Bid Publish Date
20-Jul-2026, 3:12 pm
Bid End Date
07-Sep-2026, 7:00 pm
Value
₹12,82,265
Location
Progress
School Of Planning And Architecture Vijayawada has released a public tender for Online Ups Modular Type (Q3) in KRISHNA, ANDHRA PRADESH. Quantity: 1. Submission Deadline: 07-09-2026 19: 00: 00. Download documents and apply online.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Warranty Period
3 years
Experience Required
3 Year (s)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Online Ups Modular Type (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
38
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ntr
Delivery Pincodes
520008
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Palavalasa Venkata Surya Shyam Kumar | 520008,School of Planning and Architecture, Vijayawada. Survey No.4/4, ITI Road,Vijayawada-520008, Andhra Pradesh, India. | Ntr | Andhra Pradesh | 520008 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
CATALOG Specification
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
03-Sep-2026, 3:30 pm
Opening Date
03-Sep-2026, 4:00 pm
Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Output power capacity including redundancy/Expandable (Rack facility) upto/Minimum backuptime (including redundancy) /Minimum VAH (VAH shall be calculated Battery voltage x Battery Ah x No. of batteries = Total VAH) | 100 KVA / 150 KVA / 30 Minutes / 82000 VAH |
| GENERIC | Noise level | |
| INPUT | In put Voltage Range | 340 V to AC to 470 V AC 3 Phase |
| INPUT | Input frequency range | 50 +/-6% Hz |
| INPUT | Distortion (current) | < / = 3% |
| OUTPUT | Output powr factor | >/=0.99 |
| CONSTRUCTION | Minimum thickness (in mm) of Rack Enclosure for Modular UPS duly powder coated | 2.0 |
| CONSTRUCTION | UPS enclosure's degree of protection as per IS:13947 (Part 1)/1993 latest | IP20 |
| CONSTRUCTION | Total Harmonic Distrotion (THD) for 100% linear load | < 3% |
| CONSTRUCTION | Total Harmonic Distrotion (THD) for 100% non-linear load | < 5% |
| CONSTRUCTION | Over all efficiency on rated full load of 0.8 PF (min.) AC output | >/=96% |
| CONSTRUCTION | Inverter efficiency on rated full load of 0.8 PF (min.) AC output | >/=95% |
| CONSTRUCTION | UPS shall withstand Over load capacity - 125% (Output with mains AC-AC) | for 10 Minutes (Minimum) |
| CONSTRUCTION | UPS shall withstand Over load capacity - 125% (Output in battery run DC-AC) | for 2 Minutes (Minimum) |
| BATTERY | Battery type | SMF VRLA |
| BATTERY | Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD | 8 to 10 hours |
| BATTERY | Batteries shall supply with | With metal rack |
| WARRANTY AND SERVICES | Warranty for Modular UPS (on site comprehensive warranty) (in years) | 3 |
| WARRANTY AND SERVICES | Warranty for battery (replacement warranty) (in years) | 2 |
| WARRANTY AND SERVICES | After sales and complaint service | within 24 hours |
| WARRANTY AND SERVICES | PAN India service support on 24 x 7 basis | Yes |
| WARRANTY AND SERVICES | AMC support available after 3 year warranty | Yes |
| WARRANTY AND SERVICES | Quarterly preventive maintenance | Yes |
| WARRANTY AND SERVICES | Manufacturer shall provide and support for installation, commissioning, spares, technical support all over India | Yes |
| WARRANTY AND SERVICES | Availability of spares in close proximity (Spares should be easily available close to the site) | Yes |
| CERTIFICATIONS | CE Certification and marking | Yes |
| CERTIFICATIONS | Damp Heat Test : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C,two cycles of (12+12) hours each 2007) | Yes |
| CERTIFICATIONS | Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs | Yes |
| CERTIFICATIONS | Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. | Yes |