TenderDekho Logo
GEM

Indian Air Force Network Infrastructure Tender 2025 - 24 Core Armoured OFC, 9U Network Rack with Accessories, Fiber LIU & Laying Work

Bid Publish Date

23-Jan-2026, 9:03 am

Bid End Date

13-Feb-2026, 9:00 am

Progress

RA
Issue23-Jan-2026, 9:03 am
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

4712

Category

24 Core Armoured OFC

Bid Type

Two Packet Bid

Categories 7

Tender Overview

Organization: Indian Air Force (Department Of Military Affairs). Procurement: 24 Core Armoured OFC, Network Rack 9 U with accessories and installation, Fiber LIU 6 Pair fully loaded FDF, Fiber LIU fully loaded 24 Pair FDF, Splicing, OFC patch cords, PVC round pipe, HDPE Pipe, and Laying of OFC in prepared duct and over false ceiling. Estimated value and EMD are not disclosed; however, the tender imposes a 25% quantity option at contract award and during the currency of the contract. Key distinctions include mandatory data-sheets, NDA, and Manufacturer Authorization. The order may extend delivery time per the option clause, with a minimum 30 days. This tender emphasizes electrical/telecom backbone upgrade and compliant installation work for military infrastructure.

Technical Specifications & Requirements

  • Product/service names: 24 Core Armoured OFC, 9U Network Rack with accessories, Fiber LIU (6 Pair and 24 Pair) fully loaded FDF, splicing, OFC patch cords, PVC round pipe, HDPE pipe.
  • Delivery/Installation scope: Laying OFC in prepared duct and over false ceiling; installation of network rack and LIUs; splicing and patching.
  • Documentation requirements: Data Sheet upload; OEM/manufacturer authorization; NDA on bid; PAN, GST certificate, cancelled cheque; EFT mandate.
  • Compliance expectations: Data Sheet must match offered product parameters; mismatches may lead to bid rejection.
  • Financial: Turnover criteria mentioned (minimum average turnover over last 3 years as per bid document); no numeric value provided here.
  • Other terms: Option clause allowing ±25% quantity adjustment; delivery period linked to last delivery order date; extended delivery time formula; bid must comply with all terms.

Terms, Conditions & Eligibility

  • EMD/Performance: Not disclosed in the data; bidders must comply with standard bid security as per terms.
  • Delivery & timing: Delivery period governed by option clause; extended time calculation; minimum 30 days for extra delivery time.
  • Eligibility: Not under liquidation or similar proceedings; turnover criteria applicable; data sheets and EFT mandate required.
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; NDA; OEM Authorization; Data Sheet; turnover certificates from CA or audited statements.
  • Vendor code & compliance: Manufacturer authorization if bid through authorised distributors; data sheet alignment critical.
  • Quality & risk: NDA to prevent disclosure; mismatch in technical parameters can lead to bid rejection.

Key Specifications

  • 24 Core Armoured OFC

  • Network Rack 9U with accessories and installation

  • Fiber LIU 6 Pair fully loaded FDF

  • Fiber LIU fully loaded 24 Pair FDF

  • Splicing

  • OFC patch cords

  • PVC round pipe

  • HDPE pipe

  • Laying OFC in prepared duct and over false ceiling

Terms & Conditions

  • Option Clause: ±25% quantity adjustment at contract and during currency

  • Delivery period linked to last delivery order date; minimum 30 days for extended time

  • Mandatory data sheets, NDA, OEM authorization, and turnover documentation

Important Clauses

Payment Terms

Details not provided; bidders should follow standard payment terms as per tender and supplier agreement after delivery and acceptance.

Delivery Schedule

Delivery window governed by option clause; calculation for additional time: (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Not explicitly stated; standard LD provisions typically apply based on contract terms and delivery delays.

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Sufficient turnover as specified in bid document (minimum average turnover over last 3 years)

  • Manufacturer authorization for OEM products or authorized distributor credentials

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

24 Core Armoured OFC , Network Rack 9 U with accessories and installation , Fiber LIU 6 Pair fully loaded FDF , Fiber LIU fully loaded 24 Pair FDF , Splicing , OFC patch cords , PVC round pipe , HDPE Pipe , Laying of OFC in prepared duct and over false ceiling

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8714000.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Armoured Fiber Cable,12 Port Loaded Rack,LC-LC Single Mode Patch Cords,LC Single Mode Fiber Pigtail

Indian Council Of Agricultural Research (icar)

Posted: 8 November 2024
Closed: 29 November 2024
GEM

12 Core Armoured Single mode multitube optical fiber,24 PORT LIU with rack,PLB-HDPE duct,Digging wi

Airports Authority Of India

RAIPUR, CHHATTISGARH

Posted: 11 June 2025
Closed: 26 June 2025
GEM

6 core armoured OFC,Duct Pipe for UG OFC,Installation of UG OFC,4 core armoured OFC,Conduit pipe 1

Border Security Force (bsf)

Posted: 26 March 2025
Closed: 16 April 2025
GEM

OFC 12 Core Armoured,Fiber Patch Pannel with E2K connector,Layer 3 Network Switch,LAN Extender Opti

Indian Army

Posted: 8 July 2025
Closed: 17 July 2025
GEM

12 CORE SM ARMOURED OFC,12 PORT FDF WALLRACK LC LC,24 CORE SM ARMOURED OFC,24 PORT FDF WALL RACK LC

Indian Air Force

Posted: 21 November 2024
Closed: 12 December 2024
GEM

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

24 Core Armoured OFC

As per Technical specification and ATC

1,500 mtr Delivery: 60 days
#2

Network Rack 9 U with accessories and installation

As per Technical specification and ATC

5 nos Delivery: 60 days
#3

Fiber LIU 6 Pair fully loaded FDF

As per Technical specification and ATC

5 nos Delivery: 60 days
#4

Fiber LIU fully loaded 24 Pair FDF

As per Technical specification and ATC

2 nos Delivery: 60 days
#5

Splicing

As per Technical specification and ATC

150 nos Delivery: 60 days
#6

OFC patch cords

As per Technical specification and ATC

50 nos Delivery: 60 days
#7

PVC round pipe

As per Technical specification and ATC

500 mtr Delivery: 60 days
#8

HDPE Pipe

As per Technical specification and ATC

1,000 mtr Delivery: 60 days
#9

Laying of OFC in prepared duct and over false ceiling

As per Technical specification and ATC

1,500 mtr Delivery: 60 days

Required Documents

1

GST certificate

2

PAN card

3

Cancelled cheque

4

EFT Mandate certified by bank

5

Data Sheet for offered products

6

Non-Disclosure Declaration (bidder on letterhead)

7

Manufacturer Authorization/OEM authorization documents

8

Turnover certificates or audited financial statements for last 3 years

9

Bidder code creation documents (as per terms)

10

Any other documents specifically requested in the Terms and Conditions

Reverse Auction Schedule

Completed

Start

14-Mar-2026, 10:00 am

End

16-Mar-2026, 10:00 am

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1JAIN INFOSYS(MSE,MII)   Under PMA Winner ₹3,87,650Item Categories : 24 Core Armoured OFC,Network Rack 9 U with accessories and installation,Fiber LIU 6 Pair fully load
L2NETCOM COMMUNICATIONS PRIVATE LIMITED (MSE,MII)   Under PMA₹3,88,100Item Categories : 24 Core Armoured OFC,Network Rack 9 U with accessories and installation,Fiber LIU 6 Pair fully load
L3ARHAM TRADERS (MSE,MII)   Under PMA₹5,20,855Item Categories : 24 Core Armoured OFC,Network Rack 9 U with accessories and installation,Fiber LIU 6 Pair fully load

🎉 L1 Winner

JAIN INFOSYS(MSE,MII)   Under PMA

Final Price: ₹3,87,650

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for the IAF network infrastructure tender in India 2025?

Bidders must submit PAN, GST, cancelled cheque, EFT mandate, OEM authorization, and Data Sheet for offered products. Ensure NDA is signed on letterhead, and turnover certificates from CA or audited statements cover the last 3 years. Follow the option clause for quantity variations and provide data sheet alignment with offered specs.

What documents are required for IAF OFC and network rack bid 2025?

Submit PAN, GSTIN, cancelled cheque, EFT Mandate, NDA, Data Sheet for all items, OEM authorization, and turnover certificates for the last 3 years. Ensure data sheets precisely match product parameters; submit Manufacturer Authorization if bidding via a distributor.

What are the technical specifications for 24 core OFC and LIU in this tender?

Specifications include 24 Core Armoured OFC, 9U network rack with accessories, 6 Pair LIU fully loaded FDF, 24 Pair LIU FDF, splicing, OFC patch cords, PVC round pipe, and HDPE pipe, plus laying OFC in prepared ducts and false ceilings. Alignment with data sheet is mandatory for bid acceptance.

What is the delivery timeline and option clause for quantity changes?

Delivery period follows the option clause allowing +/- 25% quantity variation at contract award and during currency. Additional time is calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, and extended delivery time up to the original period.

What is required for Manufacturer Authorization in this IAF bid?

Bidders must provide an OEM authorization certificate with full details: name, designation, address, email, and phone of the OEM or Original Service Provider. This is required when bidding through authorized distributors to verify product compliance.

What are the NDA and confidentiality requirements for this IAF procurement?

Bidder must submit a Non-Disclosure Declaration on their letterhead, committing not to disclose contract details, specifications, or design information during or after contract. Breach can lead to legal action as per applicable rules.

Similar Tenders

5 found

24 PORT MANAGEABLE SWITCH,24 PORT RACK MOUNT LIU IU STANDARD DESIGN FULLY LOADED,48 PORT RACK MOUNT

Hindustan Aeronautics Limited (hal)

📍 BANGALORE, KARNATAKA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

12 core Singlemode Outdoor Armoured Fiber Cable,24 core Singlemode Outdoor Armoured Fiber Cable,Ful

Hindustan Aeronautics Limited (hal)

📍 BANGALORE, KARNATAKA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

24-port enhanced CAT-6 fully loaded Modular type patch panel,Modular Wall Plate with ABS plastic bo

National Institute Of Technology (nit)

📍 KOZHIKODE, KERALA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

Digital Protection Coupler,Digital Protection Coupler,Digital Protection Coupler,Digital Protection

Power Grid Corporation Of India Limited

EMD: ₹15.9 L
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Signage control unit Tower server type PowerEdge.,Streaming encoder with Audio open standard AVOIP

Nuclear Power Corporation Of India Limited

📍 MUMBAI, MAHARASHTRA

EMD: ₹78,985
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM