TenderDekho Logo
Closed GEM

Tender Notice for 2 Megapixel Outdoor Colour Dome PTZ Camera,2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera in CHITRAKOOT, UTTAR PRADESH

Bid Publish Date

24-Jun-2025, 1:10 pm

Bid End Date

15-Jul-2025, 2:00 pm

EMD

₹7,73,455

Progress

RA
Issue24-Jun-2025, 1:10 pm
Reverse AuctionCompleted
Award28-Aug-2025, 1:41 am
Explore all 4 tabs to view complete tender details

Quantity

10403

Categories 91

Airports Authority Of India, rhq Nr - Rangpuri invites bids for 2 Megapixel Outdoor Colour Dome PTZ Camera, 2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera, 8 Channel NVR, 8 Port L2 Switch, Workstation and Display, 9U Indoor networking rack, IP based Intelligent Master Access Controller, Intelligent Slave Access Controller, Smart Card Reader and Exit Push Button, Electro magnetic Lock for Single Door, Electro magnetic Lock for Double Door, of 8 Core x 1. 0 sq mm multi strand unarmoured copper Cable, 3 KVA Online UPS, PVC Conduit, CAT 6 UTP data cable, 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable, 3 core 1. 5 sqmm multi strand power cable, Copper plate Earthing, Installation Testing Commissioning, CAMC 1st Year, CAMC 2nd Year, CAMC 3rd Year, 2 Megapixel Varifocal Indoor Fixed Color Dome Camera, 16 Channel NVR, 24 Port L2 Switch, 24 U Equipment Rack, 5 KVA Online UPS, 06 Core SMF Optic OFC, 40mm dia HDPE pipe, Light guide Interconnect Unit, Media Converter in CHITRAKOOT, UTTAR PRADESH. Quantity: 10403. Submission Deadline: 15-07-2025 14: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

2 Megapixel Outdoor Colour Dome PTZ Camera , 2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera , 8 Channel NVR , 8 Port L2 Switch , Workstation and Display , 9U Indoor networking rack , IP based Intelligent Master Access Controller , Intelligent Slave Access Controller , Smart Card Reader and Exit Push Button , Electro magnetic Lock for Single Door , Electro magnetic Lock for Double Door , of 8 Core x 1.0 sq mm multi strand unarmoured copper Cable , 3 KVA Online UPS , PVC Conduit , CAT 6 UTP data cable , 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable , 3 core 1.5 sqmm multi strand power cable , Copper plate Earthing , Installation Testing Commissioning , CAMC 1st Year , CAMC 2nd Year , CAMC 3rd Year , 2 Megapixel Varifocal Indoor Fixed Color Dome Camera , 16 Channel NVR , 24 Port L2 Switch , 24 U Equipment Rack , 5 KVA Online UPS , 06 Core SMF Optic OFC , 40mm dia HDPE pipe , Light guide Interconnect Unit , Media Converter

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8003382.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 163 Items Sign in for GEM prices

#1

2 Megapixel Outdoor Colour Dome PTZ Camera

2 Megapixel Outdoor Colour Dome PTZ Camera complete with camera mount and all accessories including power supply and junction box as per specifications

4 numbers Delivery: 120 days
#2

2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera

2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera complete with camera mount and all accessories including power supply and Junction Box as per specifications

11 numbers Delivery: 120 days
#3

8 Channel NVR

8 Channel NVR with required hard disk having RAID recording capacity for 30 days as per specification

3 numbers Delivery: 120 days
#4

8 Port L2 Switch

8 Ports L2 Switch fully populated with all required modules as per specifications.

3 numbers Delivery: 120 days
#5

Workstation and Display

Workstation including Operating system and Anti virus with Keyboard and Optical Scroll Mouse and 43 inch Display as per specifications

3 numbers Delivery: 120 days
#6

9U Indoor networking rack

9U Indoor networking rack

3 numbers Delivery: 120 days
#7

IP based Intelligent Master Access Controller

IP based Intelligent Master Access Controller with associted software as per specification

3 numbers Delivery: 120 days
#8

Intelligent Slave Access Controller

Intelligent Slave Access Controller as per specification

4 numbers Delivery: 120 days
#9

Smart Card Reader and Exit Push Button

Smart Card Reader and Exit Push Button with 50 No of OEM Programmed unprinted Smart Cards

7 numbers Delivery: 120 days
#10

Electro magnetic Lock for Single Door

Electro magnetic Lock and Holding force with Power supply for Single Door Leaf with Magnetic contact

5 numbers Delivery: 120 days
#11

Electro magnetic Lock for Double Door

Electro magnetic Lock and Holding force with Power supply for Double ddoor leaf with Magnetic contact

2 numbers Delivery: 120 days
#12

of 8 Core x 1.0 sq mm multi strand unarmoured copper Cable

Supply of 8 Core x 1.0 sq mm multi strand unarmored Copper Cable between every card reader and the access controller

300 meters Delivery: 120 days
#13

3 KVA Online UPS

3 KVA Online UPS in redundant configuration Qty. 2x3KVA with SMF batteries with 30 minutes of battery backup with each UPS as per specifications.

3 set Delivery: 120 days
#14

PVC Conduit

Supply and laying of 25 mm dia 16 SWG ISI Marked PVC Conduit with all bends Tees and other accessories as per Site requirement

600 meters Delivery: 120 days
#15

CAT 6 UTP data cable

Supply and laying of CAT 6 UTP data cable in conduit or pipe on surface with connectors termination etc. required as per specifications.

3 roll Delivery: 120 days
#16

3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable

Supply and laying of 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per site requirement

200 meters Delivery: 120 days
#17

3 core 1.5 sqmm multi strand power cable

Supply and laying of 3 core 1.5 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per specifications.

300 meters Delivery: 120 days
#18

Copper plate Earthing

Copper plate Earthing as per specification with 30 Mtr copper strip per earthing

3 numbers Delivery: 120 days
#19

Installation Testing Commissioning

Installation Testing Commissioning of the complete system alongwith training and documentation as per site requirement

1 numbers Delivery: 120 days
#20

CAMC 1st Year

CAMC for 1st Year at the rate of 4.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#21

CAMC 2nd Year

CAMC for 1st Year at the rate of 5.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#22

CAMC 3rd Year

CAMC for 1st Year at the rate of 6.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#23

2 Megapixel Outdoor Colour Dome PTZ Camera

2 Megapixel Outdoor Colour Dome PTZ Camera complete with camera mount and all accessories including power supply and junction box as per specifications

1 numbers Delivery: 120 days
#24

2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera

2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera complete with camera mount and all accessories including power supply and Junction Box as per specifications

4 numbers Delivery: 120 days
#25

2 Megapixel Varifocal Indoor Fixed Color Dome Camera

2 Megapixel Varifocal Indoor Fixed Colour Dome Camera complete with camera mount and all accessories as per specifications.

8 numbers Delivery: 120 days
#26

16 Channel NVR

16 Channel NVR with required hard disk having RAID recording capacity for 30 days as per specifications

1 numbers Delivery: 120 days
#27

24 Port L2 Switch

24 Port L2 Switch fully populated with all required modules with 24 Port Jack Panel and SM Optic Fibre and Cat 6 patch cords Connectors etc. as per specifications.

2 numbers Delivery: 120 days
#28

8 Port L2 Switch

8 Ports L2 Switch fully populated with all required modules as per specifications.

2 numbers Delivery: 120 days
#29

Workstation and Display

Workstation including Operating system and Anti virus with Keyboard Optical Scroll Mouse and 43 inch Display as per specifications

1 numbers Delivery: 120 days
#30

24 U Equipment Rack

19 inch Equipment Rack 24U including Patch Panel Cable Manager accessories etc. as per specifications.

1 numbers Delivery: 120 days
#31

9U Indoor networking rack

9U Indoor networking rack

7 numbers Delivery: 120 days
#32

IP based Intelligent Master Access Controller

IP based Intelligent Master Access Controller with associted software as per specification

1 numbers Delivery: 120 days
#33

Intelligent Slave Access Controller

Intelligent Slave Access Controller as per specification

2 numbers Delivery: 120 days
#34

Smart Card Reader and Exit Push Button

Smart Card Reader and Exit Push Button with 50 No of OEM Programmed unprinted Smart Cards

6 numbers Delivery: 120 days
#35

Electro magnetic Lock for Single Door

Electro magnetic Lock and Holding force with Power supply for Single Door Leaf with Magnetic contact

6 numbers Delivery: 120 days
#36

of 8 Core x 1.0 sq mm multi strand unarmoured copper Cable

Supply of 8 Core x 1.0 sq mm multi strand unarmored Copper Cable between every card reader and the access controller

400 meters Delivery: 120 days
#37

PVC Conduit

Supply and laying of 25 mm dia 16 SWG ISI Marked PVC Conduit with all bends Tees and other accessories as per Site requirement

500 meters Delivery: 120 days
#38

CAT 6 UTP data cable

Supply and laying of CAT 6 UTP data cable in conduit or pipe on surface with connectors termination etc. required as per specifications.

7 roll Delivery: 120 days
#39

3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable

Supply and laying of 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per site requirement

200 meters Delivery: 120 days
#40

3 core 1.5 sqmm multi strand power cable

Supply and laying of 3 core 1.5 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per specifications.

500 meters Delivery: 120 days
#41

Copper plate Earthing

Copper plate Earthing as per specification with 30 Mtr copper strip per earthing

3 numbers Delivery: 120 days
#42

Installation Testing Commissioning

Installation Testing Commissioning of the complete system alongwith training and documentation as per site requirement

1 numbers Delivery: 120 days
#43

CAMC 1st Year

CAMC for 1st Year at the rate of 4.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#44

CAMC 2nd Year

CAMC for 1st Year at the rate of 5.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#45

CAMC 3rd Year

CAMC for 1st Year at the rate of 6.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#46

2 Megapixel Varifocal Indoor Fixed Color Dome Camera

2 Megapixel Varifocal Indoor Fixed Colour Dome Camera complete with camera mount and all accessories as per specifications.

4 numbers Delivery: 120 days
#47

8 Channel NVR

8 Channel NVR with required hard disk having RAID recording capacity for 30 days as per specification

1 numbers Delivery: 120 days
#48

24 Port L2 Switch

24 Port L2 Switch fully populated with all required modules with 24 Port Jack Panel and SM Optic Fibre and Cat 6 patch cords Connectors etc. as per specifications.

1 numbers Delivery: 120 days
#49

8 Port L2 Switch

8 Ports L2 Switch fully populated with all required modules as per specifications.

1 numbers Delivery: 120 days
#50

Workstation and Display

Workstation including Operating system and Anti virus with Keyboard and Optical Scroll Mouse and 43 inch Display as per specifications

1 numbers Delivery: 120 days
#51

24 U Equipment Rack

19 inch Equipment Rack 24U including Patch Panel Cable Manager accessories etc. as per specifications.

1 numbers Delivery: 120 days
#52

9U Indoor networking rack

9U Indoor networking rack

2 numbers Delivery: 120 days
#53

IP based Intelligent Master Access Controller

IP based Intelligent Master Access Controller with associted software as per specification

1 numbers Delivery: 120 days
#54

Intelligent Slave Access Controller

Intelligent Slave Access Controller as per specification

1 numbers Delivery: 120 days
#55

Smart Card Reader and Exit Push Button

Smart Card Reader and Exit Push Button with 50 No of OEM Programmed unprinted Smart Cards

4 numbers Delivery: 120 days
#56

Electro magnetic Lock for Single Door

Electro magnetic Lock and Holding force with Power supply for Single Door Leaf with Magnetic contact

4 numbers Delivery: 120 days
#57

of 8 Core x 1.0 sq mm multi strand unarmoured copper Cable

Supply of 8 Core x 1.0 sq mm multi strand unarmored Copper Cable between every card reader and the access controller

200 meters Delivery: 120 days
#58

5 KVA Online UPS

5 KVA Online UPS in redundant configuration Qty. 2x5KVA with SMF batteries with 30 minutes of battery backup with each UPS as per specifications.

1 set Delivery: 120 days
#59

PVC Conduit

Supply and laying of 25 mm dia 16 SWG ISI Marked PVC Conduit with all bends Tees and other accessories as per Site requirement

500 meters Delivery: 120 days
#60

CAT 6 UTP data cable

Supply and laying of CAT 6 UTP data cable in conduit or pipe on surface with connectors termination etc. required as per specifications.

2 roll Delivery: 120 days
#61

3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable

Supply and laying of 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per site requirement

100 meters Delivery: 120 days
#62

3 core 1.5 sqmm multi strand power cable

Supply and laying of 3 core 1.5 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per specifications.

200 meters Delivery: 120 days
#63

Copper plate Earthing

Copper plate Earthing as per specification with 30 Mtr copper strip per earthing

3 numbers Delivery: 120 days
#64

Installation Testing Commissioning

Installation Testing Commissioning of the complete system alongwith training and documentation as per site requirement

1 numbers Delivery: 120 days
#65

CAMC 1st Year

CAMC for 1st Year at the rate of 4.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#66

CAMC 2nd Year

CAMC for 1st Year at the rate of 5.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#67

CAMC 3rd Year

CAMC for 1st Year at the rate of 6.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#68

2 Megapixel Varifocal Indoor Fixed Color Dome Camera

2 Megapixel Varifocal Indoor Fixed Colour Dome Camera complete with camera mount and all accessories as per specifications.

5 numbers Delivery: 120 days
#69

8 Channel NVR

8 Channel NVR with required hard disk having RAID recording capacity for 30 days as per specification

1 numbers Delivery: 120 days
#70

24 Port L2 Switch

24 Port L2 Switch fully populated with all required modules with 24 Port Jack Panel and SM Optic Fibre and Cat 6 patch cords Connectors etc. as per specifications.

1 numbers Delivery: 120 days
#71

8 Port L2 Switch

8 Ports L2 Switch fully populated with all required modules as per specifications.

1 numbers Delivery: 120 days
#72

Workstation and Display

Workstation including Operating system and Anti virus with Keyboard and Optical Scroll Mouse and 43 inch Display as per specifications

1 numbers Delivery: 120 days
#73

24 U Equipment Rack

19 inch Equipment Rack 24U including Patch Panel Cable Manager accessories etc. as per specifications.

1 numbers Delivery: 120 days
#74

9U Indoor networking rack

9U Indoor networking rack

2 numbers Delivery: 120 days
#75

IP based Intelligent Master Access Controller

IP based Intelligent Master Access Controller with associted software as per specification

1 numbers Delivery: 120 days
#76

Intelligent Slave Access Controller

Intelligent Slave Access Controller as per specification

1 numbers Delivery: 120 days
#77

Smart Card Reader and Exit Push Button

Smart Card Reader and Exit Push Button with 50 No of OEM Programmed unprinted Smart Cards

4 numbers Delivery: 120 days
#78

Electro magnetic Lock for Double Door

Electro magnetic Lock and Holding force with Power supply for Double ddoor leaf with Magnetic contact

4 numbers Delivery: 120 days
#79

of 8 Core x 1.0 sq mm multi strand unarmoured copper Cable

Supply of 8 Core x 1.0 sq mm multi strand unarmored Copper Cable between every card reader and the access controller

200 meters Delivery: 120 days
#80

5 KVA Online UPS

5 KVA Online UPS in redundant configuration Qty. 2x5KVA with SMF batteries with 30 minutes of battery backup with each UPS as per specifications.

1 set Delivery: 120 days
#81

PVC Conduit

Supply and laying of 25 mm dia 16 SWG ISI Marked PVC Conduit with all bends Tees and other accessories as per Site requirement

500 meters Delivery: 120 days
#82

CAT 6 UTP data cable

Supply and laying of CAT 6 UTP data cable in conduit or pipe on surface with connectors termination etc. required as per specifications.

2 roll Delivery: 120 days
#83

3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable

Supply and laying of 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per site requirement

100 meters Delivery: 120 days
#84

3 core 1.5 sqmm multi strand power cable

Supply and laying of 3 core 1.5 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per specifications.

200 meters Delivery: 120 days
#85

Copper plate Earthing

Copper plate Earthing as per specification with 30 Mtr copper strip per earthing

3 numbers Delivery: 120 days
#86

Installation Testing Commissioning

Installation Testing Commissioning of the complete system alongwith training and documentation as per site requirement

1 numbers Delivery: 120 days
#87

CAMC 1st Year

CAMC for 1st Year at the rate of 4.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#88

CAMC 2nd Year

CAMC for 1st Year at the rate of 5.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#89

CAMC 3rd Year

CAMC for 1st Year at the rate of 6.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#90

2 Megapixel Outdoor Colour Dome PTZ Camera

2 Megapixel Outdoor Colour Dome PTZ Camera complete with camera mount and all accessories including power supply and junction box as per specifications

3 numbers Delivery: 120 days
#91

2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera

2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera complete with camera mount and all accessories including power supply and Junction Box as per specifications

2 numbers Delivery: 120 days
#92

2 Megapixel Varifocal Indoor Fixed Color Dome Camera

2 Megapixel Varifocal Indoor Fixed Colour Dome Camera complete with camera mount and all accessories as per specifications.

6 numbers Delivery: 120 days
#93

16 Channel NVR

16 Channel NVR with required hard disk having RAID recording capacity for 30 days as per specifications

1 numbers Delivery: 120 days
#94

24 Port L2 Switch

24 Port L2 Switch fully populated with all required modules with 24 Port Jack Panel and SM Optic Fibre and Cat 6 patch cords Connectors etc. as per specifications.

1 numbers Delivery: 120 days
#95

8 Port L2 Switch

8 Ports L2 Switch fully populated with all required modules as per specifications.

2 numbers Delivery: 120 days
#96

Workstation and Display

Workstation including Operating system and Anti virus with Keyboard and Optical Scroll Mouse and 43 inch Display as per specifications

1 numbers Delivery: 120 days
#97

24 U Equipment Rack

19 inch Equipment Rack 24U including Patch Panel Cable Manager accessories etc. as per specifications.

1 numbers Delivery: 120 days
#98

9U Indoor networking rack

9U Indoor networking rack

3 numbers Delivery: 120 days
#99

IP based Intelligent Master Access Controller

IP based Intelligent Master Access Controller with associted software as per specification

1 numbers Delivery: 120 days
#100

Intelligent Slave Access Controller

Intelligent Slave Access Controller as per specification

2 numbers Delivery: 120 days
#101

Smart Card Reader and Exit Push Button

Smart Card Reader and Exit Push Button with 50 No of OEM Programmed unprinted Smart Cards

3 numbers Delivery: 120 days
#102

Electro magnetic Lock for Single Door

Electro magnetic Lock and Holding force with Power supply for Single Door Leaf with Magnetic contact

2 numbers Delivery: 120 days
#103

Electro magnetic Lock for Double Door

Electro magnetic Lock and Holding force with Power supply for Double ddoor leaf with Magnetic contact

1 numbers Delivery: 120 days
#104

of 8 Core x 1.0 sq mm multi strand unarmoured copper Cable

Supply of 8 Core x 1.0 sq mm multi strand unarmored Copper Cable between every card reader and the access controller

200 meters Delivery: 120 days
#105

5 KVA Online UPS

5 KVA Online UPS in redundant configuration Qty. 2x5KVA with SMF batteries with 30 minutes of battery backup with each UPS as per specifications.

1 set Delivery: 120 days
#106

PVC Conduit

Supply and laying of 25 mm dia 16 SWG ISI Marked PVC Conduit with all bends Tees and other accessories as per Site requirement

500 meters Delivery: 120 days
#107

CAT 6 UTP data cable

Supply and laying of CAT 6 UTP data cable in conduit or pipe on surface with connectors termination etc. required as per specifications.

3 roll Delivery: 120 days
#108

3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable

Supply and laying of 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per site requirement

200 meters Delivery: 120 days
#109

3 core 1.5 sqmm multi strand power cable

Supply and laying of 3 core 1.5 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per specifications.

500 meters Delivery: 120 days
#110

Copper plate Earthing

Copper plate Earthing as per specification with 30 Mtr copper strip per earthing

3 numbers Delivery: 120 days
#111

Installation Testing Commissioning

Installation Testing Commissioning of the complete system alongwith training and documentation as per site requirement

1 numbers Delivery: 120 days
#112

CAMC 1st Year

CAMC for 1st Year at the rate of 4.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#113

CAMC 2nd Year

CAMC for 1st Year at the rate of 5.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#114

CAMC 3rd Year

CAMC for 1st Year at the rate of 6.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#115

2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera

2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera complete with camera mount and all accessories including power supply and Junction Box as per specifications

2 numbers Delivery: 120 days
#116

2 Megapixel Varifocal Indoor Fixed Color Dome Camera

2 Megapixel Varifocal Indoor Fixed Colour Dome Camera complete with camera mount and all accessories as per specifications.

4 numbers Delivery: 120 days
#117

8 Channel NVR

8 Channel NVR with required hard disk having RAID recording capacity for 30 days as per specification

1 numbers Delivery: 120 days
#118

24 Port L2 Switch

24 Port L2 Switch fully populated with all required modules with 24 Port Jack Panel and SM Optic Fibre and Cat 6 patch cords Connectors etc. as per specifications.

1 numbers Delivery: 120 days
#119

8 Port L2 Switch

8 Ports L2 Switch fully populated with all required modules as per specifications.

1 numbers Delivery: 120 days
#120

Workstation and Display

Workstation including Operating system and Anti virus with Keyboard Optical Scroll Mouse and 43 inch Display as per specifications

1 numbers Delivery: 120 days
#121

24 U Equipment Rack

19 inch Equipment Rack 24U including Patch Panel Cable Manager accessories etc. as per specifications.

1 numbers Delivery: 120 days
#122

9U Indoor networking rack

9U Indoor networking rack

2 numbers Delivery: 120 days
#123

IP based Intelligent Master Access Controller

IP based Intelligent Master Access Controller with associted software as per specification

1 numbers Delivery: 120 days
#124

Intelligent Slave Access Controller

Intelligent Slave Access Controller as per specification

2 numbers Delivery: 120 days
#125

Smart Card Reader and Exit Push Button

Smart Card Reader and Exit Push Button with 50 No of OEM Programmed unprinted Smart Cards

5 numbers Delivery: 120 days
#126

Electro magnetic Lock for Single Door

Electro magnetic Lock and Holding force with Power supply for Single Door Leaf with Magnetic contact

5 numbers Delivery: 120 days
#127

of 8 Core x 1.0 sq mm multi strand unarmoured copper Cable

Supply of 8 Core x 1.0 sq mm multi strand unarmored Copper Cable between every card reader and the access controller

200 meters Delivery: 120 days
#128

5 KVA Online UPS

5 KVA Online UPS in redundant configuration Qty. 2x5KVA with SMF batteries with 30 minutes of battery backup with each UPS as per specifications.

1 set Delivery: 120 days
#129

PVC Conduit

Supply and laying of 25 mm dia 16 SWG ISI Marked PVC Conduit with all bends Tees and other accessories as per Site requirement

500 meters Delivery: 120 days
#130

CAT 6 UTP data cable

Supply and laying of CAT 6 UTP data cable in conduit or pipe on surface with connectors termination etc. required as per specifications.

3 roll Delivery: 120 days
#131

3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable

Supply and laying of 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per site requirement

100 meters Delivery: 120 days
#132

3 core 1.5 sqmm multi strand power cable

Supply and laying of 3 core 1.5 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per specifications.

300 meters Delivery: 120 days
#133

Copper plate Earthing

Copper plate Earthing as per specification with 30 Mtr copper strip per earthing

3 numbers Delivery: 120 days
#134

Installation Testing Commissioning

Installation Testing Commissioning of the complete system alongwith training and documentation as per site requirement

1 numbers Delivery: 120 days
#135

CAMC 1st Year

CAMC for 1st Year at the rate of 4.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#136

CAMC 2nd Year

CAMC for 1st Year at the rate of 5.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#137

CAMC 3rd Year

CAMC for 1st Year at the rate of 6.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#138

2 Megapixel Varifocal Indoor Fixed Color Dome Camera

2 Megapixel Varifocal Indoor Fixed Colour Dome Camera complete with camera mount and all accessories as per specifications.

6 numbers Delivery: 120 days
#139

8 Channel NVR

8 Channel NVR with required hard disk having RAID recording capacity for 30 days as per specification

1 numbers Delivery: 120 days
#140

24 Port L2 Switch

24 Port L2 Switch fully populated with all required modules with 24 Port Jack Panel and SM Optic Fibre and Cat 6 patch cords Connectors etc. as per specifications.

1 numbers Delivery: 120 days
#141

8 Port L2 Switch

8 Ports L2 Switch fully populated with all required modules as per specifications.

1 numbers Delivery: 120 days
#142

Workstation and Display

Workstation including Operating system and Anti virus with Keyboard Optical Scroll Mouse and 43 inch Display as per specifications

1 numbers Delivery: 120 days
#143

24 U Equipment Rack

19 inch Equipment Rack 24U including Patch Panel and Cable Manager accessories etc. as per specifications.

1 numbers Delivery: 120 days
#144

9U Indoor networking rack

9U Indoor networking rack

2 numbers Delivery: 120 days
#145

IP based Intelligent Master Access Controller

IP based Intelligent Master Access Controller with associted software as per specification

2 numbers Delivery: 120 days
#146

Intelligent Slave Access Controller

Intelligent Slave Access Controller as per specification

4 numbers Delivery: 120 days
#147

Smart Card Reader and Exit Push Button

Smart Card Reader and Exit Push Button with 50 No of OEM Programmed unprinted Smart Cards

6 numbers Delivery: 120 days
#148

Electro magnetic Lock for Single Door

Electro magnetic Lock and Holding force with Power supply for Single Door Leaf with Magnetic contact

6 numbers Delivery: 120 days
#149

of 8 Core x 1.0 sq mm multi strand unarmoured copper Cable

Supply of 8 Core x 1.0 sq mm multi strand unarmored Copper Cable between every card reader and the access controller

400 meters Delivery: 120 days
#150

5 KVA Online UPS

5 KVA Online UPS in redundant configuration Qty. 2x5KVA with SMF batteries with 30 minutes of battery backup with each UPS as per specifications.

1 set Delivery: 120 days
#151

PVC Conduit

Supply and laying of 25 mm dia 16 SWG ISI Marked PVC Conduit with all bends Tees and other accessories as per Site requirement

500 meters Delivery: 120 days
#152

06 Core SMF Optic OFC

Supply and laying of 06 Core SMF Optic OFC along with 10 No of SC LC patch cords with Connectors Adaptors Termination etc.

500 meters Delivery: 120 days
#153

40mm dia HDPE pipe

Supply and laying of 40mm dia HDPE pipe PN 6 as per site requirement

500 meters Delivery: 120 days
#154

CAT 6 UTP data cable

Supply and laying of CAT 6 UTP data cable in conduit or pipe on surface with connectors termination etc. required as per specifications.

3 roll Delivery: 120 days
#155

3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable

Supply and laying of 3 core 6 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per site requirement

200 meters Delivery: 120 days
#156

3 core 1.5 sqmm multi strand power cable

Supply and laying of 3 core 1.5 sqmm multi strand PVC insulated PVC sheathed copper conductor power cable in conduit or pipe on surface including all accessories termination etc. as per specifications.

500 meters Delivery: 120 days
#157

Light guide Interconnect Unit

Light guide Interconnect Unit fully populated with modules and adapters as per specifications

2 numbers Delivery: 120 days
#158

Media Converter

Supply of Media Converter complete with mounting accessories connectors etc.

2 numbers Delivery: 120 days
#159

Copper plate Earthing

Copper plate Earthing as per specification with 30 Mtr copper strip per earthing

3 numbers Delivery: 120 days
#160

Installation Testing Commissioning

Installation Testing Commissioning of the complete system alongwith training and documentation as per site requirement

1 numbers Delivery: 120 days
#161

CAMC 1st Year

CAMC for 1st Year at the rate of 4.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#162

CAMC 2nd Year

CAMC for 1st Year at the rate of 5.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days
#163

CAMC 3rd Year

CAMC for 1st Year at the rate of 6.0 percent of SITC cost of concerned Airport

1 numbers Delivery: 365 days

Reverse Auction Schedule

Completed

Start

17-Aug-2025, 5:00 pm

End

18-Aug-2025, 5:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
AALFA ENETWORK PRIVATE LIMITED   Under PMA
-15-07-2025 11:56:55
2
CYBERONIX INDIA PRIVATE LIMITED   Under PMA
-14-07-2025 22:00:19
3
ENERGIK POWER SOLUTIONS PRIVATE LIMITED   Under PMA
-15-07-2025 13:17:13
4
HIND DEFENCE EQUIPMENT PRIVATE LIMITED   Under PMA
-14-07-2025 20:57:03
5
ICONNECTTE INTEGRATED TECHNOLOGIES PRIVATE LIMITED   Under PMA
-11-07-2025 18:44:14
6
INFOSOFT DIGITAL DESIGN AND SERVICES PRIVATE LIMITED   Under PMA
-15-07-2025 13:56:52
7
INNOVIRTUZ TECHNOLOGIES PRIVATE LIMITED   Under PMA
-15-07-2025 12:56:31
8
M/S DEV ENTERPRISES   Under PMA
-15-07-2025 13:41:28
9
MAPLE LEAF INTELLIGENT SOLUTIONS PRIVATE LIMITED   Under PMA
-14-07-2025 23:18:21
10
NITCON LIMITED   Under PMA
-15-07-2025 13:09:55
11
OSIRIS SYSTEMS PRIVATE LIMITED   Under PMA
-15-07-2025 13:38:12
12
POOJA BUILDCON CONSTRUCTION   Under PMA
-15-07-2025 11:29:41
13
SPRINT INTEGRATED SOLUTIONS PRIVATE LIMITED   Under PMA
-15-07-2025 12:08:26
14
TRANSLINE TECHNOLOGIES LIMITED   Under PMA
-15-07-2025 12:41:38
15
VBOTS LLC   Under PMA
-15-07-2025 13:38:37
16
VIHAWK TECH SOLUTIONS PRIVATE LIMITED   Under PMA
-15-07-2025 12:29:49
17
WALSONS SERVICES PRIVATE LIMITED   Under PMA
-15-07-2025 13:36:43
18
Z EYE NETWORK SOLUTIONS PRIVATE LIMITED   Under PMA
-15-07-2025 13:38:58

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1AALFA ENETWORK PRIVATE LIMITED(MII)   Under PMA Winner ₹3,44,93,244Item Categories : 2 Megapixel Outdoor Colour Dome PTZ Camera,2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera
L2SPRINT INTEGRATED SOLUTIONS PRIVATE LIMITED (MII)   Under PMA₹3,50,80,230Item Categories : 2 Megapixel Outdoor Colour Dome PTZ Camera,2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera
L3ENERGIK POWER SOLUTIONS PRIVATE LIMITED (MII)   Under PMA₹3,51,36,684Item Categories : 2 Megapixel Outdoor Colour Dome PTZ Camera,2 Megapixel Varifocal Outdoor Fixed IR Colour Box Camera

🎉 L1 Winner

AALFA ENETWORK PRIVATE LIMITED(MII)   Under PMA

Final Price: ₹3,44,93,244

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What are the eligibility requirements for participation in the tender?

The eligibility requirements include being a registered entity, possessing relevant experience in similar projects, and complying with all specifications outlined in the tender documentation. Additionally, bidders must demonstrate financial capability and technical competence to successfully execute the project.

What specific certificates or documentation are required for submission?

Bidders are required to submit a valid certificate of incorporation, GST registration, and other relevant documents that demonstrate compliance with regulatory requirements. Additionally, experience letters and financial statements may be requested to substantiate qualifications and capabilities.

How is the registration process for this tender structured?

The registration process involves creating an account on the official bidding platform, providing necessary details, and uploading required documents. It is essential to adhere to the specified formats and guidelines to avoid disqualification from the tender evaluation process.

What are the criteria for technical specifications and quality standards?

The technical specifications will include details on video resolution, camera types, and integration compatibility of the systems. Bids will be evaluated on compliance with stipulated quality standards, reliability, and effectiveness of the proposed solutions in enhancing security measures.

What are the provisions for Micro, Small, and Medium Enterprises (MSEs) and startups?

The initiative encourages participation from MSEs and startups by providing additional benefits such as simplified qualification criteria and support in the procurement process. Suppliers should demonstrate alignment with 'Make in India' policies and contribute to fostering local manufacturing and innovation.