TenderDekho Logo
Closed GEM

Indian Army Procurement: ASSY SPRING BRAKE ACTUATOR, PRIMING PUMP HAND, BRUSH ELECTRICAL CONTACT SET & More 2026

Bid Publish Date

14-Sep-2026, 10:01 am

Bid End Date

08-Oct-2026, 11:00 am

Location

Generate Docs

Progress

Issue14-Sep-2026, 10:01 am
Corrigendum21-Sep-2026
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement across 15 distinct automotive and mechanical components including ASSY SPRING BRAKE ACTUATOR, PRIMING PUMP HAND, BRUSH ELECTRICAL CONTACT SET, DIFFERENTIAL SPIDER BRG, DIATHRAM, BRAKE SHOE LINER, CE PLATE WITH BRUSHES, PUSH SWITCH FOR SUMP HEATER AND GLOW PLUG, OIL SEAL, HEX M14 X 2 bolts, RUN DOOR GLASS, TAIL LAMP RH/LH, CLUTCH FACING KIT COMPRISES, and FILTER CUM FUEL WATER SEPARATOR. No explicit quantity or value is disclosed; the BOQ lists 15 items with N/A quantities. The buyer mandates standard bid documentation and reserves quantity variation up to 25% during contract execution. Key differentiator is the breadth of components spanning braking, lighting, sealing, and fuel system elements for military applications. Bidders should prepare robust compliance packets to address varied part categories and potential scale changes.

Technical Specifications & Requirements

  • Product families: ASSY SPRING BRAKE ACTUATOR, PRIMING PUMP HAND, BRUSH ELECTRICAL CONTACT SET, DIFFERENTIAL SPIDER BRG, DIATHRAM, BRAKE SHOE LINER, CE PLATE WITH BRUSHES, PUSH SWITCH FOR SUMP HEATER AND GLOW PLUG, OIL SEAL, HEX BOLT M14 X 2, RUN DOOR GLASS, TAIL LAMP RH, TAIL LAMP LH, CLUTCH FACING KIT, FILTER CUM FUEL WATER SEPARATOR
  • No explicit technical specs provided; bidders should anticipate military-grade resilience and compatibility with standard automotive and mechanical assemblies
  • Documentation requirements include PAN, GSTIN, canceled cheque, EFT mandate; ensure vendor code readiness
  • Compliance expectations emphasize certificate uploads (ATC/Corrigendum adherence) and financial standing checks
  • Terms allow quantity variation up to 25% during and after contract; delivery windows anchored to original delivery period with adjustments
  • Emphasis on bid submission completeness to avoid rejection and ensure eligibility for vendor code creation

Terms, Conditions & Eligibility

  • EMD/financial requirements: not specified in the data; bidders must satisfy standard bid security norms
  • Delivery terms: option clause allows up to 25% quantity variation; delivery period begins from last date of original delivery order
  • Documentation: submit PAN, GSTIN, canceled cheque, EFT mandate; ensure all certificates listed in bid document are uploaded
  • Financial standing: bidder must not be under liquidation or bankruptcy; provide an undertaking to this effect
  • Compliance: uploads of all required certificates or bid documents per ATC/C corrigendum are mandatory
  • Warranty/penalties: no explicit warranty terms provided; non-availability implies adherence to standard government procurement penalties in the contract

Key Specifications

  • Product/service: ASSY SPRING BRAKE ACTUATOR, PRIMING PUMP HAND, BRUSH ELECTRICAL CONTACT SET, DIFFERENTIAL SPIDER BRG, DIATHRAM, BRAKE SHOE LINER, CE PLATE WITH BRUSHES, PUSH SWITCH FOR SUMP HEATER AND GLOW PLUG, OIL SEAL, BOLT HEX M14 X 2, RUN DOOR GLASS, TAIL LAMP RH, TAIL LAMP LH, CLUTCH FACING KIT, FILTER CUM FUEL WATER SEPARATOR

  • BOQ indicates 15 items with N/A quantities; no explicit values provided

  • Delivery flexibility: up to 25% quantity variation during contract; minimum delivery extension rules apply

  • Documentation requirements emphasize PAN, GSTIN, cancel cheque, EFT mandate, and vendor code creation

Terms & Conditions

  • Option clause allows 25% quantity variation during/after contract

  • Delivery period linked to last date of original order; extensions follow calculated method

  • Submit PAN, GSTIN, cancelled cheque, EFT mandate; undertake non-liquidation

Important Clauses

Payment Terms

Not specified in data; standard government terms apply per contract

Delivery Schedule

Delivery period commences from last date of original delivery order; option for extended delivery with recalculated time

Penalties/Liquidated Damages

Not explicitly provided; ensure standard LD provisions in final contract

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Provision of PAN, GSTIN, cancelled cheque, EFT mandate

