Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Trans
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Progress
Quantity
1
Bid Type
Two Packet Bid
Central Transmission Utility Of India Limited seeks an Independent Engineer for Transmission Scheme NERES-XXV Part-A in Gurgaon, Haryana. The engagement is milestone/deliverable based with an EMD of ₹2,66,000. The scope includes overseeing energy transmission components under the North-Eastern Region Expansion Scheme-XXV, with EIC deployment led by Shri Sanjeev Singh. No BOQ items are listed, but the contract includes quantity and duration adjustments up to 25% at issuance and post-issuance, per ATC. This opportunity targets experienced consulting entities capable of managing high-stakes transmission projects within a government procurement framework. Key differentiator includes ATC-based scope flexibility and mandatory adherence to GeM ATC superseding GTC/SLA terms. This tender is a government procurement opportunity in Gurgaon, Haryana, aimed at ensuring independent technical oversight for scheme implementation.
Organization: Central Transmission Utility Of India Limited
Location: Gurgaon, Haryana 122001
Role: Independent Engineer for Transmission Scheme NERES-XXV Part-A
EMD: ₹2,66,000
Delivery: Milestone/deliverable based with 25% quantity/duration adjustment
ATC Supersession: ATC terms override GeM GTC/SLA
EIC: Shri Sanjeev Singh
Excess Settlement: Additional charges up to specified percentage with documents
EMD amount and online submission requirements
Milestone/deliverable based payment terms
25% adjustment window for quantity or duration
ATC supersedes standard GeM terms
Delivery oversight for NERES-XXV Part-A with EIC named
Milestone-based payments aligned with contract deliverables; EMD ₹2,66,000 payable online or as per defined method in ATC.
Milestone/deliverable based: duration may be increased up to 25% at contract issue and execution; EIC oversight required.
Penalties aligned with ATC terms for late milestones; details to be in RfP/ATC uploaded document.
Experience as Independent Engineer in transmission projects or equivalent
Proof of GST registration and PAN
Financial stability with requisite statements
OEM authorizations if applicable per ATC
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Central Transmission Utility Of India Limited
Central Transmission Utility Of India Limited
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
29-Dec-2025, 3:00 pm
Opening Date
29-Dec-2025, 3:30 pm
Key insights about HARYANA tender market
Bidders must submit EMD of ₹2,66,000 online, GST and PAN details, experience certificates, financial statements, and technical compliance documents. ATC-specific terms govern superseding GeM GTC. Ensure EIC assigned and ready to meet NERES-XXV Part-A scope.
Submit GST certificate, PAN card, company financial statements, experience certificates for similar projects, OEM authorizations if applicable, technical bid documents, EMD receipt, and any GeM-uploaded ATC documents. Ensure compliance with RfP terms.
Proven experience in transmission scheme oversight, ability to manage milestone deliverables, and familiarity with ATC-driven scope changes up to 25%. Must align with EIC Shri Sanjeev Singh's assignment and NERES-XXV Part-A requirements.
The EMD of ₹2,66,000 is required at bid submission per tender ATC; payment must be compliant with online transfer or as specified in the ATC document uploaded on GeM.
Delivery is milestone/deliverable based with the possibility of a 25% adjustment in quantity or duration at contract issue and execution, as per ATC guidance and GeM upload.
Penalties follow ATC terms; late milestones trigger liquidated damages per the RfP ATC document, with explicit rates and conditions defined there.
Standards are defined in the ATC/RfP; expect GeM ATC supersession and possible OEM authorizations; IS/IEC or equivalent compliance may be required per scope.
Verify eligibility by matching experience in transmission projects, ensuring GST/PAN, submitting financials, EMD, and OEM authorizations as applicable; confirm assignment of EIC and adherence to ATC terms.
Indian Army
📍 KANCHIPURAM, TAMIL NADU
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS