TenderDekho Logo
Active GEM

Procurement Opportunity: Casing Wear Ring,Shaft,Spacer Sleeve,Stuffing Box Bush,Deep groove ball bearing,Bearing Spacer,Thru in CHITTORGARH, RAJASTHAN

Bid Publish Date

18-Jul-2026, 11:53 am

Bid End Date

08-Aug-2026, 9:00 am

EMD

₹10,400

Progress

Issue18-Jul-2026, 11:53 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

81

Category

Casing Wear Ring

Bid Type

Two Packet Bid

Categories 35

A tender has been published for Nuclear Power Corporation Of India Limited Casing Wear Ring, Shaft, Spacer Sleeve, Stuffing Box Bush, Deep groove ball bearing, Bearing Spacer, Thrust Collar, Lock Nut, Locking Washer, Sleeve Nut LH, Sleeve Nut RH, Impeller Key, Coupling Key, O Ring, O Ring for Bearing End cover, Complete set of Pump in CHITTORGARH, RAJASTHAN. Quantity: 81 by. Submission Deadline: 08-08-2026 09: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Casing Wear Ring , Shaft , Spacer Sleeve , Stuffing Box Bush , Deep groove ball bearing , Bearing Spacer , Thrust Collar , Lock Nut , Locking Washer , Sleeve Nut LH , Sleeve Nut RH , Impeller Key , Coupling Key , O Ring , O Ring for Bearing End cover , Complete set of Pump

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

8

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Chittorgarh

Delivery Pincodes

323303

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vyankteshwar Hansraj Patekar323303,NPCIL, Rawatbhata Atomic Power Project 7 and 8, Contracts and Material Management Wing, Anushakti, Via-Kota Rajasthan Which is about 60 Kms. away from Kota.ChittorgarhRajasthan3233034180-

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9526524.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

Casing Wear Ring

As per specification sheet

4 nos Delivery: 180 days
#2

Shaft

As per specification sheet

1 nos Delivery: 180 days
#3

Spacer Sleeve

As per specification sheet

2 nos Delivery: 180 days
#4

Stuffing Box Bush

As per specification sheet

4 nos Delivery: 180 days
#5

Deep groove ball bearing

As per specification sheet

6 nos Delivery: 180 days
#6

Bearing Spacer

As per specification sheet

4 nos Delivery: 180 days
#7

Thrust Collar

As per specification sheet

4 nos Delivery: 180 days
#8

Lock Nut

As per specification sheet

8 nos Delivery: 180 days
#9

Locking Washer

As per specification sheet

4 nos Delivery: 180 days
#10

Sleeve Nut LH

As per specification sheet

6 nos Delivery: 180 days
#11

Sleeve Nut RH

As per specification sheet

6 nos Delivery: 180 days
#12

Impeller Key

As per specification sheet

4 nos Delivery: 180 days
#13

Coupling Key

As per specification sheet

4 nos Delivery: 180 days
#14

O Ring

As per specification sheet

10 nos Delivery: 180 days
#15

O Ring for Bearing End cover

As per specification sheet

10 nos Delivery: 180 days
#16

Complete set of Pump

As per specification sheet

4 nos Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC)

5

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer