TenderDekho Logo
GEM

Invitation to Bid - Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches o in KANGRA, HIMACHAL PRADESH

Bid Publish Date

19-Jul-2025, 11:48 am

Bid End Date

29-Jul-2025, 12:00 pm

EMD

₹70,000

Progress

RA
Issue19-Jul-2025, 11:48 am
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

10134

Category

Earth work excavation by mechanical means Hydraulic excavator manual means in

Bid Type

Two Packet Bid

Categories 44

Indian Army invites bids for Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches or drains, Providing and laying in position in KANGRA, HIMACHAL PRADESH. Quantity: 10134. Submission Deadline: 29-07-2025 12: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches or drains , Providing and laying in position

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8107255.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches or drains

Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches or drains

105 cum Delivery: 90 days
#2

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering

4 cum Delivery: 90 days
#3

Providing and laying in position specified grade of reinforced cement excluding the cost of centering shuttering finishing and reinforced

Providing and laying in position specified grade of reinforced cement excluding the cost of centering shuttering finishing and reinforced

19 cum Delivery: 90 days
#4

Sand pit wall Sand pit wall with filling loose sand filling loose sand

Sand pit wall Sand pit wall with filling loose sand filling loose sand

1 job Delivery: 90 days
#5

Steel reinforced of R C C work

Steel reinforced of R C C work

1,200 kg Delivery: 90 days
#6

Supplying of M S bolts round holding

Supplying of M S bolts round holding down of anchor bolts with nuts and washer plates complete

75 kg Delivery: 90 days
#7

Supplying of M S bolts round holding down of anchor bolts with nuts and washer plates complete

Supplying of M S bolts round holding down of anchor bolts with nuts and washer plates complete

6,800 kg Delivery: 90 days
#8

Providing and fixing MS plate 5mm thick.

Providing and fixing MS plate 5mm thick

1,620 kg Delivery: 90 days
#9

rain shed shhet

rain shed sheet

18 sqm Delivery: 90 days
#10

Designing providing and fixing of Polyester resin fiber reinforced 3D 2D panel

Designing providing and fixing of Polyester resin fiber reinforced 3D 2D panel

50 sqm Delivery: 90 days
#11

Providing and fi Providing and fixing one set of zigzag stairs to climb the top of tower at 10 mtr heightxing one set of zigzag stairs to climb the top of tower at 10 mtr height

Providing and fi Providing and fixing one set of zigzag stairs to climb the top of tower at 10 mtr heightxing one set of zigzag stairs to climb the top of tower at 10 mtr height

1 job Delivery: 90 days
#12

SS fixe imported SS fixe imported chain anchors chain anchors

Providing and fi Providing and fixing one set of zigzag stairs to climb the top of tower at 10 mtr heightxing one set of zigzag stairs to climb the top of tower at 10 mtr height

3 nos Delivery: 90 days
#13

Movable climbing holds Providing and fixing wall climbing wall equipment

SS fixe imported SS fixe imported chain anchors chain anchors

200 nos Delivery: 90 days
#14

Climbing rope 12MM

Climbing rope 12MM

4 nos Delivery: 90 days
#15

Harness

Harness

4 nos Delivery: 90 days
#16

Screw Carabineers

Screw Carabineers

8 nos Delivery: 90 days
#17

Quick draws

Quick draws

12 nos Delivery: 90 days
#18

Belay gloves

Belay gloves

10 pair Delivery: 90 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in

Corrigendum Updates

4 Updates
#1

Update

19-Jul-2025
#2

Update

19-Jul-2025
#3

Update

19-Jul-2025
#4

Update

19-Jul-2025

Reverse Auction Schedule

Completed

Start

16-Aug-2025, 7:00 pm

End

18-Aug-2025, 7:00 pm

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
ARENA SPORTS INFRA CO.   Under PMA
-28-07-2025 12:33:08
2
Dhairya Enterprises   Under PMA
-28-07-2025 21:00:07
3
GLOBAL TECHNOLOGY   Under PMA
-29-07-2025 08:49:52
4
H.A.ENTERPRISE   Under PMA
-29-07-2025 10:41:03
5
M.K.TRADING CORPORATION   Under PMA
-29-07-2025 11:47:47
6
SADBHAVANA ASSOCIATES   Under PMA
-28-07-2025 22:11:49
7
SHREE RAM ASSOCIATES   Under PMA
-28-07-2025 23:01:01
8
Vital Computers   Under PMA
-28-07-2025 16:25:01

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1SADBHAVANA ASSOCIATES(MSE,MII)   Under PMA Winner ₹39,70,085Item Categories : Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches o
L2Vital Computers (MSE,MII)   Under PMA₹39,74,890Item Categories : Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches o
L3GLOBAL TECHNOLOGY (MSE,MII)   Under PMA₹39,91,405Item Categories : Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches o
L4ARENA SPORTS INFRA CO. (MSE,MII)   Under PMA₹39,94,145Item Categories : Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches o
L5SHREE RAM ASSOCIATES (MSE,MII)   Under PMA₹40,72,925Item Categories : Earth work excavation by mechanical means Hydraulic excavator manual means in foundation trenches o

🎉 L1 Winner

SADBHAVANA ASSOCIATES(MSE,MII)   Under PMA

Final Price: ₹39,70,085