Bid Publish Date
13-Oct-2026, 7:42 pm
Bid End Date
23-Oct-2026, 8:00 pm
Value
₹1,69,000
Location
Progress
The procurement is issued by the Indian Army under the Department Of Military Affairs for a package of electrical and mechanical components including Rotary PTO Switch, Brake Switch Relay 24V, Wiper Motor Assemble, Solenoid Switch Assembly, Brush Gear Assembly, Hub Seal Rear, Solenoid Electrical, Front Hub Oil Inner Seal, SAE pipe hose, and Fan Belt Engine. Estimated value is ₹1,69,000. Location: Tawang, Arunachal Pradesh – 790104. 10 items listed in the BOQ with unspecified quantities, indicating a broad spares/assembly kit for military vehicle or equipment maintenance. The tender emphasizes supplier turnover and documentation rather than explicit technical specs, demanding compliant bidders with robust financials and statutory certificates.
Product/service names: Rotary PTO Switch, Brake Switch Relay 24V, Wiper Motor Assembly, Solenoid Switch Assembly, Brush Gear Assembly, Hub Seal Rear, Solenoid Electrical, Front Hub Oil Inner Seal, SA of Pipe 5/8 NN Hose, Fan Belt Engine
Quantities: Not disclosed in BOQ data
Estimated value: ₹169,000
Standards/Certification: Not specified
Delivery/Location: Tawang, Arunachal Pradesh 790104
Experience: Required turnover documentation; no explicit project specs
Turnover-based eligibility with three-year financials
Mandatory certificates and documents submission
Location-specific procurement for Indian Army in Tawang
Not specified in data; bidders must refer to bid documents or ATC for terms
Not specified; no explicit timeline provided in data; check bid document
Not specified; standard bid terms likely apply; verify in ATC
Minimum average annual turnover as per last 3 financial years
Audited balance sheets or CA/Cost Accountant certificate
Submission of all required certificates and documents
Eligibility for procurement for Indian Army in Arunachal Pradesh
Quantity
48
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
ROTARY PTO SWITCH , BRAKE SWITCH RELAY 24V , WIPER MOTOR ASSY , SOLENOID SWITCH ASSY , BRUSH GEAR ASSY , HUB SEAL REAR , SOLENOID ELECTRICAL , FRONT HUB OIL INNER SEAL , S A OF PIPE 5 8 NN HOSE , FAN BELT ENGINE
Max Delivery Days
16
Delivery Locations
1
Delivery Cities
Tawang
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tawang | Tawang | - | - | 4 | 16 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
ROTARY PTO SWITCH
ROTARY PTO SWITCH
BRAKE SWITCH RELAY 24V
BRAKE SWITCH RELAY 24V
WIPER MOTOR ASSY
WIPER MOTOR ASSY
SOLENOID SWITCH ASSY
SOLENOID SWITCH ASSY
BRUSH GEAR ASSY
BRUSH GEAR ASSY
HUB SEAL REAR
HUB SEAL REAR
SOLENOID ELECTRICAL
SOLENOID ELECTRICAL
FRONT HUB OIL INNER SEAL
FRONT HUB OIL INNER SEAL
S A OF PIPE 5 8 NN HOSE
S A OF PIPE 5 8 NN HOSE
FAN BELT ENGINE
FAN BELT ENGINE
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | ROTARY PTO SWITCH | ROTARY PTO SWITCH | 4 | nos | 254@buyer | 16 | |
| 2 | BRAKE SWITCH RELAY 24V | BRAKE SWITCH RELAY 24V | 4 | nos | 254@buyer | 16 | |
| 3 | WIPER MOTOR ASSY | WIPER MOTOR ASSY | 4 | nos | 254@buyer | 16 | |
| 4 | SOLENOID SWITCH ASSY | SOLENOID SWITCH ASSY | 4 | nos | 254@buyer | 16 | |
| 5 | BRUSH GEAR ASSY | BRUSH GEAR ASSY | 4 | nos | 254@buyer | 16 | |
| 6 | HUB SEAL REAR | HUB SEAL REAR | 8 | nos | 254@buyer | 16 | |
| 7 | SOLENOID ELECTRICAL | SOLENOID ELECTRICAL | 4 | nos | 254@buyer | 16 | |
| 8 | FRONT HUB OIL INNER SEAL | FRONT HUB OIL INNER SEAL | 8 | nos | 254@buyer | 16 | |
| 9 | S A OF PIPE 5 8 NN HOSE | S A OF PIPE 5 8 NN HOSE | 4 | nos | 254@buyer | 16 | |
| 10 | FAN BELT ENGINE | FAN BELT ENGINE | 4 | nos | 254@buyer | 16 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Audited annual accounts / CA-Certificate showing turnover for the last 3 financial years
Certificate of incorporation / registration
Experience certificates detailing similar supply (if any)
Technical bid documents as per tender terms
OEM authorizations (if applicable)
EMD submission proof (if applicable in bid document)
Any other certificates listed in ATC / Corrigendum
Key insights about ARUNACHAL PRADESH tender market
Bidders must ensure turnover criteria are met with audited statements for the last 3 financial years and upload all required certificates as per the Bid Document/ATC. Submit the 3-year turnover certificates, GST, PAN, and any OEM authorizations. Delivery location is Tawang, Arunachal Pradesh; the estimated value is ₹1.69 lakh.
Required documents include GST certificate, PAN, audited financials or CA certificate showing 3-year turnover, incorporation registration, experience certificates, technical bid documents, and OEM authorizations. Also include any certificates listed in ATC/Corrigendum and EMD proof if applicable.
The tender lists items such as Rotary PTO Switch and related automotive electrical components but provides no explicit technical specs. Bidder should refer to the BOQ items and await clarification; ensure compliance with any IS/ISD standards stated in the final bid documents or corrigenda.
The EMD amount is not disclosed in the provided data. Bidders should verify the EMD requirement in the official BID DOCUMENT/ATC and prepare accordingly, ensuring payment mode per the terms—DD or online as specified in the bid notice.
Delivery timelines are not specified in the available data. Bidders must consult the detailed tender document or ATC to confirm delivery schedules, installation requirements (if any), and penalties for late delivery.
Mandatory certificates include GST, PAN, audited turnover documents, incorporation/registration proof, and any certificates cited in the Bid Document/ATC. Ensure all documents are uploaded with the bid to avoid rejection.
BOQ lists 10 items all related to automotive electrical/mechanical spares but provides N/A quantities. Bidders should seek clarification for exact quantities and units, while preparing to supply components like PTO switches, wiper motors, solenoids, hub seals, and related belts/hoses.
Eligibility hinges on turnover criteria, submission of audited financial statements, and mandatory certificates. Verify statutory registrations, ensure three-year turnover meets the stated threshold, and prepare all required technical and OEM documents to meet ATC requirements.