Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow. Product/Service: Turbo Generator (TG) Seal Oil Cooling System for a 200 MW BHEL Make TG Set. Location: Sonbhadra, Uttar Pradesh, 231205. EMD: ₹50,000. The tender notes an option clause allowing quantity variation up to 25% during and after contract award, with delivery timelines linked to the original delivery period and extended periods, minimum 30 days, and potential extension to original delivery period. This procurement centers on ensuring compatibility with BHEL-made units and seal oil cooling functionality for high-capacity TG sets.
Option Clause allows ±25% quantity variation at contracted rates
Delivery period calculated from original delivery date with extended period rules
EMD amount fixed at ₹50,000; ensure submission with bid
Not specified in available data; verify in ATC.
Delivery timelines depend on original and extended periods; minimum 30 days for any extension.
No LD details provided; confirm in official ATC.
Must have capability to supply BHEL-make TG components
Provide EMD of ₹50,000 with bid submission
Compliance with option-clauses on quantity and delivery timing
OEM authorization or proof of capability for seal oil cooling systems
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Turbo Generator (TG) Seal Oil Cooling System Capacity: 200 MW BHEL Make TG Set
Advisory Bank
YES Bank Limited
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Sonbhadra
Delivery Pincodes
231219
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shatrughan Singh | 231219,Obra Thermal Power Plant | Sonbhadra | Uttar Pradesh | 231219 | 2 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
EMD submission proof (₹50,000)
Technical bid documents (OEM capability, installation readiness)
Authorization from OEM (BHEL) if required
Financial statements or turnover proof (if requested in ATC)
Experience certificates (if requested in ATC)
Key insights about UTTAR PRADESH tender market
Bidders should submit the EMD of ₹50,000, GST and PAN documentation, OEM authorization if required, and technical bid detailing compatibility with BHEL 200 MW TG sets. Confirm delivery schedules per option clause and attach any installation capabilities to support integration with the seal oil cooling system.
Required documents typically include GST certificate, PAN card, EMD submission proof of ₹50,000, technical bid with OEM capabilities, and any OEM authorization. Some tenders also request financial statements and experience certificates; verify in the official ATC for exact list.
Delivery terms permit a ±25% quantity variation at contracted rates. The extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; original delivery dates apply unless extended.
The provided data does not specify standards; bidders should verify in the ATC for required certifications (potential IS/ISO compliance and OEM-specific standards) and ensure the product is compatible with BHEL 200 MW TG sets.
EMD of ₹50,000 is required at bid submission. Ensure payment is confirmed through the prescribed method in the ATC and attach the payment proof with the technical bid.
Scope focuses on supply and integration of a seal oil cooling system for a 200 MW BHEL-made TG set. The BOQ shows 0 items, indicating a single-package or compatibility-focused requirement; confirm exact components and installation support in the ATC.
Delivery extensions follow the option clause: time increases as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days; extensions may span to the original period during currency of contract.
Submit OEM authorization or evidence of capability to supply compatible seal oil cooling components for BHEL 200 MW TG sets; include installation and commissioning capabilities and any prior project references.