TenderDekho Logo
GEM

Bids are Invited For AIR PRESSURE PIPE,ASSY PIPE,COMBI SWITCH,FIELD COIL,ARMATURE ASSY,COMB SWITCH,CLUTCH MASTER CYL,SLA in HISAR, HARYANA

Bid Publish Date

22-Aug-2025, 4:24 pm

Bid End Date

08-Sep-2025, 5:00 pm

Generate Docs

Progress

Issue22-Aug-2025, 4:24 pm
Corrigendum01-Sep-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

51

Category

AIR PRESSURE PIPE

Bid Type

Two Packet Bid

Categories 29

Indian Army invites bids for AIR PRESSURE PIPE, ASSY PIPE, COMBI SWITCH, FIELD COIL, ARMATURE ASSY, COMB SWITCH, CLUTCH MASTER CYL, SLAVE CYL CLUTCH, DOOR LOCK ASSY, CLUTCH REL BRG, DUAL BRAKE VALVE, SPIDER BRG, BRG BALL, CYL HEAD GASKET, FUEL WATER SEPERTOR, CABLE ASSY CONTROL, FUSE 150A, BLADE ASSY WIPER, DE AERATION TANK, HOSE WATER TO FILL PIPE, SPEED SENSOR, VALVE ASSY DUTY FOR PURGE, SOLENOID SWITCH, MAP SENSOR, CIRCUIT BREAKER, WATER PUMP, ROTARY SWITCH, PUMP ASSY WATER in HISAR, HARYANA. Quantity: 51. Submission Deadline: 08-09-2025 17: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

AIR PRESSURE PIPE , ASSY PIPE , COMBI SWITCH , FIELD COIL , ARMATURE ASSY , COMB SWITCH , CLUTCH MASTER CYL , SLAVE CYL CLUTCH , DOOR LOCK ASSY , CLUTCH REL BRG , DUAL BRAKE VALVE , SPIDER BRG , BRG BALL , CYL HEAD GASKET , FUEL WATER SEPERTOR , CABLE ASSY CONTROL , FUSE 150A , BLADE ASSY WIPER , DE AERATION TANK , HOSE WATER TO FILL PIPE , SPEED SENSOR , VALVE ASSY DUTY FOR PURGE , SOLENOID SWITCH , MAP SENSOR , CIRCUIT BREAKER , WATER PUMP , ROTARY SWITCH , PUMP ASSY WATER

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8256005.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 28 Items Sign in for GEM prices

#1

AIR PRESSURE PIPE

FOR TMB

1 pieces Delivery: 15 days
#2

ASSY PIPE

FOR TATA

1 pieces Delivery: 15 days
#3

COMBI SWITCH

FOR TMB

2 pieces Delivery: 15 days
#4

FIELD COIL

FOR TATA

2 pieces Delivery: 15 days
#5

ARMATURE ASSY

FOR TATA

1 pieces Delivery: 15 days
#6

COMB SWITCH

FOR STLN

1 pieces Delivery: 15 days
#7

CLUTCH MASTER CYL

FOR STLN

2 pieces Delivery: 15 days
#8

SLAVE CYL CLUTCH

FOR STLN

2 pieces Delivery: 15 days
#9

DOOR LOCK ASSY

FOR HMV

2 pieces Delivery: 15 days
#10

CLUTCH REL BRG

FOR STLN

2 pieces Delivery: 15 days
#11

DUAL BRAKE VALVE

FOR HMV

2 pieces Delivery: 15 days
#12

SPIDER BRG

FOR STLN

1 pieces Delivery: 15 days
#13

BRG BALL

FOR MG

2 pieces Delivery: 15 days
#14

CYL HEAD GASKET

FOR HMV

1 pieces Delivery: 15 days
#15

FUEL WATER SEPERTOR

FOR TATA

1 pieces Delivery: 15 days
#16

CABLE ASSY CONTROL

FOT T815

2 pieces Delivery: 15 days
#17

FUSE 150A

FOR SAFARI

2 pieces Delivery: 15 days
#18

BLADE ASSY WIPER

FOR MG

2 pieces Delivery: 15 days
#19

DE AERATION TANK

FOR HMV

3 pieces Delivery: 15 days
#20

HOSE WATER TO FILL PIPE

FOR HMV

2 pieces Delivery: 15 days
#21

SPEED SENSOR

FOR STLN

2 pieces Delivery: 15 days
#22

VALVE ASSY DUTY FOR PURGE

FOR MG

2 pieces Delivery: 15 days
#23

SOLENOID SWITCH

FOR TMB

2 pieces Delivery: 15 days
#24

MAP SENSOR

FOR MG

3 pieces Delivery: 15 days
#25

CIRCUIT BREAKER

FOR T815

2 pieces Delivery: 15 days
#26

WATER PUMP

FOR TATA

2 pieces Delivery: 15 days
#27

ROTARY SWITCH

FOR STLN

2 pieces Delivery: 15 days
#28

PUMP ASSY WATER

FOR MG

2 pieces Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

01-Sep-2025

Extended Deadline

08-Sep-2025, 5:00 pm

Opening Date

08-Sep-2025, 5:30 pm