Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8
Indian Army
JAMMU, JAMMU & KASHMIR
Progress
Quantity
603
Category
Title1
Bid Type
Two Packet Bid
A tender has been published for Archaeological Survey Of India (asi) Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8 in BELLARY, KARNATAKA. Quantity: 603 by. Submission Deadline: 22-08-2025 15: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
GURDASPUR, PUNJAB
Central Health Service Ministry Of Health And Family Welfare
NEW DELHI, DELHI
Western Railway
RATLAM, MADHYA PRADESH
Joint Venture Of Cil, Ntpc, Iocl, Fcil & Hfcl
GORAKHPUR, UTTAR PRADESH
Tender Results
Loading results...
Title1
Labour Charges for removing the veneering wall etc., after proper documentation bringing them down at a height of 2.50 mtr, stocking for reuse, erecting and removing of supports at down properly, etc., complete
Title2
Labour Charges for removal of core filling in between stone masonry veneer wall and stacking the useful materials and conveyance of debris to a far away from the monument premises, etc.complete
Title3
Labour Charges for Excavation/Scientific clearance of earth deposit to retrieve fallen architectural stone elements and to expose the buried plinth and original floor & drainage system, including stacking useful stones and disposing of the excavated earth after proper screening outside the temple complex, etc.complete
Title4
Labour Charges for resetting the old available veneer stone and new stone in original position in lime mortar 1into2 ratio including necessary pointing the stone joints in same mortar with suitable colour oxides, curing, as per the standard specifications and as directed etc. complete (materials supplied by the department)
Title5
Labour Charges for Construction of brick work for corefilling and in the edges with country bricks Specially made as per requirement in Lime Mortar 1into2 ratio, curing etc., complete (materials supplied by the department)
Title6
Labour Charges for Providing apron and Pathwaty using new stone flooring slabs of size 1.20m to 0.90m in length, 0.60m to 0.45m in breadth and 3 inch to 4inch thick properly dressing as per the old available clues setting in lime mortar 1into1.5 ratio above the foundation concerete and pointing the stone joints with lime mortar 1into2 ratio, curing etc.complete (materials supplied by the department)
Title7
Labour Charges for Supplying and making of new veneer stone with good quality of new stones properly dressing all sides and architectural designs as per the available clues in the place of damaged and missing members(materials supplied by the department)
Title8
disposal of waste and unserviceable materials outsidetemplepremises, stacking the stone members and leveling the undulated area, etc.complete. 1.Disposalofbuilding rubbish/malba/similar unserviceable, dismantled or waste materials-100 Cum 2.Removal and stacking of store members-75 Cum 3.or leveling the area-creation of parking space approximately size of 80M X 6M X 0.50M-240 Cum
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | Labour Charges for removing the veneering wall etc., after proper documentation bringing them down at a height of 2.50 mtr, stocking for reuse, erecting and removing of supports at down properly, etc., complete | 28 | cum | sunilkumarmc | 90 | |
| 2 | Title2 | Labour Charges for removal of core filling in between stone masonry veneer wall and stacking the useful materials and conveyance of debris to a far away from the monument premises, etc.complete | 14 | cum | sunilkumarmc | 90 | |
| 3 | Title3 | Labour Charges for Excavation/Scientific clearance of earth deposit to retrieve fallen architectural stone elements and to expose the buried plinth and original floor & drainage system, including stacking useful stones and disposing of the excavated earth after proper screening outside the temple complex, etc.complete | 397 | cum | sunilkumarmc | 90 | |
| 4 | Title4 | Labour Charges for resetting the old available veneer stone and new stone in original position in lime mortar 1into2 ratio including necessary pointing the stone joints in same mortar with suitable colour oxides, curing, as per the standard specifications and as directed etc. complete (materials supplied by the department) | 46 | cum | sunilkumarmc | 90 | |
| 5 | Title5 | Labour Charges for Construction of brick work for corefilling and in the edges with country bricks Specially made as per requirement in Lime Mortar 1into2 ratio, curing etc., complete (materials supplied by the department) | 23 | cum | sunilkumarmc | 90 | |
| 6 | Title6 | Labour Charges for Providing apron and Pathwaty using new stone flooring slabs of size 1.20m to 0.90m in length, 0.60m to 0.45m in breadth and 3 inch to 4inch thick properly dressing as per the old available clues setting in lime mortar 1into1.5 ratio above the foundation concerete and pointing the stone joints with lime mortar 1into2 ratio, curing etc.complete (materials supplied by the department) | 76 | sqm | sunilkumarmc | 90 | |
| 7 | Title7 | Labour Charges for Supplying and making of new veneer stone with good quality of new stones properly dressing all sides and architectural designs as per the available clues in the place of damaged and missing members(materials supplied by the department) | 18 | cum | sunilkumarmc | 90 | |
| 8 | Title8 | disposal of waste and unserviceable materials outsidetemplepremises, stacking the stone members and leveling the undulated area, etc.complete. 1.Disposalofbuilding rubbish/malba/similar unserviceable, dismantled or waste materials-100 Cum 2.Removal and stacking of store members-75 Cum 3.or leveling the area-creation of parking space approximately size of 80M X 6M X 0.50M-240 Cum | 1 | no | sunilkumarmc | 90 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | B JAGANATH SWAMY CONTRACTOR Under PMA | - | 21-08-2025 17:29:58 | |
| 2 | P.SUBRAMANYAM,CONTRACTOR Under PMA | - | 21-08-2025 18:35:43 | |
| 3 | V.PADMANABHAN, CONTRACTOR. Under PMA | - | 20-08-2025 19:48:47 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | V.PADMANABHAN, CONTRACTOR.(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8 | |
| L2 | B JAGANATH SWAMY CONTRACTOR (MSE,MII)( MSE Social Category:SC ) Under PMA | Item Categories : Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8 | |
| L3 | P.SUBRAMANYAM,CONTRACTOR (MSE,MII)( MSE Social Category:SC ) Under PMA | Item Categories : Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8 |
Please sign in or create an account to view contract details and download result documents.
N/a
📍 Bangalore Rural, KARNATAKA
Cpwd
📍 CHENNAI, TAMIL NADU
Indian Army
📍 AMBALA, HARYANA
Western Railway
📍 RATLAM, MADHYA PRADESH
Indian Army
📍 LEH, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS