Progress
Bokaro Steel Plant, a unit under the Steel Authority of India Limited, invites bids for an Annual Maintenance Contract (AMC) of the TLIL Unit of CRM III as per the ATC and SOW. The project is located in Bokaro, Jharkhand with an estimated value of ₹16,650,818.93. The scope centers on ongoing service and maintenance activities defined in the ATC/SOW, with no BOQ items published. There is emphasis on adherence to the buyer's ATC guidelines and the SOW to ensure compliant, continuous operation of the TLIL unit. The tender emphasizes supplier capability to deliver AMC services in line with regulatory and client-specified standards, with a focus on reliability and uptime of CRM III TLIL systems.
EMD as per ATC to be submitted in accepted mode
Average annual turnover and eligibility governed by Uniform Commercial Eligibility in ATC
Delivery/maintenance services aligned to CRM III TLIL unit operations
Payment terms not specified in current excerpt; verify in ATC/SOW and bid documents.
AMC to cover ongoing maintenance; no milestone dates published in available data.
Penalty provisions not disclosed here; refer to ATC for LD rates and conditions.
Average annual turnover as per ATC Uniform Commercial Eligibility (3-year window)
Experience in similar AMC engagement for industrial equipment or CRM systems
GST registration and financial stability documentation
Quantity
1
Similar Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2)
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
7 Days
EMD Required
No
MII Compliance
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2117
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - ANNUAL MAINTENANCE CONTRACT OF TLIL UNIT OF CRM III AS PER ATC AND SOW
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Bokaro
Delivery Pincodes
827001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Amit Kumar | 827001,CRM3, BSL, SAIL | Bokaro | Jharkhand | 827001 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
Pan card
Experience certificates for similar AMC engagements
Financial statements (last 3 years)
EMD/Security deposit (as per ATC)
Technical bid documents
OEM authorizations or certifications (if applicable)
Any ATC-referenced compliance certificates
Key insights about JHARKHAND tender market
Bidders should review the ATC/SOW, prepare documents including GST, PAN, experience certificates, and financial statements, and submit the technical and financial bids per GeM terms. Ensure compliance with Uniform Commercial Eligibility and provide OEM authorizations if applicable. The estimated value informs bid pricing strategy and profit planning.
Required documents include GST registration certificate, PAN, three-year financial statements, experience certificates for similar AMC work, EMD as per ATC, technical bid documents, and OEM authorizations or certifications when applicable. Ensure all documents are current and digitally certified for submission.
Scope spans ongoing maintenance and service for the TLIL Unit of CRM III as defined in the ATC and SOW. Bidders must align service delivery with the CRM III equipment lifecycle, schedule preventive maintenance, and provide contingency support to minimize downtime.
Payment terms are not disclosed in the public excerpt and must be checked in the ATC. Bid evaluators typically consider milestones, service level adherence, and timely invoicing; ensure your financial proposal aligns with standard AMC practices and site requirements.
The ATC references Uniform Commercial Eligibility with a 3-year turnover window and relevant experience in similar AMC engagements. Ensure your company’s average annual turnover meets or exceeds the stated threshold and provide verifiable references to prior CRM or industrial maintenance contracts.
Standards are specified in the ATC; bidders must present compliance with applicable safety and operational norms and OEM-related certifications. Verify if IS/ISO or OEM-specific standards are mandated in the ATC/SOW before submission.
The ATC and SOW are viewable in the GeM tender documents linked by the Buyer. Access the atc/sow file to confirm scope, EMD, eligibility, and all compliance requirements before final submission.
The estimated value is ₹16,650,818.93 for the AMC of the TLIL Unit CRM III, guiding pricing strategy and resource allocation. Include breakdowns for labor, parts, and service levels in your financial bid.