Smart Target System,Master Control Unit,Bullet Containment Trap,40 Feet Container,Visual System,Fir
Indian Army
KUPWARA, JAMMU & KASHMIR
Bid Publish Date
29-Oct-2025, 10:22 am
Bid End Date
08-Nov-2025, 11:00 am
EMD
₹10,00,000
Location
Progress
Quantity
14
Category
SMART TARGET SYSTEM
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a package including SMART TARGET SYSTEM, MASTER CONTROL UNIT, BULLET CONTAINMENT TRAP, 40FEET CONTAINER, VISUAL SYSTEM, FIRER CABIN, RANGE TUBE, VENTILATION SYSTEM, and a four-year Annual Maintenance Cost (AMC) post a three-year warranty. The bid requires an EMD of ₹1,000,000 and delivery considerations tied to a containerised indoor shooting range. The contract contemplates a post-warranty AMC and a performance security regime. The submission process mandates a DD-based EMD with delivery of hardcopy within five days of bid end. Location: Delhi Cantt. Distinctive scope includes containerised indoor shooting range with three-year warranty and AMC extension terms. Bidders should note the AMC rate cap of 10% per annum and quarterly AMC payments post service. This procurement features multiple system components, high integration needs, and long-term support commitments.
Containerised Indoor Shooting Range setup with 3-year warranty
AMC contract for 4 years post-warranty at ≤10% of contract price per annum
EMD ₹1,000,000 via DD to Delhi Cantt account
AMC Payment: quarterly after rendering services
Performance Security: 2% of total AMC value
EMD submission via DD and hardcopy delivery within 5 days
3-year product warranty + 4-year AMC with 10% annual cap
2% AMC performance security; forfeiture risk for non-acceptance
EMD via DD ₹1,000,000; AMC payments quarterly after service; post-warranty AMC capped at 10% annually
Hardcopy EMD proof to be delivered within 5 days of bid end; containerised range installation implied
Performance security of 2% of total AMC value; forfeiture if AMC contract is not accepted
Experience in deploying containerised shooting range or similar high-integrity security systems
Financial stability to sustain 4-year AMC commitments
Ability to provide post-warranty AMC with annual cap and quarterly payments
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SMART TARGET SYSTEM | Tgt Range 10 to 300mtrs Display Points accuracy 5mm Sensing Frame Scrolling Unit WiFi Router, Power Supply Electronics Control Unit CTSR should have features of a Smart Target System STS where the targets should be projected on location of hit and miss LOMAH system located at the Target End. Targets may be any standard scoring targets, pop-up targets. The Robust and smart Target Application software should allow varying the target ranges from 10 to 300 meters inside the container. It should also facilitate different types of exercises such as Grouping, Static, Timed Exercise and Annual Range Course or any other practices as desired by the user. It should confirm displays the point of hit on the target with in an accuracy of 5mm. Though the actual distance of shooting is 10 m, targets should be projected to simulate ranges of up to 300m and thus actually practice shooters in applying the range on the weapon and aiming at that range. Point of hit should be automatically and accurately adjusted by the software. | 2 | pieces | kushagrafive | 180 |
| 2 | MASTER CONTROL UNIT | Desktop, Wifi Router, Power Supply, Printer. Should be equipped outside the Container and should be monitored and operated by the range instructor. It should comprise of CPU,monitors, printer and communication equipment. The CPU should be loaded with Master control software which should enable the instructor to assign different firing practices to the firers. The software should display real time hits and record the complete data of each individual firer/session during firing. The instructor should be able to monitor the live session of firers in monitors and communicate with the firers by communication equipment to guide the firers. The Software should instantly record all the data and enable the instructor to take the print out of the reports/documents. It should allow retrieving the stored data at any time to evaluate or perform any kind of analysis. It should also provide corrective action to the trainee after firing. RAM 16GB, DDR5, 5600MTS, 2Gx64bit, Harddisk 1TB SATA, DVD Writer, SMPS Model MPX-7501-AMAAB-UK, Processor i9-14900k, Cabinet Cooler Master K-380, Processor Fan | 1 | pieces | kushagrafive | 180 |
| 3 | BULLET CONTAINMENT TRAP | Made by using AR500 or AR 550 Armour Steel Plates, Weight 120Kgs Approx The Bullet containment trap should be made up by using AR500 or AR550 armour steel plates and should be placed behind the target to collect all the bullets fired. The Bullet Containment Trap should be manufactured in such a way that to replace and reverse the primary impact plates to any position should increase the life of the system. The system should be positioned in a 10 feet acoustically treated container with provision to easily enter and carry out target maintenance activities. The container should be designed in such a way to quickly attach with the 40 feet CISR container. The bullets contacted the angular plates should be guided into a deceleration chamber where the velocity of projectile will reduced to zero and collected at the Tins provided at bottom. The Bullet Containment Trap should easily give a life of 1.5-2 lakhs of rounds with minimum maintenance activities. | 2 | pieces | kushagrafive | 180 |
| 4 | 40FEET CONTAINER | Length 40feet Width 8feet Height 9Inch Standard MS Corrugated Container Total System Weight 15 Ton The CISR should be designed by using standard 40 feet High cube ISO container | 1 | pieces | kushagrafive | 180 |
| 5 | VISUAL SYSTEM | Perform the shot location on the tgt, Score, Group Size, MPI, X Y Coordinates, Grouping, Zeroing. Each firing lane of CISR should be equipped with FBDU which would enable the firer to monitor and control the targets and exercises in that lane. | 2 | pieces | kushagrafive | 180 |
| 6 | FIRER CABIN | Earn Muffs Each Cabins Doors Equipped with toughened glass to monitor the firing practice by Instr. CISR should have two Independent Tubular Firing Booths with facility to fire from standing, kneeling and lying positions. | 2 | pieces | kushagrafive | 180 |
| 7 | RANGE TUBE | 900mm Internal Diameter, Length 10Meters, Material Cast Steel MS, Weight 2.2Ton Each Tube. The tubes be used in the CISR should be steel rolled of thickness 10mm joined by SEAM welding process. The tubes should be further processed to remove the dents and projected surfaces to eliminate the ricochet problem. | 2 | pieces | kushagrafive | 180 |
| 8 | VENTILATION SYSTEM | Provide CISR 40feet 8feet 9Inch Fresh Air at Firer End, Filtration of the Exhaust air 0.3 microns HEPA Filters The CISR should be equipped with suitable ventilation system to meet the all indoor firing range requirements. The ventilation system of CISR should provide 100% fresh air at firer end. Filtration of the exhaust air to be carried out by HEPA filters. A suitable mechanism to be placed in the system to indicate when filter change is required. The system should be equipped with Indication light at firing booth to display the status of the range. ii. Each firer cabin should be equipped with hooters to identify the position of stop butts. A warning message to be displayed on the screen representing the status of stop butts and no target. The warning message to be displayed until all the equipment in the range is positioned properly. The system should be equipped with fire fighting equipment as per standard norms. | 1 | pieces | kushagrafive | 180 |
| 9 | Annual Maintenance Cost for Four Years Post Three Warranty Period | The CISR should come with a three years complete warranty and an offer of an annual maintenance contract thereafter. Consumables like Rubber blocks, Printer cartridges, AR500 Plates of Bullet Containment Trap and Stop Butt, Target Rubber sheets and all batteries etc.. are not covered under Warranty AMC | 1 | project | kushagrafive | 180 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates demonstrating capability for containerised shooting range deployment
Financial statements and balance sheet for last 3 years
EMD payment receipt or DD copy
Technical bid documents and certified OEM authorizations (if applicable)
Proof of delivery submission within 5 days of bid end
Undertaking for AMC post-warranty with 2% performance security for AMC
Any required warranties or service level agreements with exact terms
Key insights about DELHI tender market
Bidders must submit EMD ₹1,000,000 via DD to PUBLIC FUND ACCT, provide scanned proof, and deliver hardcopy within five days. Include technical bid, OEM authorizations if applicable, GST, PAN, financials, and AMC undertaking. Ensure warranty is 3 years with AMC at max 10% annually.
Required documents include GST certificate, PAN, experience certificates in range deployment, financial statements, EMD/DD proof, technical bid, OEM authorizations, and an undertaking for post-warranty AMC with 2% performance security. All documents must align with bid terms.
The offered products carry a 3-year warranty; post-warranty, a 4-year AMC is required with annual payments capped at 10% of contract price. Quarterly AMC payments are due after service; performance security equals 2% of total AMC value.
Bidder must submit EMD proof and deliver hardcopy documents within 5 days of bid end. The procurement centers on containerised indoor shooting range deployment; explicit delivery timeline beyond installation scope is not stated, so bidders should seek clarifications.
EMD is ₹1,000,000 via Account Payee DD to the Delhi Cantt account; scanned DD proof must be uploaded with the bid, and the physical DD sent to the buyer within five days of bid end date.
If the bidder/OEM fails to accept the AMC contract when called upon, the Performance Security may be forfeited. The AMC framework requires a 2% security of the total AMC value for verification and closure.
Key components include SMART TARGET SYSTEM, MASTER CONTROL UNIT, BULLET CONTAINMENT TRAP, 40FEET CONTAINER, VISUAL SYSTEM, FIRER CABIN, RANGE TUBE, and VENTILATION SYSTEM. The BOQ lists nine items, though detailed quantities are not provided in the data.
AMC payments are made quarterly after service rendering; post-warranty AMC is contingent on contract execution. Ensure that the AMC price does not exceed 10% per year and confirm the 2% performance security is maintained for the duration.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS