Copper Tube,Copper Tube 3 8,Black Hose 5 8,Black hose,5Sq mm 4 Core Wire,Air Condition Stand Heavy
Ai Airport Services Limited
KANCHIPURAM, TAMIL NADU
Progress
RAQuantity
440
Bid Type
Two Packet Bid
A tender has been published for Goa Shipyard Limited COPPER PIPE half inch AC SPARE, TUBULAR FOAM INSULATION 5 by 8 inch, TUBULAR FOAM INSULATION half inch, FREE ON GAS R22, ROTORY COMPRESSOR LG 2T, RUNNING CAPACITOR 50 plus 2 MFD, RUNNING CAPACITOR 4 MFD, RUNNING CAPACITOR 6 MFD, RUNNING CAPACITOR 2 point 5 MFD in SOUTH GOA, GOA. Quantity: 440 by. Submission Deadline: 17-06-2025 15: 00: 00. Check eligibility and apply.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Ai Airport Services Limited
KANCHIPURAM, TAMIL NADU
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Indian Army
JAISALMER, RAJASTHAN
Indian Army
Garden Reach Ship Builders And Engineers Limited (grse)
KOLKATA, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | COPPER PIPE half inch AC SPARE | COPPER PIPE half inch AC SPARE | 150 | mtr | dpo.gsl | 45 |
| 2 | TUBULAR FOAM INSULATION 5 by 8 inch | TUBULAR FOAM INSULATION 5 by 8 inch | 50 | nos | dpo.gsl | 45 |
| 3 | TUBULAR FOAM INSULATION half inch | TUBULAR FOAM INSULATION half inch | 50 | nos | dpo.gsl | 45 |
| 4 | FREE ON GAS R22 | FREE ON GAS R22 | 60 | kgs | dpo.gsl | 45 |
| 5 | ROTORY COMPRESSOR LG 2T | ROTORY COMPRESSOR LG 2T | 10 | nos | dpo.gsl | 45 |
| 6 | RUNNING CAPACITOR 50 plus 2 MFD | RUNNING CAPACITOR 50 plus 2 MFD | 50 | nos | dpo.gsl | 45 |
| 7 | RUNNING CAPACITOR 4 MFD | RUNNING CAPACITOR 4 MFD | 25 | nos | dpo.gsl | 45 |
| 8 | RUNNING CAPACITOR 6 MFD | RUNNING CAPACITOR 6 MFD | 25 | nos | dpo.gsl | 45 |
| 9 | RUNNING CAPACITOR 2 point 5 MFD | RUNNING CAPACITOR 2 point 5 MFD | 20 | nos | dpo.gsl | 45 |
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
26-Jul-2025, 11:00 am
End
28-Jul-2025, 11:00 am
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ARENA SOLAR ENERGY Under PMA | - | 16-06-2025 22:52:23 | Qualified |
| 2 | PARTH ENERGY SYSTEMS PRIVATE LIMITED Under PMA | - | 17-06-2025 14:56:30 | Qualified |
| 3 | RARENA RENEWABLES PRIVATE LIMITED Under PMA | - | 16-06-2025 23:10:11 | Qualified |
| 4 | V S Engineering Under PMA | - | 14-06-2025 21:08:51 | Qualified |
| 5 | VG Exports Under PMA | - | 16-06-2025 22:44:12 | Qualified |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | ARENA SOLAR ENERGY(MSE) Under PMA Winner | ₹2,08,750 | Item Categories : COPPER PIPE half inch AC SPARE,TUBULAR FOAM INSULATION 5 by 8 inch,TUBULAR FOAM INSULATION half inc |
| L2 | VG Exports (MSE) Under PMA | ₹2,09,216 | Item Categories : COPPER PIPE half inch AC SPARE,TUBULAR FOAM INSULATION 5 by 8 inch,TUBULAR FOAM INSULATION half inc |
| L3 | V S Engineering Under PMA | ₹2,11,695 | Item Categories : COPPER PIPE half inch AC SPARE,TUBULAR FOAM INSULATION 5 by 8 inch,TUBULAR FOAM INSULATION half inc |
| L4 | RARENA RENEWABLES PRIVATE LIMITED (MSE) Under PMA | ₹3,26,716 | Item Categories : COPPER PIPE half inch AC SPARE,TUBULAR FOAM INSULATION 5 by 8 inch,TUBULAR FOAM INSULATION half inc |
🎉 L1 Winner
ARENA SOLAR ENERGY(MSE) Under PMA
Final Price: ₹2,08,750
Key insights about GOA tender market
The eligibility requirements include being a registered entity with a valid GST registration. Additionally, bidders should have experience in supplying similar air conditioning components and must submit documentation proving their capability to deliver high-quality products.
Bidders must adhere to stringent technical specifications ensuring that the copper pipes, insulation materials, compressors, and capacitors meet industry standards. Proof of certification for compliance with these specifications is essential in the submission.
Participating bidders need to showcase their financial stability through bank statements from the past three years and include a bid price in line with the guidelines specified in the tender. This will help demonstrate their capability to fulfill the contract obligations.
Document submission must be done according to the specified guidelines in the tender document. This typically includes completed tender forms and all required certificates, notably in accepted formats like PDF or Word documents, ensuring ease of review by the evaluation committee.
Yes, the tender includes specific provisions to support Micro, Small, and Medium Enterprises (MSEs) as well as startups. These entities will benefit from reduced bureaucracy during the evaluation process, making it easier for them to engage with government contracts and contribute to local sourcing initiatives.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS