Bid Publish Date
23-Jul-2026, 5:52 pm
Bid End Date
03-Aug-2026, 1:00 pm
Location
Progress
Quantity
5
Bid Type
Two Packet Bid
Nhdc Limited, under the Hydro Power department, seeks a Water Purification System with UV or UV+UF (V2) for the site in East Nimar, Madhya Pradesh (450001). Scope includes Supply, Installation, Testing and Commissioning of the specified purification system with related accessories. The tender clarifies an option to adjust quantity by up to 25% during contract execution and requires products with at least a three-year market life. The project emphasizes compliance with central government testing and OEM authorization where applicable. Unique emphasis on UV/UF technology and guaranteed water quality differentiates this bid.
25% quantity variation rights during contract
3 years residual market life requirement
GST compliance and actual reimbursement
OEM authorization required for authorized distributors
Supply includes installation, testing, commissioning and accessories
Mandatory test reports from recognized labs
Delivery terms aligned with buyer ATC
Not specified in excerpt; ensure terms align with ATC requiring upfront or milestone payments as per contract
Delivery period linked to original delivery order; option to extend per quantity variation clause with minimum 30 days
Not specified here; bidders should verify LD terms in ATC and contract
Offeror must supply UV/UV+UF water purification systems with OEM authorization
Minimum 3 years market life remaining on offered model
GST registration valid and recital of GST rate acceptable to buyer
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
16
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
East Nimar
Delivery Pincodes
450119
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sanjeev Yadav | 450119,Indira Sagar Power Station, NHDC Office Complex, Narmada Nagar | East Nimar | Madhya Pradesh | 450119 | 5 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Features and Performance | Type of Water Purification Technology | Generally Conformity to IS 14724 for Ultraviolet (UV)+Ultrafiltration (UF) |
| Features and Performance | Rate of Flow (In LPH) of purified water | upto 200 LPH |
| Features and Performance | Method of Mounting | Freestanding |
| Features and Performance | Input Water Source Connection | Faucet-Mounted |
| Features and Performance | Additional Water Conditioning and Other Features | Sand Filter, Sediment Filter, Pre Carbon Filter, Micron Filter, Reject Water Control Mechanism, Activated Carbon Media, Normal Water Dispensing, Cold Water Dispensing |
| Features and Performance | Maximum Feed Water TDS (ppm) at which the machine LPH and Guaranteed output water quality is ensured | upto 500 |
| Features and Performance | Guaranteed output water quality | As per IS 10500 or better |
| Water Storage | Storage Tank (inclusive in the scope of supply) | Self Contained Water Cooler |
| Water Storage | Type of Water Tank / Location | Self Contained Water Cooler |
| Water Storage | Storage Tank Material | Self Contained Water Cooler |
| Water Storage | Storage Tank Capacity (in Ltr) | Self Contained Water Cooler |
| Water Storage | Self Contained Water Cooler | Self Contained Water Cooler as per IS 1475 (ISI Marked) of cooling capacity - 60 LPH at Rated conditions and Storage Capacity 80 Liters (I,e 60/80 water cooler.) |
| Controller and Display | Type of Controller | Fully Automatic |
| Controller and Display | Controller and Display Features | Auto cut-off |
| Service, Warranty, Installation and Commissioning | Training and Demonstration | The installation and demonstration of the machine at the consignee place shall be carried out as part of installation and commissioning |
| Certification / Test Report | Availability of Test Report From Central Govt/Nabl/Ilac Accredited Lab to Prove Conformity to Specification | Yes |
Discover companies most likely to bid on this tender
GSTIN certificate
PAN card
Cancelled cheque copy
EFT mandate (bank certification)
OEM authorization / Manufacturer authorization
Experience certificates showing relevant project details
Technical compliance certificates for UV/UV+UF system
Test reports from Central Govt/NABL/ILAC accredited lab (where applicable)
Key insights about MADHYA PRADESH tender market
Bidders must submit GSTIN, PAN, cancelled cheque, EFT mandate, and OEM authorization with their bid. Ensure the proposed UV or UV+UF system meets central government test reports (NABL/ILAC) and provides installation, testing and commissioning. The contract allows up to 25% quantity variation and requires 3 years residual market life for the product.
Required documents include GST certificate, PAN card, cancelled cheque, EFT mandate certified by bank, manufacturer authorization, experience certificates, and technical compliance certificates for UV/UF system. OEM authorization is mandatory for authorized distributors, and lab test reports may be requested for conformity.
Bidders must provide UV or UV+UF system with guaranteed output water quality and documented test reports from NABL/ILAC-accredited labs. The specification should include maximum feed water TDS, flow rate in LPH, and storage tank capacity/material, with controller/display features and on-site training.
The buyer reserves the right to increase or decrease bid quantity by up to 25% at contract placement and during the currency at contracted rates. Delivery time extensions follow a calculated formula and minimum 30 days, starting from the last delivery date.
Payment terms are not fully specified in the excerpt; bidders should reference the ATC. Typically, terms may involve milestone payments linked to installation, testing, and commissioning, with potential GST considerations and reimbursement per actual rates.
OEM authorization must include the OEM name, contact details, designation, address, email, and phone number, proving that the bidder is an authorized distributor or service provider for the UV/UF water purification system.
Conformity must be demonstrated via test reports from Central Government labs or NABL/ILAC-accredited labs. Report scope should cover UV/UF system performance, water quality outputs, and tolerance against guaranteed output standards.
The contract requires on-site training and demonstration. The supplier must train client personnel on operation, maintenance, and troubleshooting of the UV/UF system, including controller usage and routine quality checks.
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS