Indian Army Wild-Life Cages Tender 2025 Department Of Military Affairs ISO 9001 ISO 9001:2015 Certified OEM 2025
Indian Army
JAMMU, JAMMU & KASHMIR
Bid Publish Date
13-Feb-2026, 7:56 pm
Bid End Date
28-Feb-2026, 8:00 pm
Location
Progress
Quantity
5
Bid Type
Two Packet Bid
A tender has been published for Forest Department Wild - Life Cages (Q3) in THANE, MAHARASHTRA. Quantity: 5 by. Submission Deadline: 28-02-2026 20: 00: 00. Check eligibility and apply.
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JAMMU, JAMMU & KASHMIR
Regional Ayurveda Research Institute For Drug Deve
Satara District Panchayats
SATARA, MAHARASHTRA
Satara District Panchayats
SATARA, MAHARASHTRA
Zilla Parishad Sangli
SANGLI, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Cage Specification | Transportation cages, Capturing cages / Trap cages |
| GENERIC | Cage Structural pattern | Single unit, Assemblable panels to be tied with steel wire strings on site of operation |
| GENERIC | Wheel arrangement for Cage | Yes, No |
| GENERIC | Provision of Trapping mechanism | Yes, No |
| GENERIC | Lifting handles / rings (To hang up the sliding shutter ) | Yes, No |
| GENERIC | Dome arrangement | Yes, No |
| GENERIC | Number of ventilation | 4 Nos. at 2135 mm ( Length side ), 2 Nos. at 2135 mm ( Length side ), N.A |
| GENERIC | Scope of supply | Erection and installation of Cage at site, Duly supply - No erection / Installation |
| GENERIC | Approval of Advance sample before Bulk Supply | After award of contract - Seller shall have to get Advance sample(proto type) approved from Buyer before manufacturing / starting Bulk supplies - Buyer shall approve / provide list of modifications required within 10 days of offer of advance sample - If there is delay in approval of advance sample from Buyer side - the delivery period shall be regularized for the period of delay in sample approval, No Advance Sample |
| MATERIAL & SIZES | Cage Structure material/size | 50 mm X 50 mm X 5 mm MS Angle and MS Sheet of 1.6 mm, 25 mm X 25 mm X 4 mm MS Angle and flat iron 20 X 4 mm, 50 mm X 25 mm Rectangular pipe, 50 mm X 50 mm X 5 mm MS Angle and MS Sheet of 1.6 mm - 25 mm X 25 mm X 4 mm MS Angle and flat iron 20 X 4 mm, 25 mm X 25 mm X 4 mm MS Angle and flat iron 20 X 4 mm - 50 mm X 25 mm Rectangular pipe, 50 mm X 50 mm X 5 mm MS Angle and MS Sheet of 1.6 mm - 25 mm X 25 mm X 4 mm MS Angle and flat iron 20 X 4 mm - 50 mm X 25 mm Rectangular pipe |
| MATERIAL & SIZES | Covering Material/size | Welded wire mesh 25 mm X 25 mm mesh 3.15 mm Dia of wire fixed with the flat 20 mm X 4 mm in Angle iron frame, No covering material |
| MATERIAL & SIZES | Wheel Material | Cast iron of size 255 mm (Inner Dia.), Other than Cast iron, N.A |
| MATERIAL & SIZES | Cage front door material | 32 mm Outer Dia of MS Round pipe (sliding), 50 mm X 25 mm Rectangular pipe |
| MATERIAL & SIZES | Floor material | 3 mm MS Plate, 4 mm MS plate |
| MATERIAL & SIZES | Monitoring window material/size | 12 mm Round bar and size 305 mm X 205 mm, No Window |
| MATERIAL & SIZES | Ventilation material / size | 12 mm Round bar and size 255 mm X 125 mm, No Ventilation |
| MATERIAL & SIZES | Material for trigger wire | 2 mm MS wire rope, N.A |
| MATERIAL & SIZES | Material for trigger assembly | 12 mm MS rod and 25 mm OD pipe, N.A |
| MATERIAL & SIZES | Dome Material | 50 mm X 5 mm MS flat with 1.6 mm MS sheet and size of Radius 610 mm over the height of cage, No Dome |
| MATERIAL & SIZES | Handle | One Handle on top of exit sliding shutter, N.A |
| MATERIAL & SIZES | Tower Bolt | A small Tower bolt at exit sliding shutter, N.A |
| MATERIAL & SIZES | Safety stoppers | 4 Nos. circular and tail safety stoppers in frame of sliding shutter, N.A |
| DIMENSION | Length of cage | 2135 mm |
| DIMENSION | Width of cage | 1370 mm |
| DIMENSION | Height of cage | 1370 mm |
| WARRANTY | Warranty period | 1 - Year, 2 - Year, 3 - Year |
| CERTIFICATION | Test reports to be finished to buyer's on demand | Yes, No |
| CERTIFICATION | OEM of offered product is ISO 9001 : 2015 certified | Yes, No |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
28-Feb-2026, 8:00 pm
Opening Date
28-Feb-2026, 8:30 pm
State Government
📍 NASHIK, MAHARASHTRA
Principal Chief Conservator Of Forests And Hoff
N/a
📍 NARMADA, GUJARAT
Principal Chief Conservator Of Forests And Hoff
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS