TenderDekho Logo
Closed GEM

NPCIL UPS Supply 240V AC 5KVA Tender Chittorgarh Rajasthan 2026 EMC/Seismic Testing Standards

Bid Publish Date

18-Sep-2026, 6:05 pm

Bid End Date

16-Oct-2026, 9:00 am

EMD

₹2,94,528

Generate Docs

Progress

Issue18-Sep-2026, 6:05 pm
Corrigendum09-Oct-2026
AwardPending

Tender Overview

Organization: Nuclear Power Corporation Of India Limited (NPCIL) under the Department Of Atomic Energy. Product/Service: Supply of 240V AC, single-phase, 5KVA UPS; Installation & Commissioning of new UPS; removal/shifting of existing UPS; EMC qualification or type testing charges as applicable; optional seismic test charges; IV/V Independent Verification & Validation; EST and reliability analysis charges; training, and supply of mandatory spares listed in the specification clause 6.12. Location: Chittorgarh, Rajasthan 312001. Quantity/Value: 11 items in BoQ with an EMD of ₹294,528. Tender scope includes multiple ancillary charges and optional tests. Uniqueness: Comprehensive scope covering testing, installation, seismic and IV/V verification, and OEM declarations under Make in India terms. The option clause enables quantity variation up to 25%, with delivery periods adjusted per the formula and minimum 30 days.

Technical Specifications & Requirements

  • Item 1-11: UPS supply and related services are defined, but explicit technical specs are not disclosed in the provided data. The bidder should be prepared to supply a 240V AC, single-phase, 5KVA UPS and execute installation/commissioning, plus potential testing services including EMC/type testing, seismic testing, IV/V verification, EST and reliability analysis as requested.
  • EMD: ₹294,528.
  • Delivery/Testing Scope: Options for on-site IV/V verification and factory testing expenses; Make in India declarations required via Annexure-M guidance; OEM declaration needed for compliance with Make in India.
  • Mandatory Training & Spares: Training charges and supply of mandatory spares (as per clause 6.12) may be invoked.
  • BoQ: 11 items listed, but specific quantities/values are not provided in the extract; bidders should anticipate bundled components and services.

Terms, Conditions & Eligibility

  • EMD: ₹294,528 (as per tender terms).
  • Option Clause: Quantity may be increased/decreased by up to 25% at contract, with extended delivery periods following the same proportional logic and a minimum of 30 days.
  • Make in India: Bidders must submit OEM declarations to demonstrate Make in India compliance; reference Annexure-M guidance and Annexure-D under ATC.
  • Documents: Include GST declaration form, MSE benefits declaration with Udyam certificate if applicable, and required bid declarations on company letterhead.
  • ATC & Banning Clause: Compliance with Annexure-II for supplier ban policies.
  • Delivery & Payment: Terms linked to delivery schedules and contract execution; specifics to be aligned with GeM and NPCIL ATC.
  • Quality/Testing: EMC/type testing and seismic test charges may be applicable; IV/V verification at site or factory.

Key Specifications

    • Product/service: 240V AC, single-phase, 5KVA UPS supply and associated installation/commissioning
    • Optional services: EMC/type testing charges, seismic test charges, IV/V verification at factory/site, EST/Reliability analyses
    • Warranty/AMC: Not specified in extract; bidder should verify in full bid documents
    • Testing: Type testing or EMC qualification charges; IV/V VERIFICATION & VALIDATION at factory/site
    • Documentation: OEM Make in India declarations; MSE Make in India benefits; Annexure forms
    • Delivery: Option to adjust delivery based on quantity variation up to 25% with minimum 30 days extension

Terms & Conditions

  • 25% quantity variation allowed; delivery period adjusts proportionally with minimum 30 days

  • EMD of ₹294,528 required; payment terms to be confirmed in actual bid

  • OEM Make in India declarations required; Annexure-M guidance and Annexure-D submission

Important Clauses

Payment Terms

Payment terms to be defined in contract; EMD required upfront; options may include staged payments per delivery milestones

Delivery Schedule

Delivery periods subject to option clause; extended duration calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Penalty provisions not detailed here; to be specified in full tender documents

Bidder Eligibility

  • Experience in supplying/inst al ling UPS systems (240V AC, 5KVA) and related testing

  • Valid GST registration; compliance with Make in India declarations

  • Financial capability to support EMD and project-related expenditures

Advertisement

Authority & Contact

Organization

Nuclear Power Corporation Of India Limited

Office Name

Rajasthan

Ministry

PMO

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

17

Category

Supply of 240V AC, Single Phase, 5KVA UPS as per attached Technical specifications- Item Number-1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of 240V AC, Single Phase, 5KVA UPS as per attached Technical specifications- Item Number-1 , Installation and Commissioning of the new UPS including removal and shifting of the existing UPS- Item Number-2 , Type testing or EMC qualification charges. If Required- Item Number-3 , Seismic test charges. If Required- Item Number-4 , Charge for IV and V Independent Verification and Validation- at factory. If Required- Item Number-5 , EST test Charges. If Required- Item Number-6 , Reliability Analysis Charges. If Required- Item Number-7 , Supply of UPS used for Type and seismic testing which completed all testing satisfactorily at factory. If Required- Item Number-8 , Training charges- Item Number-9 , Supply of Mandatory spares i.e List of mandatory spares specified in specification clause 6.12- Item Number-10 , Charge for IV and V Independent Verification and Validation at site- Item Number-11

Advisory Bank

AXIS BANK LTD

ePBG Percentage

5%

ePBG Duration (Months)

38

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Chittorgarh

Delivery Pincodes

323303

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Gyan Mal Khatik323303,Contracts & Material Management, NPCIL, Rawatbhata Rajasthan Site, Anushakti Via-Kota (Rajasthan) Phone No. 01475-242002, 242048 Which is about 60 Kms. away from Kota.ChittorgarhRajasthan3233034730-

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9834344.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

Supply of 240V AC, Single Phase, 5KVA UPS as per attached Technical specifications- Item Number-1

Supply of 240V AC, Single Phase, 5KVA UPS as per attached Technical specifications

4 number Delivery: 730 days
#2

Installation and Commissioning of the new UPS including removal and shifting of the existing UPS- Item Number-2

Installation and Commissioning of the new UPS including removal and shifting of the existing UPS

4 number Delivery: 730 days
#3

Type testing or EMC qualification charges. If Required- Item Number-3

Type testing or EMC qualification charges. If Required

1 set Delivery: 730 days
#4

Seismic test charges. If Required- Item Number-4

Seismic test charges. If Required

1 set Delivery: 730 days
#5

Charge for IV and V Independent Verification and Validation- at factory. If Required- Item Number-5

Charge for IV and V Independent Verification and Validation- at factory. If Required

1 set Delivery: 730 days
#6

EST test Charges. If Required- Item Number-6

EST test Charges. If Required

1 set Delivery: 730 days
#7

Reliability Analysis Charges. If Required- Item Number-7

Reliability Analysis Charges. If Required

1 set Delivery: 730 days
#8

Supply of UPS used for Type and seismic testing which completed all testing satisfactorily at factory. If Required- Item Number-8

Supply of UPS used for Type and seismic testing which completed all testing satisfactorily at factory. If Required

1 number Delivery: 730 days
#9

Training charges- Item Number-9

Training charges.

1 set Delivery: 730 days
#10

Supply of Mandatory spares i.e List of mandatory spares specified in specification clause 6.12- Item Number-10

Supply of Mandatory spares i.e List of mandatory spares specified in specification clause 6.12

1 set Delivery: 730 days
#11

Charge for IV and V Independent Verification and Validation at site- Item Number-11

Charge for IV and V Independent Verification and Validation at site.

1 set Delivery: 730 days
Advertisement

Categories 12

Corrigendum Updates

1 Update
#1

Update

09-Oct-2026

Extended Deadline

16-Oct-2026, 3:30 am

Opening Date

17-Oct-2026, 3:30 am

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for UPS supply/installation

4

Financial statements (audited, if available)

5

EMD payment evidence (DD/online transfer receipt)

6

Technical bid documents demonstrating UPS capability

7

OEM authorization / Make in India declaration (Annexure-M guidance)

8

Udyam Registration Certificate (for MSE benefits, if applicable)

9

Mandate Form and GST Declaration Annexure F

10

Any other documents requested under ATC Annexures

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for the NPCIL UPS tender in Chittorgarh Rajasthan 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD ₹294,528 along with Make in India OEM declarations. Include OEM authorization and Udyam certificate if claiming MSE benefits. Ensure 240V AC, 5KVA UPS capability and installation/commissioning experience. Follow ATC annexures for Make in India compliance.

What documents are required for NPCIL UPS procurement in Rajasthan?

Required documents include GST registration, PAN, experience certificates for UPS supply/installation, audited financial statements, EMD proof, technical bid, OEM authorization, Make in India declarations, Udyam certificate if applicable, and GST Mandate Form Annexure F. Ensure compliance with Annexure-D and Annexure-M guidance.

What are the essential UPS technical requirements for this bid in Chittorgarh?

Essentials include a 240V AC, single-phase, 5KVA UPS with installation/commissioning service. Expect EMC/type testing charges, possible seismic testing, IV/V verification, EST and reliability analysis. Specific performance metrics are described in the full tender; bidders should be ready to demonstrate UPS compatibility with 5KVA load at 240V.

When is the EMD amount required for NPCIL UPS tender in Rajasthan?

EMD of ₹294,528 must accompany the bid. Payment method details (DD/online) and submission format are specified in the tender's terms and Annexure-I; ensure compliance to avoid disqualification.

What is the delivery extension rule for quantity changes in this NPCIL tender?

Delivery period extends by (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days. The purchaser may extend up to the original delivery period during option execution.

What Make in India declarations are required for the UPS bid in Rajasthan?

Bidder must provide OEM Make in India declaration per Annexure-M guidance, and a declaration fulfilling Make in India Order. Declarations on bidder’s letterhead; there is no single prescribed format beyond Annexure guidance.

What testing charges may be applicable for EMC and seismic assessments?

The bid may include EMC/type testing charges and seismic test charges as required. Also potential charges for IV/V verification, EST testing, and reliability analysis if invoked by NPCIL, either at factory or on-site.

What is required for MSE benefits in the NPCIL UPS tender?

If claiming MSE benefits, submit an Udyam Registration Certificate along with the Make in India declarations. An Annexure-3 is referenced; ensure the declaration aligns with the ATC requirements for MSE eligibility.

Advertisement