TenderDekho Logo
Closed GEM

Indian Army Bulb Lamp and Related Automotive Components Procurement Kupwara Jammu & Kashmir 24V ISI/AAA-TRTL Standards 2026

Bid Publish Date

02-Oct-2026, 6:11 pm

Bid End Date

12-Oct-2026, 7:00 pm

Progress

Issue02-Oct-2026, 6:11 pm
AwardPending

Tender Overview

The procurement is for the Indian Army, Department Of Military Affairs, located in KUPWARA, JAMMU & KASHMIR - 193221. It encompasses 14 items listed in the BOQ under automotive electrical and accessory categories, including bulb fog lamp, W lamp bulb, warning lamp bulb, hood light assy, front direction indicator RH 24V, ignition switch, reverse switch, stop light switch, relay head lamp 24V, revolving light assy, oil seals, wheel bolts, and related components. The contract contemplates a flexible quantity framework (up to 25% increase/decrease of bid/contract quantity) and a preliminary advance-sample approval process. The sample clause requires 2 samples within 5 days of award and potential modifications before bulk supply. Unique aspects include post-award sample verification, and a framework to extend delivery time proportionally with added quantities, subject to minimum 30 days. The absence of explicit financials or start/end dates means bidders should prepare for an open-ended supply scope and rapid qualification.

Technical Specifications & Requirements

  • Product/service names: bulb fog lamp, W lamp bulb, warning lamp bulb, ring oil seal inner, oil seal, S D wheel bolt, front direction indicator RH 24V, CA ignition switch, reverse switch, stop light switch, relay head lamp 24V, revolving light assembly, hood light assembly.
  • Delivery/testing framework: advance sample submission within 5 days of award; modify per buyer feedback; bulk supply only after approved samples.
  • Clause-driven scope: option clause allows up to 25% quantity fluctuation during both initial and extended delivery periods with a defined calculation to derive extended days.
  • Conditions: if samples are non-conforming, buyer may require fresh samples or terminate; supplier bears pre-approval sample costs unless approved.
  • BOQ status: 14 items total; explicit item quantities and units are not provided in the data.
  • Standards/quality: references to sample-based conformity, but no explicit standards (IS/ISO) are listed in the available data.

Terms, Conditions & Eligibility

  • EMD/payment terms: not specified in the provided data; bidders should anticipate standard government tender requirements.
  • Delivery timeline: extension policy based on added quantity; minimum delivery extension of 30 days; actual dates to be defined in the contract.
  • Documentation: advance sample submission required; if delays occur, delivery period may be reset; conformity checks govern bulk supply.
  • Penalties: not specified; potential termination if major deviations are found during sample approval; LD terms not detailed.
  • Sample costs: pre-bulk samples supplied by contractor; bulk supply contingent on approval.
  • Other: clothing sample references and inspection protocol are described in the buyer terms but not directly applicable to all listed items; ensure compliance with representative contract framework and test procedures.

Key Specifications

  • 14 listed automotive electrical items including: bulb fog lamp, W lamp bulb, warning lamp bulb, front direction indicator RH 24V, CA ignition switch, reverse switch, stop light switch, relay head lamp 24V, revolving light assy, hood light assy, ring oil seal inner, oil seal, S D wheel bolt

  • Advance sample submission within 5 days of award; approval or modification instructions follow within 5 days; bulk supply must align with approved sample

  • Option clause permits quantity variation up to 25% with corresponding delivery-time adjustments; minimum additional time is 30 days

  • Delivery period specifics will be derived from original and extended periods; if extended due to option clause, new period is calculated as (additional quantity / original quantity) × original delivery period

  • No explicit technical standards (IS/IS0/AAA) are listed in the provided data; conformity is enforced via sample approval and contract framework

Terms & Conditions

  • Up to 25% quantity variation allowed during contract and currency, with computed delivery extension.

  • Advance sample approval: submit 2 samples within 5 days of award; bulk supply contingent on sample conformity.

  • If samples are non-conforming, the buyer may require fresh samples or terminate the contract; pre-dispatch costs borne by contractor until approval.

  • Delivery schedule pivots on sample approval timing; delays in buyer approval may shift delivery timelines without LD.

Important Clauses

Payment Terms

Not specified in data; bidders should expect standard government terms with possible advance/ milestone payments per contract.

Delivery Schedule

Original delivery period can be extended based on option-quantity adjustments; additional time calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Not specified; potential for contract termination if major deviations are found during sample/approval process.

Bidder Eligibility

  • Experience in supplying automotive electrical components to government/defense sectors

  • Financial stability demonstrated by recent financial statements

  • Authorized OEM/Distributor for listed component categories (if applicable)

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

131

Category

Bulb fog lamp

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Bulb fog lamp , W lamp bulb , Warning lamp bulb , Ring oil seal inner , Oil seal , S D wheel bolt , Front direction indicator RH twenty four V , CA ignition switch , Reverse switch , Stop light switch , Low pressure indicator switch , Relay head lamp twenty four V , Revolving light assy , Hood light assy

Delivery Details

Max Delivery Days

21

Delivery Locations

1

Delivery Cities

KUPWARA

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KUPWARAKUPWARA--1821-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9978573.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

Bulb fog lamp

Bulb fog lamp

18 nos Delivery: 21 days
#2

W lamp bulb

W lamp bulb

18 nos Delivery: 21 days
#3

Warning lamp bulb

Warning lamp bulb

18 nos Delivery: 21 days
#4

Ring oil seal inner

Ring oil seal inner

4 nos Delivery: 21 days
#5

Oil seal

Oil seal

22 nos Delivery: 21 days
#6

S D wheel bolt

S D wheel bolt

10 nos Delivery: 21 days
#7

Front direction indicator RH twenty four V

Front direction indicator RH twenty four V

10 nos Delivery: 21 days
#8

CA ignition switch

CA ignition switch

5 nos Delivery: 21 days
#9

Reverse switch

Reverse switch

10 nos Delivery: 21 days
#10

Stop light switch

Stop light switch

4 nos Delivery: 21 days
#11

Low pressure indicator switch

Low pressure indicator switch

5 nos Delivery: 21 days
#12

Relay head lamp twenty four V

Relay head lamp twenty four V

5 nos Delivery: 21 days
#13

Revolving light assy

Revolving light assy

1 nos Delivery: 21 days
#14

Hood light assy

Hood light assy

1 nos Delivery: 21 days
Advertisement

Categories 5

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar automotive electrical component supply

4

Financial statements (last 2-3 years)

5

EMD/Security deposit proof (as applicable)

6

Technical bid documents demonstrating compliance with listed product categories

7

OEM authorization or agency appointment letters (if applicable)

8

Quality/assurance certificates relevant to electrical components

9

Any sample approval documents as required by the buyer

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for bulb lamp procurement in Kupwara army tender 2026

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD; provide OEM authorizations if required. Ensure 2 advance samples within 5 days of award and comply with the contract's sample approval framework before bulk supply begins.

What documents are required for Indian Army 24V components tender in Kupwara

Required documents include GST certificate, PAN, company's registration, experience certificates for similar projects, financial statements, EMD proof, and OEM authorizations. Technical bid should demonstrate capability to supply 24V automotive electrical items listed in the BOQ.

What are the delivery terms for 25% quantity variation in army tender

The contract allows ±25% quantity change during and after award. Delivery time extends proportionally using: (additional quantity/original quantity) × original delivery period, with a minimum of 30 days; ensure schedule alignment with approved samples.

What standards apply to Indian Army 24V equipment tender

Tender mentions sample approval as the conformity mechanism; explicit IS/ISO standards are not listed in available data. Vendors should provide any applicable OEM, quality, or testing standards with their bid and be prepared for conformity checks.

When is advance sample submission due for the Kupwara tender

Advance samples must be submitted within 5 days of award. The buyer will approve or request modifications within 5 days of receipt; bulk supply depends on approved samples and conformance to contract specifications.

What is the scope of items in the BOQ for this army tender

BOQ comprises 14 items including bulb lamps, indicators, ignition switches, relays, revolving and hood light assemblies, oil seals, wheel bolts. Quantities and unit details are not specified in the available data; bidders should plan for a multi-item supply across these categories.

Advertisement