TenderDekho Logo
Closed GEM

Hindustan Aeronautics Limited ESD Ergonomic Chairs & Workbench Tender Nashik Maharashtra 2026 - 24 Month On-site Warranty

Bid Publish Date

05-Sep-2026, 8:10 pm

Bid End Date

15-Sep-2026, 9:00 pm

Progress

Issue05-Sep-2026, 8:10 pm
AwardPending

Key Highlights

  • • Brand/OEM references: Not specified in data; attachment indicates need for compliance with HAL-specified technical specs
  • • Technical standards/certifications: Not explicitly listed; bidders must sign compliance to 'Buyer Specification Document'
  • • Special clauses: 24-month on-site warranty; downtime extension equal to defect downtime after HAL notification
  • • Eligibility: 3-site delivery capability; installation and commissioning across Dundigal, Tambaram, Nashik

Tender Overview

Organization: Hindustan Aeronautics Limited (HAL) — Department of Defence Production. Procurement category includes ESD ergonomic chairs, stools, workbenches, file storage racks, wooden workbenches, soldering/desoldering stations, ESD floor mats, portable inspection lamps, tool kits and ESD items. Nine total items to be supplied and installed at three sites: Dundigal (AFA HTT40 FSR), Tambaram (FIS HTT40 FSR), and HAL Nashik. Delivery window: 4 weeks from PO; installation and commissioning within 15 days post-receipt at all sites. Warranty: minimum 24 months on-site from functional acceptance. Delivery must include testing, commissioning and on-site support. Unique multi-site installation scope with site-specific quantities per Appendix-1.

Technical Specifications & Requirements

  • Scope covers supply, installation, testing and commissioning of the nine items across three locations.
  • Warranty: on-site for 24 months; downtime extension if defects not rectified within 10 days of HAL notification.
  • Delivery of items to Dundigal, Tambaram and Nashik within 4 weeks; installation/commissioning at three sites within 15 days of material receipt.
  • Compliance: bidders must upload signed compliance of attached technical specifications; evaluation will rely on HAL-specified criteria in the Buyer Specification Document.
  • Documentation: GSTIN, PAN, cancelled cheque and EFT mandate required; suppliers must adhere to at least basic corporate certificates.

Terms, Conditions & Eligibility

  • EMD details not specified in data; GST will be reimbursed per actuals or applicable rate (capped to quoted GST).
  • Delivery and payment terms: delivery within 4 weeks; installation within 15 days; payment terms not detailed in data (likely per HAL standard).
  • MSME/Start-up advance: 15% interest-free advance on basic price.
  • Documentation: upload signed compliance to technical specs; ensure all specified certificates are provided.
  • Compliance: must supply complete documentation including PAN, GSTIN, cancelled cheque, EFT mandate; non-submission may lead to rejection.
  • Inspection: HAL offices at IAF bases act as inspection agencies for all sites.

Key Specifications

  • Nine items including ESD chairs, stools, workbenches, file racks, wooden workbenches, soldering/desoldering station, ESD floor mat, portable inspection lamp, tool kit

  • Delivery to three sites: AFA Dundigal, FIS Tambaram, HAL Nashik within 4 weeks

  • Installation and commissioning within 15 days from material receipt at all three sites

  • On-site warranty minimum: 24 months from functional acceptance

  • Inspection by HAL offices at IAF bases; compliance with Buyer Specification Document

Terms & Conditions

  • Delivery window: 4 weeks from PO; installation within 15 days

  • Minimum 24-month on-site warranty with downtime extension for unresolved defects

  • Mandatory signed compliance to technical specifications and submission of required documents

Important Clauses

Payment Terms

GST reimbursement at actuals or applicable rate (whichever is lower); no explicit payment schedule provided in data

Delivery Schedule

All nine items to be delivered to three sites: Dundigal, Tambaram, HAL Nashik within 4 weeks; installation within 15 days of receipt

Penalties/Liquidated Damages

Not explicitly defined; governed by Buyer Specification Document and HAL terms; potential penalties per spec

Bidder Eligibility

  • Capability to deliver and install across three distinct sites (Dundigal, Tambaram, Nashik)

  • On-site warranty service capability for 24 months

  • Compliance with HAL Buyer Specification Document and technical specs

  • Submission of PAN, GSTIN, cancelled cheque, EFT mandate

Advertisement

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

162

Category

File Storage Rack

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

ESD Ergonomic Chairs Stool , ESD Workbench , File Storage Rack , Wooden Workbench , Soldering De soldering Station , ESD Items , Portable Inspection Lamp , ESD Floor Mat , Tool Kit

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

28

Delivery Locations

1

Delivery Cities

NASHIK RURAL

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NASHIK RURALNASHIK RURAL--1628-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9843829.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

ESD Ergonomic Chairs Stool

612101504122

16 nos Delivery: 28 days
#2

ESD Workbench

612101504128

2 nos Delivery: 28 days
#3

File Storage Rack

612101504129

19 nos Delivery: 28 days
#4

Wooden Workbench

612101504130

6 nos Delivery: 28 days
#5

Soldering De soldering Station

612101504132

3 nos Delivery: 28 days
#6

ESD Items

612101504135

2 set Delivery: 28 days
#7

Portable Inspection Lamp

612101504136

10 nos Delivery: 28 days
#8

ESD Floor Mat

612101504137

100 nos Delivery: 28 days
#9

Tool Kit

612101504134

4 set Delivery: 28 days
Advertisement

Categories 16

Required Documents

1

PAN card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

Signup/compliance of technical specifications (signed & stamped)

6

GST payment documentation (if applicable)

7

Any OEM authorization or vendor code creation documents as requested

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for HAL Nashik ESD items tender 2026 in Maharashtra

Bidders must sign the compliance of the HAL Buyer Specification Document, submit PAN, GSTIN, cancelled cheque and EFT mandate. Provide GST handling details, attach OEM authorizations if required, and confirm delivery capability to Dundigal, Tambaram, and Nashik within 4 weeks plus 15 days for installation.

What documents are required for HAL Nashik supply tender 2026

Required documents include PAN card, GSTIN, cancelled cheque, EFT mandate, signed compliance to technical specifications, and any OEM authorizations. Also supply financials as per HAL terms and ensure GST reimbursement terms are acknowledged.

What are the technical spec expectations for HAL ESD items

Tender requires signed compliance to the Buyer Specification Document; items include ESD chairs, stools, workbenches, file racks, soldering/desoldering stations, ESD floor mats, lamps, and tool kits, with on-site installation and testing at three sites.

When is delivery required for the HAL procurement across sites

All nine items must be delivered within 4 weeks from the Purchase Order date, with on-site installation completed within 15 days after material receipt at Dundigal, Tambaram, and Nashik.

What is the warranty period for HAL Nashik ESD equipment

Minimum 24-month on-site warranty from the date of functional acceptance; HAL may extend warranty equivalent to any downtime until defect rectification. Defects reported by HAL must be resolved within 10 days to trigger extension.

What are the inspection arrangements for HAL Nashik tender

Inspection will be conducted by HAL offices located at IAF bases for all locations; ensure compliance to technical specs and provide installation evidence, site acceptance testing, and commissioning reports.

What is required for GST reimbursement in HAL tender 2026

GST will be reimbursed as actuals or at applicable rates (whichever is lower), capped to the quoted GST percentage; bidders should maintain compliant GSTIN filings and provide tax invoices per site deliveries.

What delivery sites are included in the HAL three-site tender

Delivery sites include AFA Dundigal (HTT40 FSR Office), FIS Tambaram (Flight Instructor School), and HAL Nashik; quantities are defined in Appendix-1 and must be fulfilled with installation at each site.

Advertisement