Air Conditioner
Mahanadi Coalfields Limited
Progress
Quantity
1
Bid Type
Single Packet Bid
National Aluminium Company Limited (Nalco), Bhubaneswar invites bids for the Operator Cabin Air Conditioner in Angul, Odisha (759037). Scope: Supply of Goods only with a total delivery window of 165 days (120 days for supply from PO, 45 days for installation/commissioning). Payment terms specify 80% on receipt/acceptance at Nalco Central Store and 20% within 2 weeks after installation against an Acceptance Certificate. The procurement mandates a 12-month manufacturer’s warranty from site acceptance and requires a 5% CPBG. A development constraint limits quotes to Advance Cooling System Pvt. Ltd.; other vendors may be considered for future development. OEM authorization, test certificates, and government-lab chemical composition certificates are required documents. The contract must be executed with Nalco’s format CPBG and adherence to the stated delivery timeline.
CPBG of 5% to be submitted within 15 days from award, valid through warranty
Payment: 80% on receipt/acceptance at Nalco Central Store, 20% after installation against COA/Acceptance Certificate
Delivery window: 165 days total (120 days supply + 45 days install/commission)
80% after receipt/acceptance at Nalco Central Store; 20% within 2 weeks after installation on Acceptance Certificate.
Supply within 120 days of PO; installation/commissioning within 45 days; total 165 days.
Not specified in available data; adherence to CPBG and delivery timeline implied via contract.
Only Advance Cooling System Pvt. Ltd. is eligible under the development clause to quote
OEM authorization and manufacturer certification required
Bid must include test certificates confirming chemical composition
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Mahanadi Coalfields Limited
Institute Of Hotel Management
CHENNAI, TAMIL NADU
Indian Army
AMRITSAR, PUNJAB
Bharat Electronics Limited (bel)
BANGALORE, KARNATAKA
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Manufacturer Authorization / OEM authorization with full details
GST registration certificate
PAN card
Experience certificates (similar supply of operator cabin AC)
Financial statements (as required by Nalco terms)
EMD/CPBG documents per contract (5% of contract value)
Test certificates (vendor lab or Govt lab) with chemical composition
Delivery and installation plan in line with 165-day timeline
Acceptance certificate template or engineer-in-charge documentation
Any additional certificates requested in ATC/Corrigendum
Key insights about ODISHA tender market
To bid, obtain Manufacturer Authorization for the approved supplier, attach OEM details, include 5% CPBG, provide 12-month warranty proof, and submit test certificates showing chemical composition. Ensure delivery within 165 days (120 days supply, 45 days installation) and align with Nalco payment terms (80% on acceptance, 20% post-installation).
Documents include Manufacturer/OEM authorization with contact details, GST and PAN, financial statements, experience certificates for similar AC supply, test certificates from vendor or govt lab, CPBG 5%, bid security, and installation plan matching 165-day schedule.
Delivery must occur within 120 days of PO, with installation and commissioning completed within 45 days, totaling 165 days from award. Delay may lead to penalties or non-acceptance if terms aren’t met by the engineer’s certificate.
A 12-month manufacturer’s warranty from site acceptance is required. Include test certificates from vendor lab or government lab confirming chemical composition along with dispatch documents for traceability.
A Contract Performance Bank Guarantee (CPBG) equal to 5% of contract value (excluding taxes) must be submitted in Nalco’s prescribed format within 15 days of award and remains valid beyond warranty for 60 days.
Only M/s. ADVANCE COOLING SYSTEM PVT. LTD. is eligible to quote under the stated development initiative; other vendors are restricted unless notified for future development initiatives.
Nalco pays 80% on receipt/acceptance at central store and the remaining 20% within 2 weeks after installation against Acceptance Certificate issued by the Engineer-in-Charge, contingent on successful commissioning.
Bid submissions must include Manufacturer Authorization, OEM details, test certificates demonstrating chemical composition, and any mandatory certificates listed in ATC/Corrigendum; non-submission may lead to rejection.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS