt inspection readiness and marking compliance
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
THROW AWAY CARBIDE MILLING INSERTS FOR M/S. WIDIA MAKE SPECIAL ANGLE MILLING CUTTERS, WIDIA ORD. NO: W
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Medak
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Medak | Medak | - | - | 239 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate with bank certification
GeM Tech Compliance form (downloaded, filled, uploaded)
Warranty certificate (12 months) to be submitted with supplies
Post-receipt inspection documentation (CGM/OFMK authorization proof)
Any marking and packing compliance documents
Key insights about TELANGANA tender market
Bidders should submit PAN, GSTIN, cancelled cheque, EFT mandate, and GeM Tech Compliance form. Ensure a 12-month warranty certificate is included with supplies; post-receipt inspection by CGM/OFMK may be required. The tender allows quantity adjustments up to 50% and requires proper packing and marking.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and GeM Tech Compliance form. Include warranty certificate (12 months) and marking details. Provide packing compliance and any marking proofs. GST handling follows actuals or applicable rate; no fixed GST amount from buyer.
Post-receipt inspection at consignee site by CGM/OFMK or authorized representative is mandated. Pre-dispatch inspection is not applicable unless ATC specifies otherwise. Ensure packaging integrity and marking accuracy before shipment to satisfy inspection criteria.
The material must carry a 12-month warranty from delivery date. Submit a warranty certificate along with supplies. Warranty terms should cover material integrity and performance under standard operating conditions as part of acceptance.
The purchaser may adjust quantity by up to 50% at contract placement, and up to 50% during the currency at contracted rates. Delivery time scales with a formula using increased quantity, minimum 30 days extension where applicable.
Goods must be packed to prevent transit/storage damage and marked with firm name, SO number, and month/date. Proper labeling aids inspection and acceptance at consignee site and aligns with GeM compliance expectations.
GST is determined by the bidder with reimbursement either at actuals or the applicable rate, whichever is lower, subject to the quoted GST percentage. Bidders must provide GSTIN and comply with GST regulations in invoicing.
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS