TenderDekho Logo
Active GEM

BEML Front Bumper Assembly Tender for Defence Production in India 2026 with ISO 9001 Requirement

Bid Publish Date

29-Aug-2026, 4:55 pm

Bid End Date

12-Sep-2026, 5:00 pm

Generate Docs

Progress

Issue29-Aug-2026, 4:55 pm
Corrigendum08-Sep-2026
AwardPending

Key Highlights

  • ISO 9001 certified bidder or OEM required
  • Data Sheet upload and cross-check with product specifications
  • Pre-dispatch inspection by BEML SIT; post-receipt inspection by BEML QUALITY
  • MSME payment: 45 days; Non-MSME payment: 60 days after acceptance

Tender Overview

Bharat Earth Movers Limited (BEML), under the Department of Defence Production, invites bids for the FRONT BUMPER ASSEMBLY. The scope is defined by optional quantity adjustments up to 50%, with delivery timelines linked to the original delivery period. Bidder must upload the product Data Sheet and ensure GST compliance per applicable rates. The sale involves FIM on FOR basis and post-acceptance inspections by BEML QUALITY. The contracting terms include ISO 9001 certification for the bidder or OEM and pre-dispatch/post-receipt inspection by designated agencies. This procurement aims to secure a compliant bumper assembly with strict parameter verification against Data Sheets.

Technical Specifications & Requirements

  • Product name: FRONT BUMPER ASSEMBLY
  • Standards/certifications: ISO 9001 (bidder or OEM must hold)
  • Inspection: Pre-dispatch by BEML SIT; Post Receipt by BEML QUALITY
  • Delivery terms: Delivery period from last date of original delivery order; option to extend with a minimum 30 days; quantity may increase up to 50% during contract
  • Payment terms: 45 days for MSME vendors; 60 days for non-MSME vendors after receipt & acceptance
  • Materials and scope: BEML will supply free issue materials (FIM) on FOR basis
  • Data requirements: Upload Data Sheet; ensure consistency with offered product specifications
  • ATC/Clarifications: Technical Bid and RFQ with additional scope must be uploaded; contact for drawings & QAP provided
  • GST: Bidder to ensure GST applicability and reimbursement as per actual or applicable rates
  • Quantity/Value details: Not specified; option to adjust quantity per clause; estimated value not disclosed

Terms, Conditions & Eligibility

  • EMD/Deposit: Not specified in available data; bidders must review ATC for exact amount
  • Delivery window: Extended delivery time formula provided; minimum 30 days interval
  • Warranty/Quality: ISO 9001 certification required; post-inspection acceptance by BEML QUALITY
  • Payment terms: 45 days (MSME), 60 days (non-MSME) after receipt & acceptance
  • Documentation: Data Sheet, Technical Bid, OEM authorization if applicable; GST, PAN, and vendor credentials
  • Inspection/QA: Pre-dispatch and post-receipt inspections by nominated agencies
  • Price/Taxes: Quoted price inclusive of taxes; GST rate as applicable; no separate tax responsibility by purchaser
  • ATC Terms: Clarifications via designated contact; BOM/Drawings as per QAP

Key Specifications

  • Product/service name: FRONT BUMPER ASSEMBLY

  • Standards: ISO 9001 certified (bidder or OEM)

  • Inspection: Pre-dispatch (BEML SIT); Post-receipt (BEML QUALITY)

  • Delivery: Original delivery period; option to extend; minimum 30 days extension

  • Quantity: Up to 50% increase during contract

  • Payment: MSME 45 days; Non-MSME 60 days after acceptance

  • FIM: Free issue materials on FOR basis

  • Data Sheet: Mandatory upload; match with offered product

Terms & Conditions

  • Delivery quantity adjustment up to 50% during contract

  • ISO 9001 certification required for bidder or OEM

  • Post-acceptance payment terms: 45/60 days depending on MSME status

Important Clauses

Payment Terms

MSME vendors: payment within 45 days after receipt & acceptance; Non-MSME vendors: 60 days

Delivery Schedule

Delivery starts from last date of original delivery order; extended delivery period follows option clause with minimum 30 days

Penalties/Liquidated Damages

Not explicitly provided in data; subject to ATC and contractual terms

Bidder Eligibility

  • ISO 9001 certification (bidder or OEM)

  • Data Sheet uploaded and consistent with bid specs

  • GST compliance and appropriate tax handling by bidder

Tender Data

Bid Details

Quantity

25

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

Yes

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

130079910124 - FRONT BUMPER ASSY

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

PALAKKAD

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PALAKKADPALAKKAD--25180-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9790715.pdf

Main Document

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bharat Earth Movers Limited (beml)

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

08-Sep-2026

Extended Deadline

12-Sep-2026, 11:30 am

Opening Date

13-Sep-2026, 11:30 am

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Duly filled and signed Technical Bid (Buyer specification) & Tender RFQ

2

Data Sheet of the product offered

3

GST Registration Certificate

4

PAN Card

5

Experience certificates (if applicable)

6

Financial statements (as required)

7

OEM authorization (if applicable)

8

Pre-dispatch & Post-receipt inspection documentation

Frequently Asked Questions

Key insights about KERALA tender market

How to bid for FRONT BUMPER ASSEMBLY tender in BEML defence production?

Bidders must submit a Duly filled Technical Bid and the Data Sheet, along with GST PAN and OEM authorization if applicable. ISO 9001 certification is mandatory for bidder or OEM. Delivery terms follow the original period with possible 50% quantity increases, and inspection is conducted by BEML SIT and QUALITY.

What documents are required for BEML bumper tender submission in 2026?

Required documents include Data Sheet, Technical Bid, GST certificate, PAN, experience certificates, financial statements, and OEM authorization if applicable. Ensure the Data Sheet exactly matches the offered FRONT BUMPER ASSEMBLY specifications; submit for pre-dispatch and post-receipt inspections as applicable.

What are the payment terms for MSME and non-MSME suppliers in this tender?

MSME suppliers receive payment within 45 days after receipt and acceptance; non-MSME vendors are paid within 60 days after receipt and acceptance. All payments hinge on successful inspection and conformity to Data Sheet requirements per ATC terms.

Which inspections are required for bumper assembly delivery under this tender?

Pre-dispatch inspection will be conducted at BEML SIT for selected clauses, and post-receipt inspection occurs at the consignee site by BEML QUALITY prior to acceptance. Ensure the supplier’s processes align with these QA checks to avoid rejection.

What standards or certifications must the bumper supplier meet for this bid?

Suppliers must hold ISO 9001 certification (either the bidder or OEM). The Data Sheet must be uploaded and reconciled with product specifications, and the supplier must comply with GST requirements and applicable tax rules during quotation.

How can quantity adjustments affect delivery under this bumper tender in 2026?

The purchaser may increase or decrease quantity up to 50% of bid/contract quantity at placement, with the extended period calculated by (increased quantity/original quantity) × original delivery period, minimum of 30 days. Ensure readiness to adjust production capacity accordingly.

What is the scope of free issue materials for this bumper procurement?

BEML will supply free issue materials (FIM) on FOR basis to the vendor. The supplier must integrate FIM with their manufacturing flow, and align delivery schedules to coordinate with FIM release and inspection milestones.

Where to obtain clarifications for drawings and QAP related to this bumper tender?

For drawings and QAP clarifications contact the designated email ([email protected]) or call the provided number (0491-2565167) with the bid reference to ensure alignment with technical requirements and data sheets.