Bid Publish Date
07-Oct-2026, 7:08 pm
Bid End Date
17-Oct-2026, 7:00 pm
Location
Progress
Organization: Metnet : An E-governance Intra-imd Portal New Delhi; Product: Entry and Mid Level Desktop Computers (Q2). Location: Imphal West, Manipur 795001; Estimated Value: Not disclosed; Objective: Equip IMD team with standard desktop PCs under Metnet procurement. Unique clause permits up to 25% quantity variation at contract award and during currency, with rollover delivery timing, calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. This flexibility enables scalability for weather data processing and field operations, while maintaining contracted rates. The absence of BOQ items indicates a broad equipment scope for standard desktops.
Product/service names: Entry and Mid Level Desktop Computers (Q2)
Quantities: Up to 25% quantity variation permitted
Estimated value: Not disclosed
Experience: Not specified in data; refer to RFP
Quality/standards: Not specified; verify in RFP/ATC
Delivery: Based on original delivery period with extended period formula
Key Term 1: 25% quantity variation permitted at contract and during currency
Key Term 2: Delivery extension calculated as (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Key Term 3: Compliance with RFP and ATC documents; price quoting per requirement
Delivery period commences from last date of original delivery order; extended periods allowed with proportional time calculation and minimum 30 days
Bid must comply with RFP document attached to bid; quotes must align with specified requirements
Purchaser may increase/decrease quantity up to 25% at bid/contract and during currency at contracted rates
Submit as per RFP/ATC attachments
Demonstrate experience in supplying desktop computers to government entities
Provide complete financial documentation and GST/PAN credentials
Quantity
5
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Entry and Mid Level Desktop Computer (Q2)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Imphal West
Delivery Pincodes
795001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Tongsin Hedge | 795001,Meteorological Centre, Imphal | Imphal West | Manipur | 795001 | 5 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar desktop computer supply
Financial statements or Annual Turnover documents
EMD documents (as per ATC/RFP if required)
Technical bid documents and compliance certificates
OEM authorizations (if bidding on OEM-branded desktops)
Any other documents specified in the RFP/ATC attachments
Key insights about MANIPUR tender market
Bidders should review the attached RFP and ATC, prepare a bid price per required configuration, and ensure GST, PAN, experience certificates, and financial statements are ready. The bid may include up to a 25% quantity variation and a minimum 30-day delivery baseline; follow the procurement portal submission steps precisely.
Required documents include GST certificate, PAN, experience certificates for similar supply, financial statements, EMD (if called for in ATC), OEM authorizations (if applicable), and technical bid documents demonstrating compliance with the RFP and ATC attachments.
Delivery starts after the original delivery order date; quantity can be increased by up to 25% with rates unchanged. Extended delivery time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum 30 days.
Tender data does not state specific certifications; bidders must verify in the RFP/ATC. Ensure compliance with IMD procurement standards and attach any relevant OEM certifications or IS/industry standards as required by the RFP.
Quote per the RFP requirements, reflecting standard desktop configurations for entry and mid-level use. Include itemized costs for hardware, warranty, and any optional peripherals; ensure alignment with the ATC guidelines and attested compliance statements from the OEM.
The tender data does not specify a deadline; bidders should monitor the tender portal for the official date and time after the RFP/ATC release. Prepare all documents in advance and verify submission steps through the portal’s bid submission guide.
The buyer reserves the right to increase or decrease the bid quantity up to 25% at contract placement and during currency. The calculation for additional time uses the proportion of increased to original quantity with a minimum extension of 30 days.
The procurement is managed by Metnet: An E-governance Intra-imd Portal New Delhi for the India Meteorological Department (IMD); bidders must align with the portal’s ATC and RFP specifications and submit through the designated e-tender platform.