Bid Publish Date
27-Jun-2026, 1:56 pm
Bid End Date
08-Jul-2026, 2:00 pm
Location
Progress
Quantity
9
Category
Needle Bearing
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) invites bids for a package of components including Needle Bearing, Ball Bearing, Hose Assembly, Rep Kit QRV, Rep Kit Air Dryer, and Elect Fuel Pump for delivery in Sri Ganganagar, Rajasthan 335771. The BOQ lists 7 items with unspecified quantities, signaling a multi-line supply contract. A notable feature is the option clause allowing up to 25% quantity variance at contracted rates, with delivery timing calculated from the original delivery period and extended as needed, subject to a minimum of 30 days. The tender emphasizes inspection roles by the buyer or authorized bodies and permits a third-party inspection at cost if required. This procurement targets defense maintenance spares requiring conformance to contract terms and post-dispatch verification. The absence of explicit start/end dates or precise values requires bidders to plan for flexible scheduling within military logistics windows and coordinate with the Army’s inspection and delivery protocols.
Product names: Needle Bearing, Ball Bearing, Hose Assembly, Rep Kit QRV, Rep Kit Air Dryer, Elect Fuel Pump
BOQ: 7 items with unspecified quantities
Delivery terms: option to increase quantity up to 25% at contracted rates
Delivery time: based on last date of original delivery order; minimum 30 days if extended
Inspection: buyer/inspecting officer or empanelled agency; 0% inspection cost if stated; post-dispatch inspection possible
Payment/penalties: standard defense procurement norms; penalties not detailed
Option Clause allows up to 25% quantity variation at contracted rates
Delivery time recalculation based on original and extended periods with minimum 30 days
Pre/Post-dispatch inspection by buyer or authorized agency at bidder's expense if non-conforming
Not explicitly provided; bidders should expect government defense payment norms and post-acceptance settlement
Delivery begins from the last date of original delivery order; extended time formula applies with minimum 30 days
Not detailed; standard LOI/LD provisions may apply under defense procurement terms
Experience in supplying military spare parts or defense maintenance kits
Demonstrated manufacturing/repair capability for bearings and pumps
Compliance with standard defense inspection and documentation requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Needle Bearing , Ball Bearing , Hose Assy , Rep Kit QRV , Rep Kit Air Dryer , Elect Fuel Pump
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Sri Ganganagar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Sri Ganganagar | Sri Ganganagar | - | - | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Needle Bearing
Needle Bearing
Ball Bearing
Ball Bearing
Hose Assy
Hose Assy
Hose Assy
Hose Assy
Rep Kit QRV
Rep Kit QRV
Rep Kit Air Dryer
Rep Kit Air Dryer
Elect Fuel Pump
Elect Fuel Pump
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Needle Bearing | Needle Bearing | 2 | pieces | kishorilal224 | 15 | |
| 2 | Ball Bearing | Ball Bearing | 2 | pieces | kishorilal224 | 15 | |
| 3 | Hose Assy | Hose Assy | 1 | pieces | kishorilal224 | 15 | |
| 4 | Hose Assy | Hose Assy | 1 | pieces | kishorilal224 | 15 | |
| 5 | Rep Kit QRV | Rep Kit QRV | 1 | pieces | kishorilal224 | 15 | |
| 6 | Rep Kit Air Dryer | Rep Kit Air Dryer | 1 | pieces | kishorilal224 | 15 | |
| 7 | Elect Fuel Pump | Elect Fuel Pump | 1 | pieces | kishorilal224 | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar defense spare parts supply
Financial statements (minimum last 2 financial years)
EMD/Security deposit submission proof
Technical bid documents showing compliance with BOQ items
OEM authorization certificates or authorization letters
Any ISO/industry certifications relevant to bearings and pumps (if applicable)
Proof of manufacturing capability and after-sales support
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AMRIT MOTOR STORE Under PMA | - | 04-07-2026 16:48:13 | |
| 2 | G.S. Enterprises Under PMA | - | 07-07-2026 13:08:03 | |
| 3 | M S ENTERPRISES Under PMA | - | 04-07-2026 18:53:26 | |
| 4 | SHREYALIX HIVE Under PMA | - | 08-07-2026 13:51:34 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | G.S. Enterprises(MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : Needle Bearing,Ball Bearing,Hose Assy,Hose Assy,Rep Kit QRV,Rep Kit Air Dryer,Elect Fuel Pump | |
| L2 | M S ENTERPRISES (MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : Needle Bearing,Ball Bearing,Hose Assy,Hose Assy,Rep Kit QRV,Rep Kit Air Dryer,Elect Fuel Pump | |
| L3 | AMRIT MOTOR STORE (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Needle Bearing,Ball Bearing,Hose Assy,Hose Assy,Rep Kit QRV,Rep Kit Air Dryer,Elect Fuel Pump | |
| L4 | SHREYALIX HIVE (MSE)( MSE Social Category:ST ) Under PMA | Item Categories : Needle Bearing,Ball Bearing,Hose Assy,Hose Assy,Rep Kit QRV,Rep Kit Air Dryer,Elect Fuel Pump |
Key insights about RAJASTHAN tender market
Bidders should submit GST, PAN, experience certificates, financial statements, EMD, OEM authorizations, and technical compliance documents. Ensure 25% quantity variation readiness and confirmation of delivery timelines per original order; comply with inspection procedures and pre/post-dispatch checks.
Required documents include GST certificate, PAN, last two years financials, experience certificates for similar supply, EMD proof, OEM authorization, and technical bid detailing compliance with each BOQ item; ensure post-dispatch inspection readiness.
Exact standards are not specified; bidders should provide OEM certifications, product datasheets, and conformity with military acceptance tests; anticipate IS/ISO quality controls and oxygen/pump safety specs as per defense norms.
Delivery starts from the last date of the original delivery order; extended delivery time is calculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, and can extend to the full original period.
Inspection can be by the buyer or an empanelled agency; pre/post-dispatch inspection is possible; inspection cost policy is 0% if costs are borne by the buyer; non-conforming goods may be re-inspected and rejected.
Submit OEM authorization letters or certificates proving manufacturing rights for needles, balls, hoses, rep kits, and pumps; ensure technical bid aligns with OEM guidelines and after-sales service commitments.
Prepare a delivery plan aligned to the original order, with the option quantity clause considered; include inspection-ready documentation, facility access for inspectors, and a clear post-dispatch acceptance plan per Army requirements.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS