Bid Publish Date
15-Nov-2026, 11:21 am
Bid End Date
25-Nov-2026, 12:00 pm
Location
Progress
The Indian Army, Department Of Military Affairs, seeks supply, installation, testing and commissioning of a broad range of vehicle components, including HEAD LAMP ASSY LH, RADIATOR AND CAC ASSY WITH SHROUD, CLUTCH RELEASE BRG, HEAD LIGHT ASSY LOW BEAM, COMBI SWITCH, BEARING PILOT, SPEEDO CABLE 3MM DIA 3000MM LONG, BRAKE PAD, WIPER BLADE, HAND BRAKE CABLE, REAR VIEW MIRROR, OIL FILTER, COMBINATION SWITCH, VEHICLE SPEED SENSOR, BRAKE SHOE ASSY REAR, BRAKE SHOE SET, PIN SET SLIDING CALIPER, FRONT SUSPENSION ARM LH, SR 70 REGULATOR 24V, LINK ROD, AIR HOSE PIPE. 22 ITEMS comprise the BOQ; scope includes supply and on-site installation/commissioning with testing. A sample inspection is mandated at Static Wkp EME, Mhow on 23 Nov 2026 at 12:00 hrs. ISO 9001 certification is required; warranty is 1 year after final acceptance. Estimated value and EMD not disclosed. Scope centers on comprehensive vehicle components for defense use.
EMD not disclosed; ensure bankable bid security as per organization policy
ISO 9001 certification mandatory; OEM warranty certificates to be submitted at delivery
1-year warranty post-acceptance; on-site service capability in INDIA required
Not specified in data; bidders should anticipate standard government terms including advance/ milestone payments subject to delivery and acceptance.
Scope includes supply, installation, testing and commissioning; exact delivery deadlines not provided in data.
Not specified in data; LD clauses typically apply for delayed delivery or non-conformance per tender terms.
ISO 9001 certification (bidder or OEM)
Experience in installation, commissioning and maintenance of vehicle components
Service centers/networks in INDIA with after-sales support
Quantity
28
Category
HEAD LAMP ASSY LH
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
30 %
Warranty Period
1 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HEAD LAMP ASSY LH , RADIATOR AND CAC ASSY WITH SHROUD , CLUTCH RELEASE BRG , HEAD LIGHT ASSY LOW BEAM , COMBI SWITCH , BEARING PILOT , SPEEDO CABLE 3 POINT 2MM DIA 3000MM LONG , BRAKE PAD , WIPER BLADE ASSY , HAND BRAKE CABLE , REAR VIEW MIRROR , ELEMENT OIL FILTER , COMBINATION SWITCH , VEHICLE SPEED SENSOR GB , OIL FILTER BIG , BRAKE SHOE ASSY REAR , BRAKE SHOE SET , PIN SET SLIDING CALIPER , ARM ASSY FRONT SUSPENSION LH , SR 70 REGULATOR 24V , LINK ROD , AIR HOSE PIPE
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
INDORE
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | INDORE | INDORE | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
HEAD LAMP ASSY LH
MARUTI SUZUKI SWIFT DZIRE (2016)
RADIATOR AND CAC ASSY WITH SHROUD
LORRY 5/7.5 TON ASHOK LEYLAND STALLION 4x4 MARK-III (2001)
CLUTCH RELEASE BRG
MARUTI GYPSY (ALL MODELS) (2018)
HEAD LIGHT ASSY LOW BEAM
LORRY 5/7.5 TON ASHOK LEYLAND STALLION 4x4 MARK-III (2012)
COMBI SWITCH
LPO 1512TC/55 PRE FABRICATED BUS (TATA) (2006)
BEARING PILOT
MARUTI GYPSY (2018)
SPEEDO CABLE 3 POINT 2MM DIA 3000MM LONG
TRUCK 2.5 TON TATA 4x4 713/32 (2003)
BRAKE PAD
TATA SAFARI STORME GS-800 (4x4) BS-IV (2018)
WIPER BLADE ASSY
Tata Safari Storme (2020)
HAND BRAKE CABLE
TATA SAFARI STORME GS-800 (4x4) BS-IV (2018)
REAR VIEW MIRROR
LIGHT VEH GS 4x4 700-900 KG M&M SCORPIO S11 BS-IV (2024)
ELEMENT OIL FILTER
LIGHT VEH GS 4x4 700-900 KG M&M SCORPIO S11 BS-IV (2024)
COMBINATION SWITCH
LORRY 5/7.5 TON ASHOK LEYLAND STALLION 4x4 MARK-III (2001)
VEHICLE SPEED SENSOR GB
ALS Stallion 5/7.5 Ton 4x4 (2013)
OIL FILTER BIG
MINI BUS SWARAJ MAZDA (2017)
BRAKE SHOE ASSY REAR
TATA SAFARI STORME GS-800 (4x4) BS-IV (2018)
BRAKE SHOE SET
MARUTI SUZUKI Sx4, VXI (BS-IV) (2011)
PIN SET SLIDING CALIPER
MARUTI SUZUKI Sx4, VXI (BS-IV) (2011)
ARM ASSY FRONT SUSPENSION LH
MARUTI SUZUKI Sx4, VXI (BS-IV) (2011)
SR 70 REGULATOR 24V
TRUCK 2.5 TON TATA 4x4 713/32 (2017)
LINK ROD
MARUTI SUZUKI Sx4, VXI (BS-IV) (2011)
AIR HOSE PIPE
LORRY 5/7.5 TON ASHOK LEYLAND STALLION 4x4 MARK-III (2013)
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | HEAD LAMP ASSY LH | MARUTI SUZUKI SWIFT DZIRE (2016) | 1 | nos | pragatiiii08 | 15 | |
| 2 | RADIATOR AND CAC ASSY WITH SHROUD | LORRY 5/7.5 TON ASHOK LEYLAND STALLION 4x4 MARK-III (2001) | 1 | nos | pragatiiii08 | 15 | |
| 3 | CLUTCH RELEASE BRG | MARUTI GYPSY (ALL MODELS) (2018) | 1 | nos | pragatiiii08 | 15 | |
| 4 | HEAD LIGHT ASSY LOW BEAM | LORRY 5/7.5 TON ASHOK LEYLAND STALLION 4x4 MARK-III (2012) | 1 | nos | pragatiiii08 | 15 | |
| 5 | COMBI SWITCH | LPO 1512TC/55 PRE FABRICATED BUS (TATA) (2006) | 1 | nos | pragatiiii08 | 15 | |
| 6 | BEARING PILOT | MARUTI GYPSY (2018) | 1 | nos | pragatiiii08 | 15 | |
| 7 | SPEEDO CABLE 3 POINT 2MM DIA 3000MM LONG | TRUCK 2.5 TON TATA 4x4 713/32 (2003) | 1 | nos | pragatiiii08 | 15 | |
| 8 | BRAKE PAD | TATA SAFARI STORME GS-800 (4x4) BS-IV (2018) | 1 | nos | pragatiiii08 | 15 | |
| 9 | WIPER BLADE ASSY | Tata Safari Storme (2020) | 2 | nos | pragatiiii08 | 15 | |
| 10 | HAND BRAKE CABLE | TATA SAFARI STORME GS-800 (4x4) BS-IV (2018) | 1 | nos | pragatiiii08 | 15 | |
| 11 | REAR VIEW MIRROR | LIGHT VEH GS 4x4 700-900 KG M&M SCORPIO S11 BS-IV (2024) | 1 | nos | pragatiiii08 | 15 | |
| 12 | ELEMENT OIL FILTER | LIGHT VEH GS 4x4 700-900 KG M&M SCORPIO S11 BS-IV (2024) | 1 | nos | pragatiiii08 | 15 | |
| 13 | COMBINATION SWITCH | LORRY 5/7.5 TON ASHOK LEYLAND STALLION 4x4 MARK-III (2001) | 3 | nos | pragatiiii08 | 15 | |
| 14 | VEHICLE SPEED SENSOR GB | ALS Stallion 5/7.5 Ton 4x4 (2013) | 1 | nos | pragatiiii08 | 15 | |
| 15 | OIL FILTER BIG | MINI BUS SWARAJ MAZDA (2017) | 2 | nos | pragatiiii08 | 15 | |
| 16 | BRAKE SHOE ASSY REAR | TATA SAFARI STORME GS-800 (4x4) BS-IV (2018) | 1 | nos | pragatiiii08 | 15 | |
| 17 | BRAKE SHOE SET | MARUTI SUZUKI Sx4, VXI (BS-IV) (2011) | 1 | nos | pragatiiii08 | 15 | |
| 18 | PIN SET SLIDING CALIPER | MARUTI SUZUKI Sx4, VXI (BS-IV) (2011) | 2 | nos | pragatiiii08 | 15 | |
| 19 | ARM ASSY FRONT SUSPENSION LH | MARUTI SUZUKI Sx4, VXI (BS-IV) (2011) | 1 | nos | pragatiiii08 | 15 | |
| 20 | SR 70 REGULATOR 24V | TRUCK 2.5 TON TATA 4x4 713/32 (2017) | 1 | nos | pragatiiii08 | 15 | |
| 21 | LINK ROD | MARUTI SUZUKI Sx4, VXI (BS-IV) (2011) | 1 | nos | pragatiiii08 | 15 | |
| 22 | AIR HOSE PIPE | LORRY 5/7.5 TON ASHOK LEYLAND STALLION 4x4 MARK-III (2013) | 2 | nos | pragatiiii08 | 15 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Proof of ISO 9001 certification (bidder or OEM)
Evidence of installation/ commissioning capability in INDIA
OEM Authorization (if applicable)
Technical bid documents and vendor code creation documents
GST certificate and financial statements (as applicable)
Bidders must meet ISO 9001 certification, provide PAN, GST, canceled cheque and EFT mandate, and submit OEM authorization if applicable. The bid includes supply, installation, testing, and commissioning with after-sales support; sample display is required at EME, Mhow on 23 Nov 2026 at 12:00 hrs.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, ISO 9001 certificate, OEM authorization if applicable, installation/comissioning capability proof, and technical bid documents; FE/financial statements may be requested per vendor code process.
The warranty is 1 year from the date of final acceptance or after completion of installation, commissioning and testing, whichever is applicable; OEM warranty certificates must accompany the delivery for all items.
Scope covers Supply, Installation, Testing and Commissioning of 22 listed vehicle components, includingHEAD LAMP LH, RADIATOR, CAC with shroud, CLUTCH RELEASE BRG, and other assemblies; samples for fitment will be checked at EME, Mhow.
Yes. The bidder must demonstrate well-established installation, commissioning, training, troubleshooting and maintenance service groups in INDIA, with service centers near consignee destinations and a dedicated toll-free support line.
Samples of all items must be produced/displayed at Static Wksp EME, Mhow on 23 November 2026 at 12:00 hours for quality and fitment checks; non-compliance may affect eligibility.
At minimum, bidders must hold ISO 9001 certification. OEM-specific certifications or authorizations may strengthen the bid; ensure certification documents are submitted with the bid and during delivery.
Payment terms are not detailed in the data; expect standard government terms, potentially milestone-based payments after delivery and acceptance, with possible advance or performance-based milestones subject to contract finalization.