Power Backup Supply System
Indian Army
Bid Publish Date
27-Nov-2025, 7:33 pm
Bid End Date
08-Dec-2025, 8:00 pm
EMD
₹1,50,000
Location
Progress
Quantity
5
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a Power Backup System tender in Leh, Jammu & Kashmir (194101). The procurement involves installation and wiring included in the bid, with an EMD of ₹150,000. A pre-bid meeting is mandatory, and bidders must submit participation certificates with bid documents. The option clause allows up to 25% quantity variation at contracted rates, with delivery time adjustments calculated from the original delivery period. No BOQ items are listed, indicating a broad scope under power backup equipment. This tender emphasizes on-site assessment and readiness for immediate installation upon award.
Power backup system equipment
Installation and wiring included
EMD amount: ₹150,000
Pre-bid meeting mandatory
Quantity variation up to 25%
Delivery period calculation method
Vendor-code documentation: PAN, GSTIN, cancelled cheque, EFT mandate
Pre-bid meeting with site survey certificate is mandatory
EMD of ₹150,000 required for bid submission
Installation and wiring included in bid scope
Delivery time flexible with 25% quantity variation
Not explicitly stated; EMD ₹150,000 required; contract terms imply payment upon delivery and acceptance per standard Indian Army procurement norms
Delivery period begins from the last date of original delivery order; additional time computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in available data; presumed to be in line with standard government LD clauses for late delivery
Eligibility to participate in government defense procurement for power backup systems
Must comply with mandatory pre-bid meeting and site survey certification
Submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor-code creation
Indian Army
Indian Army
Indian Navy
ERNAKULAM, KERALA
Indian Army
KOLASIB, MIZORAM
N/a
DEHRADUN, UTTARAKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN card
GSTIN certificate
Cancelled cheque
EFT mandate certified by Bank
Pre-bid meeting participation certificate
Site survey certificate (provided by buyer)
Technical bid documents (as applicable by vendor-code process)
Any OEM authorizations if required by supplier
Key insights about JAMMU AND KASHMIR tender market
Bidders must attend the mandatory pre-bid meeting, submit site survey certificate, and provide PAN, GSTIN, cancelled cheque, and bank EFT mandate with the bid. Include installation and wiring scope details and confirm ability to handle up to 25% quantity variation at contracted rates.
Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, site survey certificate, pre-bid meeting participation, and any OEM authorizations if applicable. Ensure installation/wiring is included and quantities can adjust up to 25% as per ATC terms.
Delivery starts from the last date of the original delivery order; if quantity increases, additional time equals (increased/original) × original period, minimum 30 days. The buyer may extend within original delivery period; ensure feasibility for install in high-altitude Leh.
The EMD is ₹150,000. This amount acts as security for bid submission and must be submitted as specified by the Indian Army procurement process, typically via demand draft or online payment as per tender terms.
Yes, installation and wiring of the power backup system are included with this bid. Suppliers should plan for on-site commissioning and verification after installation, ensuring full system integrity in Leh.
All bidders must participate in the pre-bid meeting and submit the site survey certificate provided by the buyer with the bid documents. This meeting clarifies scope, deployment constraints, and compliance expectations.
Bids must account for potential 25% increases/decreases in quantity at contracted rates. Delivery deadlines adjust using the specified formula, with a minimum extension of 30 days, impacting schedule and logistics planning.
Eligibility includes mandatory pre-bid participation, capability to install and wire power backup systems, fulfillment of vendor-code documents (PAN, GSTIN, EFT), and the ability to meet the 25% quantity variation and delivery timelines as specified.
Access all tender documents at no cost
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS