Progress
The Commissionerate Of Technical Education (Gujarat) invites bids for a Digital Tachometer under the Q3 category, with on-site delivery at L. D. College of Engineering, Navarangpura, Ahmedabad. The scope includes installation, commissioning, and training for 8 employees at the specified training location, with a 1-day training duration. Bidders must quote inclusive of all installation accessories and ensure delivery according to option-based quantity adjustments up to 25%. The contract allows quantity flex and extended delivery timelines, assessed from the original delivery period, with a minimum extension of 30 days.
Product: Digital Tachometer (Q3 category)
Delivery location: LD College of Engineering, Room 617, Navarangpura, Ahmedabad
Training: 8 employees, 1 day, at LD College of Engineering Ahmedabad
Installation: All essential accessories included; installation costs embedded in bid
Quantity variation: +25% during contract; extension rules apply with minimum 30 days
Experience criterion: minimum 3 years in supplying similar items to government bodies; provide contract copies
Option clause allows +/-25% quantity change with proportional delivery time
3 years government supply experience required with contract copies
On-site installation and 1-day training for 8 staff at LD College of Engineering
Not explicitly specified in the provided terms; bidder should confirm with issuing authority and align bid price with delivery and installation milestones
Delivery and commissioning to be performed at LD College of Engineering, Ahmedabad; option clause permits 25% quantity variation with proportional extension
Not stated in available terms; bidders should verify LD terms for late delivery penalties or LD provisions during post-bid clarification
Minimum 3 years of regular manufacturing/supply experience to Central/State Govt or PSUs for similar category
Not under liquidation, court receivership, or bankruptcy; must upload a declaration
Non-obsolescence: product must have at least 5 years residual market life at bid time
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+20%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
2
Past Performance
50 %
Warranty Period
5 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Digital Tachometer (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
38
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ahmadabad
Delivery Pincodes
380015
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Patel Vimal Ranchhodlal | 380015,L D College of Engineering Ahmedabad Navrangpura Opposite Gujarat University | Ahmadabad | Gujarat | 380015 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
07-Sep-2026, 9:30 am
Opening Date
07-Sep-2026, 10:00 am
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates for similar Government/Government PSU supply (3 years requirement)
Financial Statements (last 3 years) and solvency information
Bid Security/EMD documents (as per official tender terms)
Technical Bid Documents showing compliance with Digital Tachometer specifications
OEM Authorization/Dealership Certificates (if applicable)
Any installation/service certifications and training capability documents
| Category | Specification | Requirement |
|---|---|---|
| Additional Information | Accessories | Reflectors, self-adhesive, Measuring wheel, Cone & funnel contact tips, Battery, Carrying case, Instruction manual |
| Test Reports | Availability of test report from central Govt/ NABL/ILAC accredited lab covering all parameters | Yes |
| Test Reports | Copies of test Reports/certificates and other certifications to be furnished to buyer on demand at time of supplies | Yes |
Key insights about GUJARAT tender market
Bidders should prepare GST, PAN, 3 years government supply experience with contract copies, EMD documents, OEM authorizations if applicable, and technical bid showing compliance with digital tachometer standards. Ensure installation pricing and 8-person training costs are included and confirm delivery at LD College of Engineering, Ahmedabad.
Required documents include GST certificate, PAN, 3 years government project experience with contract copies, financial statements for the last 3 years, EMD, technical bid, OEM authorizations, and installation/commissioning certificates if available.
Delivery and commissioning must occur at Room 617, Mechanical Engineering Department, LD College of Engineering, Ahmedabad. All essential installation accessories should be included in the bid price, with on-site training for 8 employees on a single day.
Training covers 8 employees, conducted on-site at LD College of Engineering, Ahmedabad. The duration is specified as 1 day, with training material and hands-on usage guidance included in the installation package.
Bidder or OEM must have regularly manufactured and supplied the same or similar category products to a Central/State Government or PSU for 3 years before bid opening, with supporting contract copies.
The purchaser can increase/decrease bid quantity up to 25% at contract placement and during currency, at contracted rates. Delivery time adjusts proportionally with a minimum extension of 30 days, based on the original terms.
Installation and training are specified at LD College of Engineering, Navarangpura, Ahmedabad. Training is at the same site with 8 staff and 1 day duration, and installation must include all essential accessories.