  • Upload of all required bid/ATC documents and certificates

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

53

Category

ASSY SPRING BRAKE ACTUATOR

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

ASSY SPRING BRAKE ACTUATOR , PRIMING PUMP HAND , BRUSH ELECTRICAL CONTACT SET , DIFFERENTIAL SPIDER BRG , DIATHRAM , BRAKE SHOE LINER , CE PLATE WITH BRUSHES , PUSH SWITCH FOR SUMP HEATER AND GLOW PLUG , OIL SEAL , BOLT HEX M14 X 2 , RUN DOOR GLASS , TAIL LAMP RH , TAIL LAMP LH , CLUTCH FACING KIT CONSISTING , FILTER CUM FUEL WATER SEPRATOR

Delivery Details

Max Delivery Days

21

Delivery Locations

1

Delivery Cities

Nagaon

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NagaonNagaon--321-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9889073.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

ASSY SPRING BRAKE ACTUATOR

TATA 2 5 TON

3 nos Delivery: 21 days
#2

PRIMING PUMP HAND

TATA 2 5 TON

2 nos Delivery: 21 days
#3

BRUSH ELECTRICAL CONTACT SET

TATA 2 5 TON

3 nos Delivery: 21 days
#4

DIFFERENTIAL SPIDER BRG

TATA 2 5 TON

3 nos Delivery: 21 days
#5

DIATHRAM

5 TON STLN

2 nos Delivery: 21 days
#6

BRAKE SHOE LINER

6 TON STLN

4 nos Delivery: 21 days
#7

CE PLATE WITH BRUSHES

7 TON STLN

2 nos Delivery: 21 days
#8

PUSH SWITCH FOR SUMP HEATER AND GLOW PLUG

8 TON STLN

2 nos Delivery: 21 days
#9

OIL SEAL

9 TON STLN

2 nos Delivery: 21 days
#10

BOLT HEX M14 X 2

10 TON STLN

20 nos Delivery: 21 days
#11

RUN DOOR GLASS

11 TON STLN

2 nos Delivery: 21 days
#12

TAIL LAMP RH

12 TON STLN

2 nos Delivery: 21 days
#13

TAIL LAMP LH

13 TON STLN

2 nos Delivery: 22 days
#14

CLUTCH FACING KIT CONSISTING

14 TON STLN

2 nos Delivery: 23 days
#15

FILTER CUM FUEL WATER SEPRATOR

15 TON STLN

2 nos Delivery: 24 days
Advertisement

Categories 20

Corrigendum Updates

1 Update
#1

Update

21-Sep-2026

Extended Deadline

08-Oct-2026, 5:30 am

Opening Date

09-Oct-2026, 5:30 am

Required Documents

1

Complete bid submission documents as per Terms and Conditions

2

Copy of PAN Card

3

Copy of GSTIN

4

Copy of Cancelled Cheque

5

Copy of EFT Mandate duly certified by Bank

6

Bidder undertaking on non-liquidation/financial distress

7

All certificates/documents sought in Bid document, ATC and Corrigendum

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for Indian Army automotive components tender 2026?

Bidders should prepare a complete bid package including PAN, GSTIN, cancelled cheque, EFT mandate, and all certificates listed in ATC/Corrigendum. Ensure no liquidation or bankruptcy status, and comply with the option clause allowing up to 25% quantity variation. Delivery terms align with the last date of the original order.

What documents are required for Indian Army procurement 2026 bid?

Submit PAN, GSTIN, cancelled cheque, EFT mandate validated by the bank, and the undertaking on non-liquidation. Also upload all bid documents, ATC and any corrigenda. Ensure vendor code creation documents are ready and certificates are current to avoid rejection.

What are the technical specifications for the brake actuator and related items?

No explicit technical specs are provided in the tender data. Prepare for MIL-spec grade components; align with standard automotive and military reliability expectations. Confirm compatibility with DIATHRAM, CLUTCH FACING, and FUEL WATER SEPARATOR through supplier literature and OEM confirmations.

When is the delivery period for the Army parts contract 2026?

Delivery period starts from the last date of the original delivery order. If the option clause is exercised, time extends per the formula ((Increased quantity ÷ Original quantity) × Original delivery period) with a minimum of 30 days, and may be extended up to the original delivery period.

What is the EMD amount for this Army procurement 2026?

The tender data does not disclose an explicit EMD amount. bidders should prepare the standard bid security as per the central government guidelines and the tender document’s EMD clause, ensuring funds are ready in the enforcing schedule.

What documents confirm bidder eligibility for Indian Army supply contracts?

Eligibility requires non-liquidation status, PAN, GSTIN, cancelled cheque, EFT mandate, and all bid certificates per ATC. Suppliers must upload the undertaking and ensure compliance with Corrigendum references to avoid disqualification.

What are the mandatory certificates to upload with the Army bid?

Upload certificates listed in the Bid Document, ATC, and Corrigendum, including PAN, GSTIN, and EFT mandate. Ensure all certificates reflect current validity and are notarized where required; missing certificates lead to bid rejection.

How to handle quantity variation in this Army 2026 procurement?

The purchaser may increase or decrease quantity by up to 25% at contract; during currency, additional quantity may be ordered at contracted rates. Delivery timelines adjust from the last delivery order date, with the minimum 30-day extension rule.

Advertisement