GEM

Urban Development Department Uttar Pradesh Octagonal Pole Brackets V2 Q3 Tender 2025 Kanpur Dehat

Bid Publish Date

22-Nov-2025, 1:40 pm

Bid End Date

02-Dec-2025, 4:00 pm

Progress

Issue22-Nov-2025, 1:40 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

8

Bid Type

Two Packet Bid

Categories 3

Tender Overview

The tender issued by the Urban Development Department Uttar Pradesh through the organization named E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh seeks the procurement of Octagonal Pole with Single Arm or Double Arm Brackets (V2) Q3 for the project area in KANPUR DEHAT, UTTAR PRADESH - 209101. The scope includes Supply, Installation, Testing and Commissioning of the poles and brackets, with quality controls such as an ISO 9001 requirement for the bidder or the OEM and a mandatory Material Test Certificate. The purchase allows up to a 25% quantity variation during ordering and contract currency, with delivery timelines calculated from the original delivery order, ensuring minimum extension while preserving contracted rates. The tender emphasizes certification, lab testing, and financial due diligence through turnover evidence. This is a municipal infrastructure procurement focused on durable pole hardware for street lighting or network installations, with emphasis on compliance and post-award acceptance criteria.

Technical Specifications & Requirements

  • Product/Service: Octagonal Pole with Single Arm Brackets or Double Arm Brackets (V2) Q3
  • Location: KANPUR DEHAT, UTTAR PRADESH (PIN 209101)
  • Scope: Supply, Installation, Testing and Commissioning of goods
  • Standards & Certification: ISO 9001 certification for bidder or OEM
  • Documentation: Material Test Certificate to be included with supply
  • Quality & Acceptance: Lab testing by Buyer’s lab; lab results determine acceptance
  • Turnover Evidence: Minimum average annual turnover for last 3 years; audited balance sheets or CA/Cost Accountant certificate
  • Delivery/Option Clause: Quantity may be increased/decreased by up to 25%; delivery time adjustments calculated as (increased/ original) × original period, min 30 days
  • OEM/Turnover: OEM turnover criteria apply per bid document
  • Scope Note: All cost components included in bid price; delivery from original delivery order date

Terms, Conditions & Eligibility

  • EMD: Amount not disclosed in tender data; bidders must refer to the bid document for exact figure and submission method
  • Delivery Terms: Option clause allows up to 25% quantity change; delivery period adjustments with minimum 30 days
  • Documentation: Upload required ISO 9001 certificates, Material Test Certificates, audited financials, and CA/Cost Accountant turnover certificates
  • Payment Terms: Not specified in data; procurement includes Supply, Installation, Testing and Commissioning; terms to be as per bid document
  • Warranty & Acceptance: Acceptance is lab-driven per Buyer’s Lab results; no explicit warranty term provided in data
  • Eligibility: Bidder/OEM must meet turnover requirements and provide necessary certifications; non-submission may lead to rejection
  • Delivery Location: Kanpur Dehat, Uttar Pradesh; delivery commencement aligned with last date of original order

Key Specifications

    • Product/service: Octagonal Pole with Single Arm Brackets or Double Arm Brackets (V2) Q3
    • Location: Kanpur Dehat, UP (PIN 209101)
    • Scope: Supply, Installation, Testing and Commissioning
    • Certifications: ISO 9001 (bidder or OEM)
    • Documentation: Material Test Certificate to be included
    • Acceptance: Buyer’s Lab testing results determine acceptance
    • Financials: Minimum average turnover for last 3 years; evidence via audited statements or CA/Cost Accountant certificate
    • Variation: Quantity may increase/decrease by up to 25%; delivery period adjustments with minimum 30 days

Terms & Conditions

  • Key term: 25% quantity variation permissible at contract placement and during currency

  • Key term: ISO 9001 certification required for bidder or OEM

  • Key term: Material Test Certificate mandatory with supply for acceptance testing

Important Clauses

Payment Terms

Not specified in data; payment terms to be as per bid document; scope includes Supply, Installation, Testing and Commissioning

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time computed as (increased quantity / original quantity) × original period, minimum 30 days

Penalties/Liquidated Damages

Not detailed in provided data; penalties to be described in bid document/ATC

Bidder Eligibility

  • Evidence of minimum 3-year turnover through audited statements or equivalent CA/Cost Accountant certificate

  • ISO 9001 certification for bidder or OEM

  • Material Test Certificate to accompany supply and post-delivery inspection

  • Capability to perform Supply, Installation, Testing and Commissioning

Past Similar Tenders (Historical Results)

5 found

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

Online Property Tax Management System, Jhansi, Uttar Pradesh

JHANSI, UTTAR PRADESH

Posted: 11 April 2025
Closed: 22 April 2025
GEM

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

AZAMGARH, UTTAR PRADESH

Posted: 7 April 2025
Closed: 18 April 2025
GEM

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

AZAMGARH, UTTAR PRADESH

Posted: 7 April 2025
Closed: 18 April 2025
GEM

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

MAHARAJGANJ, UTTAR PRADESH

Posted: 24 March 2025
Closed: 3 April 2025
GEM

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

N/a

SULTANPUR, UTTAR PRADESH

Posted: 25 March 2025
Closed: 4 April 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements or CA/Cost Accountant turnover certificates for last 3 years

4

ISO 9001 certificate ( bidder or OEM )

5

Material Test Certificate (MTC) to accompany supply

6

OEM authorization (if required by bidder)

7

Technical bid documents and completed bid form

8

Any other certificates requested in bid document / ATC

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for octagonal pole brackets tender in Kanpur Dehat UP 2025

To bid, submit ISO 9001 certification in bidder or OEM name, and attach Material Test Certificate with your supply proposal. Provide audited turnover for last 3 years and ensure capability for Supply, Installation, Testing and Commissioning. Include requested CA/Cost Accountant turnover certificates and relevant documents per Terms.

What documents are required for pole bracket tender in Kanpur Dehat

Required documents include GST registration, PAN, audited financial statements or CA turnover certificates for 3 years, ISO 9001 certificate, Material Test Certificate, OEM authorization if applicable, and complete technical bid with scope of supply, installation and commissioning as specified.

What are the delivery terms for 25% quantity variation in UP tender

The bidder must accommodate up to 25% quantity variation at the contracted rates. Delivery period is calculated from the last date of the original delivery order; if extended, time scales use (increased quantity/original quantity) × original delivery period with a minimum of 30 days.

What standards must be met for pole brackets in UP procurement

At minimum, the bidder or OEM must hold ISO 9001 certification. The materials must be accompanied by a Material Test Certificate, and acceptance relies on Buyer’s Lab test results as the sole criterion for conformity.

What is the scope of work for the Kanpur Dehat pole project

Scope includes: Supply, Installation, Testing and Commissioning of Octagonal Pole with Single Arm or Double Arm Brackets (V2) Q3. All costs must be included in the bid price; delivery and performance are subject to the buyer's acceptance criteria.

Where can I view the ATC and certificates required for the UP bid

Refer to the ATC and Corrigendum linked in the buyer terms. Ensure submission of ISO 9001, Material Test Certificate, and any OEM authorizations. Non-submission may lead to bid rejection; ensure all certificates are current and valid.

What is the acceptance criterion for delivered pole brackets in UP

Acceptance is determined by Buyer’s Laboratory results. The materials delivered must pass lab testing; failure to meet standard will lead to rejection. Ensure all materials come with Material Test Certificates and are ISO 9001 compliant.

How to prove bidder turnover compliance for the UP tender

Provide certified Audited Balance Sheets for the last 3 financial years or a CA/Cost Accountant certificate detailing turnover. If the bidder is less than 3 years old, use completed years after incorporation for average turnover calculations.

Similar Tenders

5 found
Urgent

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

N/a

📍 BUDAUN, UTTAR PRADESH

EMD: ₹1.8 L
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

N/a

📍 BUDAUN, UTTAR PRADESH

EMD: ₹68,000
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

N/a

📍 ALIGARH, UTTAR PRADESH

EMD: ₹25,000
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Octagonal Pole with Single Arm or Double Arm Brackets (V2)

N/a

📍 ALIGARH, UTTAR PRADESH

EMD: ₹18,500
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

E-municipalities UP Urban Development PPE Procurement Octagonal Pole Brackets ISO 9001 2025

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

📍 KANPUR DEHAT, UTTAR PRADESH

EMD: ₹16,000
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM